YUSHUNXIN · EV project planning

EVバッテリーリサイクルプロジェクトソリューション

Build the project brief before choosing the line. EV packs, modules and cells require different receiving, 放電, 解体, feeding and separation decisions.

YUSHUNXIN uses the supplied battery profile and site information to prepare a project-specific process and equipment configuration for review.

Input boundaryパック, module or cell
First decisionDischarge and dismantling
Proposal basisDefined downstream handover
Lithium Battery Crushing Recycling LinesProject view
Lithium Battery Crushing Recycling Lines材料 / 出力
01 · Feedstock and project fit

Define what reaches the EV battery line—and in what condition

The original EV page documented a detailed processing sequence. This rebuild retains that technical depth while separating universal project decisions from optional process steps.

EV batteries01

Complete packs

Pack architecture, isolation, 充電状態, cooling circuits and dismantling responsibility must be documented before downstream line selection.

EV Battery02

Separated modules

Module construction and remaining electrical or mechanical connections affect handling, feeding and the upstream safety boundary.

Electronic Product Battery Recycling03

Individual cells

Cell format, 化学, condition and variation influence containment, feeding and size-reduction choices.

Production Waste04

Production and mixed scrap

Electrode, cell and assembly scrap may bypass some upstream steps. 水分, binder, foil composition and contamination should be reported.

02 · Process framework

EV battery project decision path

The route follows the material boundary and the desired downstream handover. Expand each stage to see the engineering questions that should be resolved before approval.

01Material identification+
shredding

Establish chemistry, 形式, condition and variation.

  • Input to confirm: 形式, 化学, condition and variation at this step.
  • Scope decision: included equipment, optional controls and customer-supplied items.
  • Acceptance point: define the handover, sampling or operating check in the approved specification.
02Discharge and dismantling+
Pyrolysis

Define the customer and equipment boundaries for upstream preparation.

  • Input to confirm: 形式, 化学, condition and variation at this step.
  • Scope decision: included equipment, optional controls and customer-supplied items.
  • Acceptance point: define the handover, sampling or operating check in the approved specification.
03Feeding and size reduction+
cooling conveying screw

Configure the core equipment for the approved material.

  • Input to confirm: 形式, 化学, condition and variation at this step.
  • Scope decision: included equipment, optional controls and customer-supplied items.
  • Acceptance point: define the handover, sampling or operating check in the approved specification.
04Conditioning and separation+
Fine Crushing

Select suitable preparation and separation modules.

  • Input to confirm: 形式, 化学, condition and variation at this step.
  • Scope decision: included equipment, optional controls and customer-supplied items.
  • Acceptance point: define the handover, sampling or operating check in the approved specification.
05Output handover+
drum separator

Define collection, sampling, storage and downstream transfer.

  • Input to confirm: 形式, 化学, condition and variation at this step.
  • Scope decision: included equipment, optional controls and customer-supplied items.
  • Acceptance point: define the handover, sampling or operating check in the approved specification.
06Site controls+
Magnetic Separation

Document monitoring and control modules for project review.

  • Input to confirm: 形式, 化学, condition and variation at this step.
  • Scope decision: included equipment, optional controls and customer-supplied items.
  • Acceptance point: define the handover, sampling or operating check in the approved specification.
03 · Equipment and system boundary

EV battery process modules and their decision logic

Each image comes from the original EV project page. The sequence is illustrative; the final route may use, omit or add modules after material review.

shredding01
Core preparation

Controlled shredding

The approved feed format is reduced under a defined feeding and containment strategy. The project scope should identify upstream discharge and dismantling responsibilities.

Pyrolysis02
Optional route

Material conditioning

Thermal or other conditioning may be considered for selected material and downstream objectives. It is not assumed for every EV battery project.

cooling conveying screw03
Interface control

Cooling and transfer

Where a conditioning stage is used, cooling and controlled transfer must be included in the material-flow and monitoring design.

Fine Crushing04
Particle preparation

Fine size reduction

Additional crushing or milling is selected to prepare material for the proposed separation route and target output fractions.

drum separator05
Screening stage

Powder separation

Drum or other screening may collect powder-bearing material and classify larger fractions before further separation.

Magnetic Separation06
Ferrous control

磁気分離

A magnetic stage may remove ferrous-bearing material at a point defined by the selected process sequence.

Grinding mill07
Project-dependent

Grinding or pulverization

Further particle preparation is considered only when the feed condition and downstream separation targets justify it.

density separation08
Material separation

Density-based sorting

Density or airflow sorting may separate prepared copper-, アルミニウム- and residual fractions. Acceptance criteria should be stated in writing.

04 · Decision detail

EV project boundaries that prevent scope gaps

Most commercial misunderstandings start upstream or downstream of the core machines.

01

Discharge boundary

Who confirms state of charge, performs discharge and provides the required records.

02

Dismantling boundary

Whether packs arrive complete, as modules, as cells or after customer pre-treatment.

03

Output handover

How powder- and metal-bearing fractions are sampled, packaged, stored and transferred.

04

Local project boundary

Permits, fire strategy, utilities and local requirements confirmed by the customer and qualified local parties.

05 · Technical clarification table

EV project checklist

This table separates the current planning basis from items that require material tests, site information or written human approval.

Project item Current basis Status
Battery source お客様のご意見 To confirm
化学 LFP / NCM / mixed / unknown To confirm
Input format パック / モジュール / cell / scrap To confirm
State of charge お客様のご意見 To confirm
Dismantling status お客様のご意見 To confirm
Material supply お客様のご意見 To confirm
Target throughput お客様のご意見 Engineering gate
Process and outputs Based on review Project-dependent
06 · Output and acceptance

Plan the downstream handover before procurement

Output images illustrate possible material categories from the original page. They are not promises of yield or purity.

final products01

Separated output categories

Use representative feedstock and a written sampling plan to define the expected downstream handover.

black mass from battery recycling02

Black-mass-bearing powder

Confirm collection, sampling, 水分, particle-size and downstream acceptance requirements.

Copper foil from battery recycling03

Copper- and aluminum-bearing fractions

Define the required separation boundary and allowable residual material in the technical specification.

Acceptance discipline: Yield, 純度, capacity and recovery values are not assumed from a website description. They must be tied to the approved feedstock, test basis and written project specification.

07 · Decision-stage support

Get the right response for your current decision stage

Tell YUSHUNXIN whether you are researching, testing feasibility, comparing suppliers or preparing procurement. The project brief routes the next conversation around the information you have now.

研究Clarify material and process options.
実現可能性Review tests, site and project boundary.
Supplier comparisonAlign scope and acceptance method.
調達Resolve open items for an approved proposal.
08 · Engineering communication

Why work with YUSHUNXIN

YUSHUNXIN organizes the discussion around the EV battery decision path: 入力条件, upstream preparation, core process, output handling and site interface.

あ

Confirmed facts

Approved material data and project requirements are shown as the basis of the proposal.

B

Project-dependent items

Configuration choices remain conditional until the feedstock and site have been reviewed.

C

Human approval gates

Commercial terms, final performance and compliance statements require authorized review.

D

Version control

The proposal should identify the approved configuration version, assumptions and open questions.

09 · Frequently asked questions

Questions project teams ask before a proposal

Can one line process both LFP and NCM batteries?+

A mixed-chemistry project requires review of identification, separation goals and downstream handling.

Is discharge and dismantling always included?+

いいえ. The boundary depends on how material arrives and which upstream steps the customer performs.

Is material conditioning always required?+

いいえ. The decision depends on feedstock, process goals, site information and engineering review.

Can recovery rate and purity be confirmed before review?+

いいえ. Those results require feedstock, 構成, sampling and acceptance criteria.

What files are useful for the first review?+

Material photos, ドキュメント, 化学, state information, dismantling flow, analysis, supply estimate, site layout and desired outputs.

カタログに基づいたエンジニアリングベース

Pack-to-fraction project

Start with transport, diagnostic, discharge and pack/module dismantling responsibilities before the material line.

01

入荷素材

Vehicle battery system, pack architecture, 化学, residual energy, damage status and planned throughput.

02

期待される出力

Prepared modules/cells and classified downstream fractions according to the approved boundary.

03

プロジェクトインターフェース

Hazardous-goods receiving, 検疫, diagnostics, 放電, 解体, fire response and data traceability.

モデルとスコープのレジスタ

Use only the row matching the selected process boundary.

カタログ参照容量力物理的エンベロープ含まれる境界
YSXパブリックファミリー公共機器ファミリー500–1,000kg/h102–238kW20–35mライン; 7.5–19.5トン標準装備ファミリーエンベロープ; モデルごとの割り当てなし
YSX-LR500LRコンプリートライン500 kg/h320 kW40 × 15 × 7.5 メートルコンディショニング, 分離・ガス処理ライン
YSX-LR1000LRコンプリートライン1,000 kg/h410 kW45 × 17 × 7.5 メートルコンディショニング, 分離・ガス処理ライン
プロジェクトリファレンス - 500以前の統合レイアウト500 kg/h300 kW60 × 7 × 7 メートル公開されたモデル ラベルのない以前のレイアウト
プロジェクトリファレンス - 1000以前の統合レイアウト1,000 kg/h349 kW80 × 7 × 7 メートル公開されたモデル ラベルのない以前のレイアウト

設定ルール: カタログ容量は計画の参考値です. 安定したスループット, 設置/動作電力, フットプリント, 回復, 純度, 排出量と公共需要には承認された機器リストが必要です, representative material and written acceptance conditions.

設定やお見積りの前に必要な情報

  1. 代表的な資料写真, specifications and available sample.
  2. 必要なキャパシティにシフトごとの時間数を加えたもの, shifts per day and operating days.
  3. 目標出力, sampling method and downstream receiver requirements.
  4. 拠点の国, 利用可能な電力, 燃料, 水, compressed air and building limits.
  5. 地域環境, 火, storage and occupational-safety requirements.
  6. 要求された配送境界: 装置, レイアウト, インストール, commissioning and training.