Sistemụ ọkụ ọkụ akọwapụtara nke ọma

Ejila aha reactor ma ọ bụ ikike kwa ụbọchị dịka nkọwapụta ọrụ zuru oke.

Nri nri, nkwadebe, aga n'ihu na-arụ ọrụ, condensation, nchekwa gas, njikwa ngwaahịa, njikwa gburugburu ebe obibi, A ga-ahazirịrị akụrụngwa na oke nnyefe mpaghara ọnụ.

A

Nrụtụ aka dị nta akwadoro

YSX-F1 ka YSX-F5 pụtara 1, 2, 3, 4 na 5 t/day skid ma ọ bụ modular atụmatụ ntụaka maka taya, Nnwale plastik ma ọ bụ mmanu mmanu.

B

Nhazi ihe onwunwe

Mmanụ, gas, ihe siri ike na ihe na-emepụta ígwè na-achọ nri nri ndị nnọchiteanya, data kwụsiri ike yana oke nlele ekwenyero.

C

Oke azụmahịa

Ọnụ ahịa, ụgwọ ọrụ, uru ngwaahịa na nloghachi chọrọ nhota ụbọchị yana akaebe ahịa mpaghara.

Njikwa isi mmalite: Ndebanye aha ngwaahịa otu YOTO kwadoro. A na-ewepụta paramita ikpeazụ na nkwekọrịta ọrụ nka akọwapụtara nke ọma.

YUSHUNXIN PLASTIC PYROLYSIS

Waste Plastic Pyrolysis Plant Configured From Feedstock Chemistry

Plan pre-treatment, thermal processing, dewaxing, condensation, tail-gas handling and product storage as one project boundary. Plastic type, chlorine risk, moisture and feed consistency determine whether a proposed route is technically meaningful.

YUSHUNXIN plastic pyrolysis production line overall view
Complete line contextProduction-line context across feedstock preparation, thermal processing, condensation and output handling.

FEEDSTOCK FIRST

Plastic category alone is not enough for plant selection.

01

Polymer mix

PP, PE and PS may be suitable within a reviewed mix; PVC and other chlorine-bearing materials require special attention.

02

Physical condition

Film, rigid plastic, fluff, shredded material, mmiri mmiri, dirt and metal contamination.

03

Supply stability

Daily availability, composition variation, storage and pre-treatment consistency.

04

Product objective

Define the intended oil fraction, gas use, residue handling and local sales or use boundary.

PROCESS BOUNDARY

Control the material before, during and after thermal treatment.

  1. 01

    Sort and characterize

    Confirm polymer mix, mmiri mmiri, chlorine risk, additives and incompatible materials.

  2. 02

    Prepare the feed

    Iberibe, cleaning or drying is selected from the incoming condition and feeding method.

  3. 03

    Feed and thermally process

    Batch or continuous architecture is matched to supply stability, operating plan and site capability.

  4. 04

    Manage wax and condensation

    Wax-forming feedstocks may require a project-configured dewaxing stage before or within condensation.

  5. 05

    Handle gas, oil and residue

    Define non-condensable gas use, oil storage, residue cooling and tail-gas treatment.

PROCESS MEDIA & EQUIPMENT CONTEXT

Connect each equipment area to the operating basis.

These images show the furnace, overall layout, workshop context and output-handling area together with their process roles.

APPROVED CONFIGURATION BASIS

Use the reference envelope as a discussion starting point.

DecisionApproved referenceRequired confirmation
Primary feedstockPublished planning basis includes PP, PE and PSRepresentative composition, contamination and chlorine screening
Thermal zone300–450°C main cracking range referenceFinal operating window is determined by process design and feedstock testing
Operating architectureBatch or continuous optionsSupply stability, tupu ọgwụgwọ, working schedule and site capability
Wax managementDewaxing is recommended for wax-forming plastic streamsPolymer mix, condensation design, cleaning method and maintenance plan

No universal oil yield, fixed price, emissions result or project profitability is stated. These depend on verified feedstock, local energy and product economics, operating conditions and regulatory requirements.

PROJECT GATES

Four reviews should be complete before procurement.

Feedstock gate

Composition, mmiri mmiri, chlorine, ntu, metal and supply consistency.

Process gate

Tupu ọgwụgwọ, feeding, thermal architecture, dewaxing, condensation and residue handling.

Site gate

Utilities, nchekwa, fire safety, emissions controls, labor and maintenance access.

Commercial gate

Scope inclusions, local obligations, product outlet, acceptance method and delivery boundary.

FAQ oru ngo

Avoid comparing plants before the feedstock is comparable.

Can mixed plastic be processed?

Enwere ike, but the expected polymer and contamination range must be defined. Chlorine-bearing and incompatible materials can change process, corrosion and gas-treatment requirements.

How much oil will the plant produce?

No universal yield is published. Yield depends on representative feedstock composition, mmiri mmiri, contaminants, ọnọdụ ọrụ, condensation boundary and measurement method.

Should I choose batch or continuous operation?

The choice depends on feedstock preparation and stability, plant scale, labor model, maintenance plan, site capability and investment stage.

Does the equipment automatically satisfy local emissions rules?

Mba. Destination-country permits, emission limits, monitoring and site obligations must be confirmed as part of the project boundary.

START THE PLASTIC REVIEW

Share composition, contamination and operating plan.

The project desk will review missing facts before discussing configuration or price.

Nyefee nkọwapụta oru ngo

YUSHUNXIN THERMAL CONVERSION

Waste-plastic pyrolysis starts with polymer identification and sorting

PE-, PP- and selected PS-rich streams can follow different thermal and condensation behavior. PVC, PET, brominated plastics, medical plastics and e-waste plastics require separate assessment.

Reference three-dimensional layout of a continuous thermal conversion line
01 / CONNECTED PROCESS

Follow the material, vapor, liquid, gas and solid paths

The reactor is one part of the line. Commercial operability depends on how each stream is prepared, transferred, controlled and discharged.

  1. 01Material characterization
  2. 02Feed preparation and sealed transfer
  3. 03Controlled thermal conversion
  4. 04Vapor separation and staged condensation
  5. 05Non-condensable gas safety and reuse
  6. 06Solid cooling, discharge and product handling
02 / MATERIAL-SPECIFIC DESIGN

Configuration questions that change the proposal

The following points should be resolved before selecting a capacity or preparing a commercial quotation.

Polymer composition

Confirm PE, PP, PS, PVC and PET proportions instead of describing the feed simply as mixed plastic.

Halogen control

PVC and brominated additives can change corrosion, gas-cleaning and recovered-liquid requirements.

Wax management

Plastic-derived vapors and liquids may require temperature-controlled lines, insulation and condensation staging.

Product route

Define whether recovered liquid is intended for permitted fuel use, refinery feed evaluation or another locally accepted outlet.

03 / OPERATING MODEL

Make utilities and product outlets visible before investment

A useful feasibility review connects the mass balance, ike itule, operating schedule and local product route.

Operating schedule

Define planned hours per day, shutdown windows, cleaning strategy, labor model and feedstock storage capacity.

Ntinye ike

Evaluate non-condensable gas reuse, startup fuel, electrical loads, cooling demand and optional downstream energy use as one balance.

Quality control

Set sampling points for incoming material, condensate fractions, recovered solids, wastewater and exhaust gas.

Oke azụmahịa

Budgetary results remain conditional until the feedstock, saịtị, product route and local compliance requirements are confirmed.

Nhazi ntụaka

Tụgharịa asụsụ eziokwu ngo ka ọ bụrụ ndepụta akụrụngwa.

Matrix ntụaka a na-egosi mgbagha mkpebi. Ogo ikpeazụ, ụdị na ihu dị n'atụmatụ ọrụ akwadoro.

ngọngọ sistemuOghere a na-ahụkarịNdabere nhazi
Polymer preparationNhazi, shreshing, drying and removal of incompatible fractionsPE, PP, PS, PVC, PET and additive profile
Feed and conversionDensity control, sealed transfer, reactor and heating systemBulk density, melt behavior and operating duty
Wax and liquid handlingTemperature-controlled vapor lines, staged condensation and storageWax tendency and target recovered-liquid route
Halogen and gas controlMaterial exclusion, corrosion review and gas-treatment provisionsPVC, brominated additives and local limits
Residue and utilitiesSolid discharge, jụrụ oyi, water and electrical interfacesResidue classification and site conditions
Uzo Mkpebi nke Ogbo-GATED

Bulite ọrụ ahụ naanị mgbe ihe akaebe achọrọ dị.

Ọnụ ụzọ ámá ọ bụla na-atụgharị ozi ndị ahịa ka ọ bụrụ mmepụta teknụzụ akọwapụtara ma ọ bụ azụmahịa maka mkpebi ọzọ.

01

Polymer screen

Quantify target polymers, PVC, PET, additives, mmiri na mmetọ.

MpụtaAccepted and excluded feed specification
02

Ụzọ okpomọkụ

Validate feeding, wax behavior, condensation and corrosion controls.

MpụtaMaterial-specific process route
03

Product and permit

Confirm recovered-product status, outlets and local environmental boundary.

MpụtaCommercial and compliance evidence pack
04

Configuration review

Freeze preparation, reactor, mgbake, utilities and acceptance interfaces.

MpụtaProject configuration basis
FAQ oru ngo

Ajụjụ iji dozie tupu nhazi.

Azịza ya na-akọwa oke injinia; ha anaghị edochi ule ihe nnọchi anya ma ọ bụ nyocha nnabata mpaghara.

What determines the continuous pyrolysis equipment list?

Feedstock form, mejupụtara, mmiri mmiri, mmetọ, planned operating schedule, recovered-product route, site utilities and permit requirements determine the configuration.

Can tires, plastics and oily sludge use exactly the same line?

Mba. They may share thermal-conversion principles, but their preparation, feeding, corrosion, condensation, solid handling and environmental controls differ materially.

Can recovered oil performance be guaranteed from a general material description?

Mba. Representative analysis and an agreed sampling method are required before recovered-liquid quantity, quality or downstream use can be evaluated.

What should be included in acceptance testing?

Define feedstock, run duration, mass balance, arụ ọrụ kwụsie ike, sampled outputs, akụrụngwa, safety interlocks and the applicable emissions or residue tests.

Nlele Nlebanya Nhazi

Kọwaa ihe tupu ịhọrọ akụrụngwa.

Kekọrịta nkọwa ihe nnọchite anya, olu dị, ọnọdụ saịtị na ihe ebumpụta ụwa. YUSHUNXIN ga-eji eziokwu ndị ahụ dozie oke usoro dị mkpa yana mkparịta ụka nhazi.

Malite Nyochaa oru ngo