GREEN INDUSTRIAL SOLUTIONS · YUSHUNXIN SYSTEM HUB
Complete Green Industrial Solutions Organized by Material and System Boundary
Explore project pathways that connect material assessment, مهندسی فرآیند, تجهیزات یکپارچه, سیستم های محیطی, output handling and delivery planning. Published capacities and module descriptions remain planning references until the complete project boundary is reviewed.
HOW TO USE THE SOLUTION HUB
Start with the material, then define the complete operating system.
- 01
Choose the material stream
Battery, photovoltaic panel, پلاستیک, تایر, sludge or aluminum packaging feedstock.
- 02
Connect the system layers
Review pre-treatment, پردازش هسته, جدایی, کنترل محیطی, utilities and outputs.
- 03
Define the project boundary
Confirm operating basis, site interfaces, delivery scope, economics and the next decision stage.
COMPLETE SOLUTION FAMILIES
Choose by material stream, process route and project objective.
Each solution family connects suitable inputs, process sequence, integrated modules, environmental and site interfaces, output boundaries, planning tools and next actions.
BATTERY RECYCLING
راه حل های بازیافت باتری لیتیومی
Plan the line around battery source, شیمی, discharge status, input format and required material streams.
- بسته, module, cell and production-scrap questions
- Pre-treatment and safety boundary
- Modular equipment and project scope
PHOTOVOLTAIC RECYCLING
مدیریت بازیافت پنل خورشیدی
جداسازی کبریت, size reduction and separation modules to panel construction, condition and project volume.
- Single-glass and double-glass project routes
- Frame, junction-box and laminate handling
- Disassembly and downstream process options
THERMAL TREATMENT
سیستم های پیرولیز پلاستیک زباله
Review plastic suitability, قبل از درمان, تبدیل حرارتی, condensation, gas handling and outputs as one project boundary.
- مواد اولیه, chlorine, moisture and contamination review
- Reactor, condensation and tail-gas interfaces
- Oil, گاز, residue and site-handling boundary
TIRE TREATMENT
سیستم های پیرولیز لاستیک زباله
Map tire preparation, reactor configuration and output handling to the operating plan and site.
- Tire size reduction and feeding requirements
- Thermal process, gas and condensation interfaces
- Oil, carbon and steel output handling
SLUDGE TREATMENT
سیستم های پیرولیز لجن
Define moisture, drying and conditioning requirements before integrating thermal treatment and downstream handling.
- منبع, moisture and contaminant boundary
- Drying, feeding and thermal-process interfaces
- Gas, condensate and solid-output handling
METAL PACKAGING
خط پوشش دهی قوطی آلومینیومی
Review incoming scrap condition, preparation, حذف پوشش, off-gas control and downstream metal-processing interfaces.
- UBC preparation and contamination boundary
- De-coating furnace and environmental controls
- Melting, casting and recovered-metal interface
LINE CONFIGURATIONS & CORE MODULES
Compare equipment roles inside the complete process boundary.
Capacity labels describe the intended configuration class. Final operating basis depends on the submitted material, مسیر فرآیند, utilities and acceptance boundary.
Battery line1000خط دفع باتری لیتیومی کیلوگرم در ساعتTarget configuration page →
Project solutionراه حل های پروژه بازیافت باتری EVProject route →
Commercial planningLithium Battery Recycling Machine Price FactorsCost boundary →
PV equipmentتجهیزات جداسازی پنل خورشیدیEquipment role →
Commercial planningSolar Panel Recycling Machine Cost FactorsCost boundary →
EXPLORE THE FULL KNOWLEDGE CLUSTER
Follow every active solution, فرآیند, configuration and planning page by material family.
This index connects the complete solution overview, process notes, line configurations and commercial-planning pages while preserving every established URL.
بازیافت باتری لیتیومی
Move from project scope to line class, EV feedstock questions, technology context and cost boundaries.
بازیافت پنل خورشیدی
Compare panel construction, mechanical and thermal routes, line classes, disassembly and cost planning.
- Solar panel recycling solution overview
- Single-glass PV project route
- Double-glass PV project route
- 500kg/h solar panel plant
- 1000kg/h solar panel plant
- Solar panel disassembly equipment
- PV recycling equipment planning guide
- PV mechanical recycling technology
- تکنولوژی پیرولیز PV
- Solar panel pyrolysis project solution
- Solar panel machine cost factors
پیرولیز پلاستیک
Connect feedstock evaluation, plastic-to-fuel process context and commercial-planning questions.
پیرولیز تایر
Review the system route, conversion context and the variables that shape a project budget.
Sludge and aluminum recovery
Open the active sludge-treatment and aluminum-preparation pathways.
COMPLETE SCOPE & APPROVAL BOUNDARY
What the solution can connect now—and what still needs project confirmation.
Useful planning inputs
Material source, ترکیب, وضعیت, فرمت ورودی, available volume, site status, operating plan and decision stage.
Confirmed later
Final configuration, capacity, power, طرح بندی, output specification, schedule, certification scope and commercial terms.
NEXT STEP
Send the project facts before selecting the final equipment list.
YUSHUNXIN reviews the submitted boundary before providing configuration or commercial guidance.