GREEN INDUSTRIAL SOLUTIONS · YUSHUNXIN SYSTEM HUB
Complete Green Industrial Solutions Organized by Material and System Boundary
Explore project pathways that connect material assessment, process engineering, integrated equipment, environmental systems, output handling and delivery planning. Published capacities and module descriptions remain planning references until the complete project boundary is reviewed.
HOW TO USE THE SOLUTION HUB
Start with the material, then define the complete operating system.
- 01
Choose the material stream
Battery, photovoltaic panel, plastic, tire, sludge or aluminum packaging feedstock.
- 02
Connect the system layers
Review pre-treatment, core processing, separation, environmental control, utilities and outputs.
- 03
Define the project boundary
Confirm operating basis, site interfaces, delivery scope, economics and the next decision stage.
COMPLETE SOLUTION FAMILIES
Choose by material stream, process route and project objective.
Each solution family connects suitable inputs, process sequence, integrated modules, environmental and site interfaces, output boundaries, planning tools and next actions.
BATTERY RECYCLING
Lithium Battery Recycling Solutions
Plan the line around battery source, chemistry, discharge status, input format and required material streams.
- Pack, module, cell and production-scrap questions
- Pre-treatment and safety boundary
- Modular equipment and project scope
PHOTOVOLTAIC RECYCLING
Solar Panel Recycling Management
Match disassembly, size reduction and separation modules to panel construction, condition and project volume.
- Single-glass and double-glass project routes
- Frame, junction-box and laminate handling
- Disassembly and downstream process options
THERMAL TREATMENT
Waste Plastic Pyrolysis Systems
Review plastic suitability, pre-treatment, thermal conversion, condensation, gas handling and outputs as one project boundary.
- Feedstock, chlorine, moisture and contamination review
- Reactor, condensation and tail-gas interfaces
- Oil, gas, residue and site-handling boundary
TIRE TREATMENT
Waste Tire Pyrolysis Systems
Map tire preparation, reactor configuration and output handling to the operating plan and site.
- Tire size reduction and feeding requirements
- Thermal process, gas and condensation interfaces
- Oil, carbon and steel output handling
SLUDGE TREATMENT
Sludge Pyrolysis Systems
Define moisture, drying and conditioning requirements before integrating thermal treatment and downstream handling.
- Source, moisture and contaminant boundary
- Drying, feeding and thermal-process interfaces
- Gas, condensate and solid-output handling
METAL PACKAGING
Aluminum Can De-coating Line
Review incoming scrap condition, preparation, coating removal, off-gas control and downstream metal-processing interfaces.
- UBC preparation and contamination boundary
- De-coating furnace and environmental controls
- Melting, casting and recovered-metal interface
LINE CONFIGURATIONS & CORE MODULES
Compare equipment roles inside the complete process boundary.
Capacity labels describe the intended configuration class. Final operating basis depends on the submitted material, process route, utilities and acceptance boundary.
Battery line1000kg/h Lithium Battery Disposal LineTarget configuration page →
Project solutionEV Battery Recycling Project SolutionsProject route →
Commercial planningLithium Battery Recycling Machine Price FactorsCost boundary →
PV equipmentSolar Panel Disassembly EquipmentEquipment role →
Commercial planningSolar Panel Recycling Machine Cost FactorsCost boundary →
EXPLORE THE FULL KNOWLEDGE CLUSTER
Follow every active solution, process, configuration and planning page by material family.
This index connects the complete solution overview, process notes, line configurations and commercial-planning pages while preserving every established URL.
Lithium battery recycling
Move from project scope to line class, EV feedstock questions, technology context and cost boundaries.
Solar panel recycling
Compare panel construction, mechanical and thermal routes, line classes, disassembly and cost planning.
- Solar panel recycling solution overview
- Single-glass PV project route
- Double-glass PV project route
- 500kg/h solar panel plant
- 1000kg/h solar panel plant
- Solar panel disassembly equipment
- PV recycling equipment planning guide
- PV mechanical recycling technology
- PV pyrolysis technology
- Solar panel pyrolysis project solution
- Solar panel machine cost factors
Plastic pyrolysis
Connect feedstock evaluation, plastic-to-fuel process context and commercial-planning questions.
Tire pyrolysis
Review the system route, conversion context and the variables that shape a project budget.
Sludge and aluminum recovery
Open the active sludge-treatment and aluminum-preparation pathways.
COMPLETE SCOPE & APPROVAL BOUNDARY
What the solution can connect now—and what still needs project confirmation.
Useful planning inputs
Material source, composition, condition, input format, available volume, site status, operating plan and decision stage.
Confirmed later
Final configuration, capacity, power, layout, output specification, schedule, certification scope and commercial terms.
NEXT STEP
Send the project facts before selecting the final equipment list.
YUSHUNXIN reviews the submitted boundary before providing configuration or commercial guidance.