Configure Solar Panel Disassembly Around Module Construction and the Next Process
Frame and glass removal should be evaluated as the front end of a connected PV recycling route. Module construction, damage condition, throughput and downstream material requirements determine the equipment sequence.

Tulee oke zuru oke tupu atụnyere ọnụ ahịa.
Nkọwa ebipụtara na-akwado nhazi oge mbụ. Ike ikpeazụ, nhazi, arụmọrụ na okwu azụmahịa chọrọ nkwenye ederede megide eziokwu ọrụ etinyere.
Ndabere ihe
Module dimensions, construction, damage and incoming presentation
Sistemụ ejikọrọ
Frame removal, glass separation, conveying and downstream handoff
Nkwenye ndị ahịa
Capacity basis, output condition, labor, utilities and layout
Ụzọ ngwọta zuru ezu
Nyochaa ibe usoro ejikọrọ tupu idozi oke akụrụngwa.
