YUSHUNXIN · Industrial target configuration

1000kg leti' h internet ichil u eliminación le batería litio

Plan an industrial target configuration around feedstock supply, battery format, pre-tratamiento, operating schedule, site utilities and required output fractions.

The page name is retained for URL and search continuity. It does not guarantee hourly or daily output for unreviewed material.

Configuration class1000kg/h target
Planning focusIndustrial material flow
AutomationDefined by project boundary
1000kgh Battery Processing LineProject view
1000kgh Lithium Battery Recycling FacilityNu'ukulil / output
01 · Feedstock and project fit

Industrial scale begins with supply continuity and site integration

The original 1000kg/h page focused on scale and automation. This rebuild turns those claims into a practical industrial planning framework covering receiving, buffer capacity, interfaces, maintenance and output handling.

Lithium Battery Disposal Line01

Supply continuity

Document contracted or forecast material supply, chemistry mix, format mix and variability. Industrial equipment should not be sized from a short-term sample alone.

1000kgh Lithium Battery Recycling Facility02

Receiving and buffer plan

Map unloading, isolation, identification, temporary storage and controlled transfer. Buffer design should reflect shift patterns and upstream variability.

1000kgh Battery Processing Line03

Automation boundary

Identify which material-handling steps, alarms, interlocks, records and interfaces must be automated. The word automated is not a complete specification.

lithium battery recycling equipment factory04

Maintenance and access

Industrial layout must include inspection, cleaning, replacement access, lifting needs and safe maintenance zones around the selected modules.

02 · Process framework

Industrial process framework

Industrial configuration is more than enlarging individual machines. Expand each stage to see the engineering questions that should be resolved before approval.

01Receiving and pre-treatment+
Lithium Battery Disposal Line

Define identification, éens, dismantling and storage boundaries.

  • Input to confirm: formato, kiimika, condition and variation at this step.
  • Scope decision: included equipment, optional controls and customer-supplied items.
  • Acceptance point: define the handover, sampling or operating check in the approved specification.
02Controlled feeding+
1000kgh Battery Processing Line

Configure feeding and size reduction for the approved operating basis.

  • Input to confirm: formato, kiimika, condition and variation at this step.
  • Scope decision: included equipment, optional controls and customer-supplied items.
  • Acceptance point: define the handover, sampling or operating check in the approved specification.
03Multi-stage separation+
electronic waste shredding machine

Arrange suitable screening, airflow, density and magnetic modules.

  • Input to confirm: formato, kiimika, condition and variation at this step.
  • Scope decision: included equipment, optional controls and customer-supplied items.
  • Acceptance point: define the handover, sampling or operating check in the approved specification.
04Collection and monitoring+
industrial gravity separation system

Define conveying, intermediate collection, alarms and records.

  • Input to confirm: formato, kiimika, condition and variation at this step.
  • Scope decision: included equipment, optional controls and customer-supplied items.
  • Acceptance point: define the handover, sampling or operating check in the approved specification.
05Site controls+
final products

Select control modules for the proposed route and documented local needs.

  • Input to confirm: formato, kiimika, condition and variation at this step.
  • Scope decision: included equipment, optional controls and customer-supplied items.
  • Acceptance point: define the handover, sampling or operating check in the approved specification.
03 · Equipment and system boundary

Industrial configuration requires coordinated modules and interfaces

Capacity class is only one input. The system also needs balanced feeding, jatsbil, collection, control and site interfaces.

Lithium Battery Disposal Line01
Upstream interface

Industrial receiving flow

Define the point where customer responsibility ends and the processing line begins, including identification, storage and controlled feeding.

1000kgh Battery Processing Line02
Flow stability

Controlled feeding

Buffering and feeding should match the reviewed material and planned operating schedule. The proposal should state monitoring and intervention points.

electronic waste shredding machine03
Process-dependent

Multi-stage size reduction

One or more stages may be used according to format, conditioning route and target particle state. Equipment selection follows material review.

industrial gravity separation system04
System balance

Screening and separation

Screening, airflow, density and magnetic stages are balanced as a system rather than selected independently.

final products05
Downstream interface

Collection and storage

Define containers, transfer, sampling, storage, dust control and downstream dispatch for each output category.

1000kgh Lithium Battery Recycling Facility06
Automation scope

Controls and records

The approved scope should describe alarms, interlocks, operator values, batch or shift records and interfaces with site systems.

04 · Decision detail

Industrial project decisions that should be written into the scope

A larger target configuration needs clearer ownership and interface definitions.

01

Material-flow ownership

Receiving, éens, desmontaje, feeding, intermediate storage and output dispatch.

02

Control philosophy

Operator roles, alarms, interlocks, shutdown boundaries, data records and maintenance modes.

03

Utilities and site

Electrical standard, installed power basis, ventilation, compressed air, access and available footprint.

04

Acceptance plan

Feedstock window, test material, sampling, performance conditions and documentation owners.

05 · Technical clarification table

1000kg/h project checklist

This table separates the current planning basis from items that require material tests, site information or written human approval.

Project item Current basis Status
Configuration class 1000kg/h target Controlled
Guaranteed output Not stated on website Locked
Feedstock supply basis Customer input To confirm
Chemistry and format From material profile To confirm
Operating schedule Customer input To confirm
Automation boundary Defined in proposal Dependiente ti' le proyecto
Utilities Based on site information To confirm
Material flow and layout Based on site review To confirm
06 · Output and acceptance

Design output handling as part of the line

At industrial scale, collection, sampling, storage and downstream transfer are part of system design—not an afterthought.

black mass from battery recycling01

Powder-bearing output

Confirm sealed collection, sampling, container handling and the downstream acceptance window.

final products02

Metal-bearing outputs

Copper-, aluminio- and ferrous-bearing fractions require defined collection and transfer points.

1000kgh Lithium Battery Recycling Facility03

Residual and recirculation streams

The proposal should identify residual material, recirculation and customer responsibilities for downstream handling.

Acceptance discipline: Yield, pureza, capacity and recovery values are not assumed from a website description. They must be tied to the approved feedstock, test basis and written project specification.

07 · Decision-stage support

Get the right response for your current decision stage

Tell YUSHUNXIN whether you are researching, testing feasibility, comparing suppliers or preparing procurement. The project brief routes the next conversation around the information you have now.

ResearchClarify material and process options.
FeasibilityReview tests, site and project boundary.
Supplier comparisonAlign scope and acceptance method.
MaanResolve open items for an approved proposal.
08 · Engineering communication

Why work with YUSHUNXIN

YUSHUNXIN combines equipment configuration with layout and project-input review, documenting assumptions and open items before an industrial scope is presented as final.

A

Confirmed facts

Approved material data and project requirements are shown as the basis of the proposal.

B

Project-dependent items

Configuration choices remain conditional until the feedstock and site have been reviewed.

C

Human approval gates

Commercial terms, final performance and compliance statements require authorized review.

D

Version control

The proposal should identify the approved configuration version, assumptions and open questions.

09 · Frequently asked questions

Questions project teams ask before a proposal

Is 1000kg/h a guaranteed throughput?+

Ma'. It is the target configuration represented by the existing page. Actual performance requires written technical confirmation.

Can daily output be calculated from the page name?+

Not as a public commitment. Availability, feed consistency, maintenance and operating conditions affect actual output.

What automation is included?+

The proposal should define material handling, u yila'al, alarms, interlocks, records and interfaces.

Does the line meet every country’s requirements?+

No blanket statement is made. The customer and qualified local parties confirm permits and applicable local requirements.

What should an industrial brief include?+

Include supply, kiimika, formato, pre-tratamiento, operating basis, outputs, kúuch, utilidades, country and integration needs.

BASE INGENIERÍA ALINEADA TI' CATÁLOGO

1,000 kg/h scope comparison

Use the 1,000 kg/h class only after defining the process modules included in the stable throughput measurement.

01

Xooko'ob ku yokol

Representative battery mix, incoming preparation, hourly schedule and acceptance targets.

02

Ba'ax ku páa'ta'al

Classified electrode-, copper-, aluminio- and iron-bearing fractions; measured results remain test-controlled.

03

Interfaces ti' le proyecto

Complete safety, environmental, utilidades, controls, storage and downstream scope.

REGISTRO MODELO YÉETEL ALCANCES

Use only the row matching the selected process boundary.

Referencia ti' le catálogoPáajtalilMuukSobre físicoLímite incluido
YSX public familyPublic equipment family500–1,000 kg/h102–238 kW20–35 m line; 7.5–19.5 tStandard equipment-family envelope; no per-model allocation
YSX-LR1000LR complete line1,000 kg/h410 kW45 × 17 × 7.5 mConditioning, separation and gas-treatment line
Project reference - 1000Earlier integrated layout1,000 kg/h349 kW80 × 7 × 7 mEarlier layout without a published model label

Regla u configuración: le Buka'aj u ba'al u catálogo jach jump'éel k'a'ana'an u planificación. Rendimiento estable, instalado/funcionamiento u páajtalil, u yooko'ob, ch'a' óol, pureza, emisiones yéetel demanda utilidad k'a'abet le tsoolol nu'ukulil aprobado, representative material and written acceptance conditions.

A'almaj t'aan k'a'abéet bey ma' u configuración yéetel cita

  1. Fotos u material representativo, specifications and available sample.
  2. Buka'aj u ba'al k'a'abéet asab horas tumen turno, shifts per day and operating days.
  3. Salidas objetivo, sampling method and downstream receiver requirements.
  4. Lu'umil le ts'ono'oto', páajtalil yaan, kóombustible, ja', compressed air and building limits.
  5. Ka'a jeets'el tu'ux, k'áak', storage and occupational-safety requirements.
  6. Límite u k'u'ubul k'áata'an: nu'ukulil, díisposision, instalación, commissioning and training.