GREEN INDUSTRIAL SOLUTIONS · YUSHUNXIN SYSTEM HUB

Complete Green Industrial Solutions Organized by Material and System Boundary

Explore project pathways that connect material assessment, پروسيسنگ انجنيئرنگ, مربوط سامان, ماحولياتي نظام, output handling and delivery planning. Published capacities and module descriptions remain planning references until the complete project boundary is reviewed.

HOW TO USE THE SOLUTION HUB

مواد سان شروع ڪريو, then define the complete operating system.

  1. 01

    Choose the material stream

    بيٽري, photovoltaic panel, plastic, tire, sludge or aluminum packaging feedstock.

  2. 02

    Connect the system layers

    Review pre-treatment, core processing, جدائي, ماحولياتي ڪنٽرول, utilities and outputs.

  3. 03

    Define the project boundary

    Confirm operating basis, سائيٽ انٽرفيس, پهچائڻ جي گنجائش, economics and the next decision stage.

COMPLETE SOLUTION FAMILIES

Choose by material stream, process route and project objective.

Each solution family connects suitable inputs, process sequence, integrated modules, ماحولياتي ۽ سائيٽ انٽرفيس, output boundaries, planning tools and next actions.

THERMAL TREATMENT

فضول پلاسٽڪ Pyrolysis سسٽم

Review plastic suitability, اڳواٽ علاج, حرارتي تبديلي, condensation, gas handling and outputs as one project boundary.

  • فيڊ اسٽاڪ, chlorine, moisture and contamination review
  • Reactor, condensation and tail-gas interfaces
  • Oil, گيس, residue and site-handling boundary

Open solution →

SLUDGE TREATMENT

Sludge Pyrolysis سسٽم

Define moisture, drying and conditioning requirements before integrating thermal treatment and downstream handling.

  • ذريعو, moisture and contaminant boundary
  • Drying, feeding and thermal-process interfaces
  • Gas, condensate and solid-output handling

Open solution →

METAL PACKAGING

ايلومينيم ڪين ڊي ڪوٽنگ لائين

Review incoming scrap condition, تياري, ڪوٽنگ هٽائڻ, off-gas control and downstream metal-processing interfaces.

  • UBC preparation and contamination boundary
  • De-coating furnace and environmental controls
  • Melting, casting and recovered-metal interface

Open solution →

EXPLORE THE FULL KNOWLEDGE CLUSTER

Follow every active solution, عمل, configuration and planning page by material family.

This index connects the complete solution overview, process notes, line configurations and commercial-planning pages while preserving every established URL.

ليتيم بيٽري ريسائڪلنگ

Move from project scope to line class, EV feedstock questions, technology context and cost boundaries.

سولر پينل ري سائيڪلنگ

Compare panel construction, mechanical and thermal routes, line classes, disassembly and cost planning.

پلاسٽڪ pyrolysis

Connect feedstock evaluation, plastic-to-fuel process context and commercial-planning questions.

ٽائر pyrolysis

Review the system route, conversion context and the variables that shape a project budget.

Sludge and aluminum recovery

Open the active sludge-treatment and aluminum-preparation pathways.

COMPLETE SCOPE & APPROVAL BOUNDARY

What the solution can connect now—and what still needs project confirmation.

Useful planning inputs

Material source, مرکب, حالت, ان پٽ فارميٽ, available volume, site status, operating plan and decision stage.

Confirmed later

Final configuration, گنجائش, power, ترتيب, output specification, schedule, certification scope and commercial terms.

NEXT STEP

Send the project facts before selecting the final equipment list.

YUSHUNXIN reviews the submitted boundary before providing configuration or commercial guidance.

پروجيڪٽ جو جائزو شروع ڪريو