01 EV power batteries Pakke, module and cell boundaries can add different discharge, demontering, handling and fodring requirements to the scope.
02 Consumer and 3C batteries Small mixed formats may change containment, feeding, sorting and labor assumptions compared with automotive material.
03 Energy-storage batteries Module design, kemi, site handling and state-of-charge information should be included in the commercial review.
04 Production scrap Electrode and manufacturing scrap can enter the route at different stages, changing upstream equipment and output expectations.
01 Technical basis Feedstock window Chemistry, format, tilstand, forurening, variation and exclusions define the review basis.
02 Upstream boundary Pre-treatment scope Discharge, demontering, isolation and storage may be customer responsibilities or part of the proposed project.
03 Equipment scope Core process modules Fodring, size reduction, conditioning, screening and separation are selected from the reviewed route.
04 System scope Controls and auxiliaries Material handling, dust and gas controls, alarms, monitoring and records should be listed separately.
05 Project conditions Site integration Electrical standard, forsyningsselskaber, available area, access and local conditions affect engineering and services.
06 Kommerciel grænse Delivery and service Packing, logistik, installationsstøtte, idriftsættelse, training and customer-supplied items should be explicit.
07 Performance basis Output acceptance Sampling, test material, output categories and acceptance criteria determine how the project will be evaluated.
08 Change control Version and owner Each proposal should reference the approved configuration version, open items and responsible owner.
01 Are inputs identical? Same chemistry, format, tilstand, pre-treatment and material-supply assumptions.
02 Are modules identical? Same core equipment, auxiliaries, controls, collection and safety-related project interfaces.
03 Are services identical? Same logistics, installation, idriftsættelse, training and customer-supplied items.
04 Are guarantees comparable? Same test feedstock, driftsforhold, sampling method and acceptance process.
01 Black-mass-bearing powder Clarify downstream buyer or process, sampling, moisture and particle-size expectations.
02 Copper-bearing fraction State whether the commercial boundary requires a foil-rich fraction or further downstream separation.
03 Aluminum-bearing fraction Define contamination and collection expectations in the reviewed technical scope.
EN Confirmed facts Approved material data and project requirements are shown as the basis of the proposal.
B Project-dependent items Configuration choices remain conditional until the feedstock and site have been reviewed.
C Human approval gates Commercial terms, final performance and compliance statements require authorized review.
D Version control The proposal should identify the approved configuration version, assumptions and open questions.
02Forventede outputWritten configuration, scope split, exclusions, utility schedule and budgetary quotation.
03ProjektgrænsefladerBuilding, fire protection, power, installation, tilladelser, logistik, idriftsættelse, spares and training.