GREEN INDUSTRIAL SOLUTIONS · YUSHUNXIN SYSTEM HUB
Complete Green Industrial Solutions Organized by Material and System Boundary
Explore project pathways that connect material assessment, founga ngaue 'enisinia, me'angaue fakatahataha'i, ngaahi sisitemi 'o e 'atakai, output handling and delivery planning. Published capacities and module descriptions remain planning references until the complete project boundary is reviewed.
HOW TO USE THE SOLUTION HUB
Start with the material, then define the complete operating system.
- 01
Choose the material stream
Makakasa, photovoltaic panel, pelesitiki, hela, sludge or aluminum packaging feedstock.
- 02
Connect the system layers
Review pre-treatment, ngaue tefito, fakamavahe'i, pule'i 'o e 'atakai, utilities and outputs.
- 03
Define the project boundary
Confirm operating basis, site interfaces, delivery scope, economics and the next decision stage.
COMPLETE SOLUTION FAMILIES
Choose by material stream, process route and project objective.
Each solution family connects suitable inputs, process sequence, integrated modules, 'atakai mo e ngaahi fetu'utaki'anga 'o e saiti, output boundaries, planning tools and next actions.
BATTERY RECYCLING
Ngaahi fakalelei'anga ki hono toe ngaue'aki 'o e ngaahi maka Litiume
Plan the line around battery source, fetokanga'aki, discharge status, input format and required material streams.
- Pēketi, module, cell and production-scrap questions
- Pre-treatment and safety boundary
- Modular equipment and project scope
PHOTOVOLTAIC RECYCLING
Pule'i 'o e Toe Ngaue'aki 'o e Panel 'o e La'aa
Fakafehoanaki 'o e veteki, size reduction and separation modules to panel construction, condition and project volume.
- Single-glass and double-glass project routes
- Frame, junction-box and laminate handling
- Disassembly and downstream process options
THERMAL TREATMENT
Ngaahi sisitemi Pyrolysis pelesitiki veve
Review plastic suitability, kimu'a 'i he faito'o, liliu mafana, condensation, gas handling and outputs as one project boundary.
- Meʻakai, chlorine, moisture and contamination review
- Reactor, condensation and tail-gas interfaces
- Lolo, kasa, residue and site-handling boundary
TIRE TREATMENT
Ngaahi sisitemi Pyrolysis 'o e pa'anga veve
Map tire preparation, reactor configuration and output handling to the operating plan and site.
- Tire size reduction and feeding requirements
- Thermal process, gas and condensation interfaces
- Lolo, carbon and steel output handling
SLUDGE TREATMENT
Ngaahi Sisitemi Pyrolysis 'o e 'umea
Define moisture, drying and conditioning requirements before integrating thermal treatment and downstream handling.
- Ma'unga fakamatala, moisture and contaminant boundary
- Drying, feeding and thermal-process interfaces
- Gas, condensate and solid-output handling
METAL PACKAGING
Laine 'o e 'aluminiume 'e lava ke De-coating
Review incoming scrap condition, teuteu'i, to'o 'o e 'ufi'ufi, off-gas control and downstream metal-processing interfaces.
- UBC preparation and contamination boundary
- De-coating furnace and environmental controls
- Melting, casting and recovered-metal interface
LINE CONFIGURATIONS & CORE MODULES
Compare equipment roles inside the complete process boundary.
Capacity labels describe the intended configuration class. Final operating basis depends on the submitted material, hala ngaue, utilities and acceptance boundary.
Battery line1000kg/h Laine 'o e 'uhila 'o e LitiumeTarget configuration page →
Project solutionNgaahi fakalelei'anga 'o e poloseki 'o e toe ngaue'aki 'o e EV BatteryProject route →
Commercial planningLithium Battery Recycling Machine Price FactorsCost boundary →
PV equipmentNgaahi me'angaue ki hono veteki 'o e Panel 'o e La'aaEquipment role →
Commercial planningSolar Panel Recycling Machine Cost FactorsCost boundary →
EXPLORE THE FULL KNOWLEDGE CLUSTER
Follow every active solution, process, configuration and planning page by material family.
This index connects the complete solution overview, process notes, line configurations and commercial-planning pages while preserving every established URL.
Toe ngaue'aki 'o e ngaahi maka litiume
Move from project scope to line class, EV feedstock questions, technology context and cost boundaries.
Toe ngaue'aki 'o e panel la'aa
Compare panel construction, mechanical and thermal routes, line classes, disassembly and cost planning.
- Solar panel recycling solution overview
- Single-glass PV project route
- Double-glass PV project route
- 500kg/h solar panel plant
- 1000kg/h solar panel plant
- Solar panel disassembly equipment
- PV recycling equipment planning guide
- PV mechanical recycling technology
- PV pyrolysis technology
- Solar panel pyrolysis project solution
- Solar panel machine cost factors
Pyrolysis pelesitiki
Connect feedstock evaluation, plastic-to-fuel process context and commercial-planning questions.
Pyrolysis 'o e ta'a
Review the system route, conversion context and the variables that shape a project budget.
Sludge and aluminum recovery
Open the active sludge-treatment and aluminum-preparation pathways.
COMPLETE SCOPE & APPROVAL BOUNDARY
What the solution can connect now—and what still needs project confirmation.
Useful planning inputs
Material source, fa'u, makatu'unga, fotunga fakahu, available volume, site status, operating plan and decision stage.
Confirmed later
Final configuration, malava lahi taha, power, fokotu'utu'u, output specification, schedule, certification scope and commercial terms.
SITEPU HOKO
'Ave 'a e ngaahi mo'oni'i me'a 'o e poloseki kimu'a pea toki fili 'a e lisi 'o e ngaahi me'angaue faka'osi ..
YUSHUNXIN reviews the submitted boundary before providing configuration or commercial guidance.