Connect recovered-liquid characterization, conditioning, generator selection and electrical integration in one project scope.

YUSHUNXIN ENERGY INTEGRATION

Match pyrolysis-oil conditioning to the generator and operating duty.

Tire-derived and plastic-derived liquids differ in sulfur, solids, viscosity, light fractions and wax behavior. The generator package must be selected after fuel sampling and an agreed conditioning route.

Reference continuous pyrolysis line connected to downstream energy use
01 / FUEL PATH

Do not connect raw recovered liquid directly to a standard genset by assumption

The conditioning train should be based on representative fuel analysis and the engine supplier's written limits.

  1. 01Settling and bulk separation
  2. 02Filtration and solids control
  3. 03Water separation
  4. 04Temperature and viscosity conditioning
  5. 05Day-tank and fuel-supply control
  6. 06Compatible engine and exhaust system
02 / DESIGN QUESTIONS

Make the fuel and electrical boundaries explicit

A practical proposal connects fuel variability, generator duty and site infrastructure.

Fuel characterization

Analyze density, viscosity, water, sediment, sulfur, flash point, distillation behavior and any wax or halogen concern.

Engine compatibility

Confirm whether the application requires a heavy-fuel, dual-fuel or other approved engine configuration.

Duty profile

Separate continuous base-load, variable-load, standby and islanded-power applications; they impose different controls and redundancy.

Electrical integration

Define voltage, frequency, synchronization, transformer, switchgear, protection and any grid-connection requirements.

03 / OPERATING SAFEGUARDS

Plan storage, fire protection and emissions with the generator package

Commercial evaluation remains conditional on the local fuel classification and permitting route.

Storage and transfer

Use compatible tanks, bunding, ventilation, temperature control, filtration bypass management and spill response.

Quality release

Set a fuel release test and reject route so off-spec batches do not reach the engine.

Maintenance model

Budget for injectors, filters, lubricant monitoring, deposits and exhaust after-treatment based on actual fuel quality.

Energy balance

Compare recoverable fuel, internal thermal demand, generator consumption, auxiliary loads and usable net electricity.

REFERENCE CONFIGURATION

Translate project facts into an equipment list.

This reference matrix shows the decision logic. Final quantities, models and interfaces belong in the approved project proposal.

System blockTypical scopeConfiguration basis
Bulk fuel handlingSettling, storage, bunding and controlled transferFuel classification and representative analysis
Conditioning skidFiltration, water separation and temperature or viscosity controlWritten engine fuel limits
Fuel supplyDay tank, circulation, metering, isolation and reject routeDuty cycle and off-spec management
Generator packageCompatible engine, controls, exhaust and safety systemsApproved fuel, load profile and maintenance basis
Electrical and heat recoverySwitchgear, protection, synchronization and optional heat interfaceSite electrical boundary and usable energy demand
STAGE-GATED DECISION PATH

Advance the project only when the required evidence is available.

Each gate turns customer information into a defined technical or commercial output for the next decision.

01

Fuel evidence

Sample the recovered liquid and define batch variability.

OutputFuel-analysis and classification record
02

Compatibility review

Compare the analysis with written engine and conditioning limits.

OutputApproved fuel-conditioning boundary
03

Site integration

Define duty, electrical protection, storage, fire and exhaust interfaces.

OutputSingle-line and interface basis
04

Commercial proposal

Quote only against the approved fuel, duty and delivery boundary.

OutputTraceable configuration and exclusions
PROJECT FAQ

Questions to resolve before configuration.

Answers define the engineering boundary; they do not replace representative material testing or local compliance review.

Can untreated pyrolysis oil be used in any diesel generator?

No. Fuel analysis, conditioning and written engine compatibility limits are required. Standard high-speed diesel engines should not be assumed compatible.

What fuel tests should be prepared?

Typical evaluation includes density, viscosity, water, sediment, sulfur, flash point, distillation behavior and any wax or halogen concern.

What is included beyond the generator?

The project may require settling, filtration, water separation, temperature control, storage, day tanks, fire protection, switchgear, synchronization and exhaust treatment.

How should net electrical output be evaluated?

Compare usable conditioned fuel, internal thermal demand, generator consumption, auxiliary loads, operating duty and electrical losses under the agreed project basis.

PROJECT ENGINEERING REVIEW

Define the material before selecting the equipment.

Share a representative material description, available volume, site status and target outputs. YUSHUNXIN will use those facts to prepare the relevant process boundary and configuration discussion.

Start Project Review