YUSHUNXIN SOLAR PANEL RECYCLING

Solar Panel Recycling Management for Single-Glass and Mixed PV Streams

Choose the process route from panel construction, condition and project output—not from a generic equipment list. YUSHUNXIN connects deframing, glass separation, mechanical processing or thermal delamination into a reviewable project boundary.

YUSHUNXIN mechanical solar panel recycling plant
Mechanical route referenceExisting media-library image retained for process context.

DECISION SNAPSHOT

Define four inputs before discussing line configuration.

01

Panel construction

Single-glass, double-glass or a mixed end-of-life stream.

02

Incoming condition

Whole modules, damaged panels, removed frames or pre-processed laminate.

03

Supply basis

Available volume, batch profile, working schedule and storage method.

04

Output boundary

Separated frame and glass, silicon-bearing fraction or further metal recovery.

ROUTE SELECTION

Mechanical and thermal routes solve different feedstock problems.

The final choice requires representative panel data and an agreed output definition.

MIXED / DOUBLE-GLASS THERMAL ROUTE

Use controlled thermal delamination within a broader line.

Supports single- and double-glass mixed streams where EVA or backsheet delamination changes the downstream recovery path.

  • Frame removal and feed preparation
  • Thermal treatment and tail-gas handling
  • Glass separation
  • Silicon and metal-bearing fraction recovery

PROCESS MEDIA & ROUTE CONTEXT

See how the process route changes the equipment sequence.

The images and video connect panel condition, process choice and equipment sequence to the decisions they help explain.

PROCESS VIDEO

Solar panel frame and glass removal

Use this original demonstration to understand the disassembly stage before reviewing the complete line.

PROCESS MODULES

Build the line around material movement and separation objectives.

  1. 01

    Receive and classify

    Confirm dimensions, építés, breakage, junction-box status and storage condition.

  2. 02

    Remove external components

    Separate frames and other removable components before laminate treatment.

  3. 03

    Select delamination route

    Mechanical glass separation for suitable single-glass panels, or project-reviewed thermal treatment for mixed construction.

  4. 04

    Liberate and separate

    Size reduction, physical separation, dust control and controlled material collection.

  5. 05

    Define acceptance

    Agree how outputs will be sampled, measured and handed to the next process or buyer.

APPROVED REFERENCE ENVELOPE

Reference models for early planning—not universal performance promises.

Útvonal / modelReference basisIncluded process modules
YSX-1000 mechanical lineKörülbelül 1 t/h; total power about 277.6 kW; reference envelope about 36 × 6 × 6 mDeframing, glass removal, zúzó, elválasztás, porszabályozás, PLC and collection
YSX-8000 thermal routeKörülbelül 8 t/day referenceDeframing, thermal delamination, glass separation, downstream separation and tail-gas handling
YSX-16000 thermal routeKörülbelül 16 t/day referenceConfigured for a reviewed mixed single-/double-glass feedstock and site basis

All figures shown are published configuration references. Actual throughput, power, layout and output requirements need feedstock, site and project confirmation.

ENGINEERING INPUTS

What the project desk needs from you.

Material sample

Panel datasheets, construction mix, photos and representative sample availability.

Operating basis

Daily or hourly supply, working days, közművek, storage and labor assumptions.

Site boundary

Available footprint, building condition, emissions requirements and downstream logistics.

Decision boundary

Feasibility, budget, supplier comparison, procurement timing and required documents.

PROJEKT GYIK

Resolve the route before comparing quotations.

Can one line process both single- and double-glass panels?

A mixed stream may require a different delamination route and control boundary. Provide the expected construction mix so the team can review whether one configuration is appropriate.

Are the listed capacities guaranteed?

Nem. They are approved reference configurations. Actual performance depends on panel construction, állapot, feeding pattern, operating schedule and acceptance method.

Which outputs are included?

The project can be planned around aluminum frame, glass and silicon- or metal-bearing fractions. Purity and downstream readiness must be defined and tested for the agreed feedstock.

What environmental information is required?

Share destination-country requirements, site conditions and the expected thermal or dust-control boundary. Local permitting and compliance remain project-specific.

START THE PV REVIEW

Submit the panel construction and operating basis.

The form records your raw material and decision stage for focused technical follow-up.

Open Project Brief

APPROVED CATALOGUE CONFIGURATION MAP

Choose the PV process route before choosing a capacity label.

YUSHUNXIN catalogue models describe different system boundaries. Power and footprint from one route must not be assigned to another.

ROUTE 01

Single-glass mechanical separation

Best used when front glass and frame removal can be engineered before controlled size reduction and dry separation.

  1. 01Pre-disassemblyConfirm junction-box, cable, frame and module construction.
  2. 02Glass removalSet the release method against single-glass laminate condition.
  3. 03Size reductionShred, crush and mill only to the required liberation size.
  4. 04ClassificationUse screening, gravity and electrostatic duties as configured.
  5. 05Output acceptanceSample glass-, copper-, szilícium- and polymer-bearing fractions.
Catalogue labelKapacitásTotal powerCatalogue footprintBoundary
YSX-M10001 t/h277.6 kW36 × 6 × 6 mIntegrált mechanikus vonal

An earlier group catalogue prints YSX-1000 against the same 1 t/h, 277.6 kW and 36 × 6 × 6 m reference. The website keeps the newer YSX-M1000 label and records the older label as catalogue history.

Acceptance ruleKapacitás, power, lábnyom, kimeneti minőség, emissions controls and utility demand are released on the approved configuration, layout and technical agreement.