Lithium Battery Recycling Machine Price — Cost Factors and Quote Inputs
A meaningful price starts with a defined project scope. Vstupní suroviny, předúprava, procesní cesta, equipment modules, controls, site conditions and service boundaries all affect the proposal.
YUSHUNXIN does not use an unsupported website price as a substitute for a technical configuration.
Project view
Materiál / outputPrice starts with the material and delivery boundary
The original price page compared battery types, outputs and commercial scenarios. The deeper version keeps that decision support but removes unsupported public price ranges and profit claims.
01EV power batteries
Balíček, module and cell boundaries can add different discharge, demontáž, handling and feeding requirements to the scope.
02Consumer and 3C batteries
Small mixed formats may change containment, feeding, sorting and labor assumptions compared with automotive material.
03Energy-storage batteries
Module design, chemie, site handling and state-of-charge informátion should be included in the commercial review.
04Production scrap
Electrode and manufacturing scrap can enter the route at different stages, changing upstream equipment and output expectations.
Build a quote from project inputs
Replace unsupported public figures with a transparent scoping sequence. Expand each stage to see the engineering questions that should be resolved before approval.
01Define feedstock+

Record chemistry, formát, condition and variation.
- Input to confirm: format, chemie, condition and variation at this step.
- Scope decision: included equipment, optional controls and customer-supplied items.
- Acceptance point: define the handover, sampling or operating check in the approved specification.
02Review the process+

Select modules against output and site goals.
- Input to confirm: formát, chemie, condition and variation at this step.
- Scope decision: included equipment, optional controls and customer-supplied items.
- Acceptance point: define the handover, sampling or operating check in the approved specification.
03Set the boundary+

Identify customer items, veřejné služby, services and delivery scope.
- Input to confirm: formát, chemie, condition and variation at this step.
- Scope decision: included equipment, optional controls and customer-supplied items.
- Acceptance point: define the handover, sampling or operating check in the approved specification.
04Resolve open items+

Separate confirmed, project-dependent and pending facts.
- Input to confirm: formát, chemie, condition and variation at this step.
- Scope decision: included equipment, optional controls and customer-supplied items.
- Acceptance point: define the handover, sampling or operating check in the approved specification.
05Issue a proposal+

Tie commercial terms to the approved configuration version.
- Input to confirm: formát, chemie, condition and variation at this step.
- Scope decision: included equipment, optional controls and customer-supplied items.
- Acceptance point: define the handover, sampling or operating check in the approved specification.
Eight cost drivers a comparable proposal should make visible
Price comparison is useful only when every supplier is quoting the same technical and service boundary.
01Feedstock window
Chemistry, formát, stav, kontaminace, variation and exclusions define the review basis.
02Pre-treatment scope
Discharge, demontáž, isolation and storage may be customer responsibilities or part of the proposed project.
03Core process modules
Krmení, size reduction, conditioning, screening and separation are selected from the reviewed route.
04Controls and auxiliaries
Material handling, dust and gas controls, alarms, monitoring and records should be listed separately.
05Site integration
Electrical standard, veřejné služby, available area, access and local conditions affect engineering and services.
06Delivery and service
Packing, logistiky, installation support, commissioning, training and customer-supplied items should be explicit.
07Output acceptance
Sampling, test material, output categories and acceptance criteria determine how the project will be evaluated.
08Version and owner
Each proposal should reference the approved configuration version, open items and responsible owner.
Questions to ask when two prices look very different
A lower number may represent a smaller technical or service boundary rather than a better equivalent solution.
Are inputs identical?
Same chemistry, formát, stav, pre-treatment and material-supply assumptions.
Are modules identical?
Same core equipment, auxiliaries, controls, collection and safety-related project interfaces.
Are services identical?
Same logistics, instalace, commissioning, training and customer-supplied items.
Are guarantees comparable?
Same test feedstock, provozní podmínky, sampling method and acceptance process.
Quote input checklist
This table separates the current planning basis from items that require material tests, site information or written human approval.
| Project item | Current basis | Status |
|---|---|---|
| Battery chemistry | Defines the review basis | Customer input |
| Input format | Defines pack/module/cell/scrap boundary | Customer input |
| Pre-treatment status | Clarifies upstream scope | Customer input |
| Material supply | Supports target review | Customer input |
| Desired outputs | Defines separation scope | Customer input |
| Site and utilities | Affects integration | Customer input |
| Delivery boundary | Defines proposal inclusion | To confirm |
| Commercial terms | Tied to approved scope | Human gate |
Connect commercial value to the required output fractions
Output categories influence process selection, but their value cannot be inferred from images or generic website figures.
01Black-mass-bearing powder
Clarify downstream buyer or process, sampling, moisture and particle-size expectations.
02Copper-bearing fraction
State whether the commercial boundary requires a foil-rich fraction or further downstream separation.
03Aluminum-bearing fraction
Define contamination and collection expectations in the reviewed technical scope.
Acceptance discipline: Výtěžek, čistota, capacity and recovery values are not assumed from a website description. They must be tied to the approved feedstock, test basis and written project specification.
Get the right response for your current decision stage
Tell YUSHUNXIN whether you are researching, testing feasibility, comparing suppliers or preparing procurement. The project brief routes the next conversation around the information you have now.
Why YUSHUNXIN uses project-specific pricing
YUSHUNXIN aligns the commercial proposal with the reviewed process and equipment scope, making assumptions visible and helping customers compare proposals on the same basis.
Confirmed facts
Approved material data and project requirements are shown as the basis of the proposal.
Project-dependent items
Configuration choices remain conditional until the feedstock and site have been reviewed.
Human approval gates
Commercial terms, final performance and compliance statements require authorized review.
Version control
The proposal should identify the approved configuration version, assumptions and open questions.
Questions project teams ask before a proposal
Why is there no fixed machine price?+
A number without defined feedstock, process and delivery boundaries can be misleading.
Does a higher target capacity mean the same process with larger machines?+
No. Material handling, process balance, controls, site integration and operating plan may also change.
What is needed for an initial proposal?+
Provide chemistry, formát, stav, photos or analysis, supply, target input, schedule, country, utilities and outputs.
Does the proposal guarantee local compliance?+
No blanket guarantee is made. The customer and qualified local parties confirm permits and applicable requirements.
Can performance values be included?+
Only after ProductLead approves the value, source, conditions and acceptance method.
Continue your project research
Commercial scope definition
Price follows the selected safety and process modules, environmentální kontroly, automation and local delivery scope.
Incoming material
Chemistry, formát, state of charge, throughput, site and support requested.
Expected outputs
Written configuration, scope split, exclusions, utility schedule and budgetary quotation.
Project interfaces
Building, fire protection, power, instalace, povolení, logistiky, commissioning, spares and training.
Use only the row matching the selected process boundary.
| Catalogue reference | Kapacita | Moc | Physical envelope | Included boundary |
|---|---|---|---|---|
| YSX public familyPublic equipment family | 500–1,000 kg/h | 102–238 kW | 20–35 m line; 7.5–19.5 t | Standard equipment-family envelope; no per-model allocation |
| YSX-LR500LR complete line | 500 kg/h | 320 kW | 40 × 15 × 7.5 m | Conditioning, separation and gas-treatment line |
| YSX-LR1000LR complete line | 1,000 kg/h | 410 kW | 45 × 17 × 7.5 m | Conditioning, separation and gas-treatment line |
| Project reference - 500Earlier integrated layout | 500 kg/h | 300 kW | 60 × 7 × 7 m | Earlier layout without a published model label |
| Project reference - 1000Earlier integrated layout | 1,000 kg/h | 349 kW | 80 × 7 × 7 m | Earlier layout without a published model label |
Configuration rule: catalogue capacity is a planning reference. Stable throughput, installed/operating power, footprint, recovery, čistota, emissions and utility demand require the approved equipment list, representative material and written acceptance conditions.
Information required before configuration and quotation
- Representative material photos, specifications and available sample.
- Required capacity plus hours per shift, shifts per day and operating days.
- Cílové výstupy, sampling method and downstream receiver requirements.
- Site country, available power, fuel, voda, compressed air and building limits.
- Local environmental, fire, storage and occupational-safety requirements.
- Requested delivery boundary: zařízení, rozložení, instalace, commissioning and training.