500kg/h リチウム電池リサイクルプラント
Evaluate a medium-scale target configuration around battery chemistry, physical format, pre-treatment status, operating plan and required output fractions.
The 500kg/h label preserves the existing page identity and planning intent. It is not a guaranteed result for every feedstock.
Project view
材料 / outputWhen a 500kg/h target configuration is worth evaluating
This page preserves the original 500kg/h planning intent while replacing unsupported performance claims with the information required to evaluate a medium-scale line responsibly.
01Documented material supply
Estimate monthly or annual supply, seasonal variation and the proportion of packs, modules, cells or production scrap. A target label is meaningful only when the feed basis is clear.
02Defined pre-treatment
State whether incoming material is discharged, dismantled or otherwise prepared. The upstream boundary changes labor, equipment scope and safe-handling requirements.
03運行スケジュール
Single-shift, multi-shift and maintenance assumptions affect material buffers, collection capacity and project layout. Record the intended operating basis early.
04Output destination
Specify whether the project delivers powder-bearing material, metal fractions or material for further downstream treatment. The destination shapes acceptance criteria.
Proposed process framework
The page describes a target class, while the actual sequence follows the approved feedstock. Expand each stage to see the engineering questions that should be resolved before approval.
01Feedstock preparation+

Confirm chemistry, 形式 and pre-treatment status.
- Input to confirm: format, 化学, condition and variation at this step.
- Scope decision: included equipment, optional controls and customer-supplied items.
- Acceptance point: define the handover, sampling or operating check in the approved specification.
02サイズダウン+

Select equipment and controls for the approved input.
- Input to confirm: 形式, 化学, condition and variation at this step.
- Scope decision: included equipment, optional controls and customer-supplied items.
- Acceptance point: define the handover, sampling or operating check in the approved specification.
03Screening and separation+

Configure suitable powder and material separation stages.
- Input to confirm: 形式, 化学, condition and variation at this step.
- Scope decision: included equipment, optional controls and customer-supplied items.
- Acceptance point: define the handover, sampling or operating check in the approved specification.
04Collection and controls+

Select conveying, collection and control modules for the proposed route.
- Input to confirm: 形式, 化学, condition and variation at this step.
- Scope decision: included equipment, optional controls and customer-supplied items.
- Acceptance point: define the handover, sampling or operating check in the approved specification.
A medium-scale configuration is a balanced system
The original page highlighted core equipment. The deeper view below connects each module to its project decision instead of presenting isolated machines.
01Integrated line layout
The proposal should align receiving, 準備, 餌やり, 分離, collection and maintenance access. Individual machine ratings do not by themselves define system throughput.
02Feed and size reduction
Feeding and shredding are selected for the reviewed format and condition. Access, containment and inspection points should be included in the scope.
03Powder collection
Collection points and containers are designed around the selected process and downstream handover. Sampling and housekeeping responsibilities should be documented.
04Airflow or density separation
Separation is configured after particle condition and target fractions are understood. It should not be specified from capacity alone.
05磁気分離
A magnetic stage may be included to remove ferrous-bearing material at the appropriate point in the process flow.
06Final classification
Vibrating or other screening may classify material before collection. Screen selection belongs in the engineering specification.
Four checks before comparing a 500kg/h proposal
Use the same project boundary when comparing suppliers.
Same feedstock
Compare proposals against the same chemistry, 形式, condition and pre-treatment assumptions.
Same operating basis
Align planned hours, shifts, availability assumptions and maintenance allowance.
Same equipment boundary
Separate included modules, optional auxiliaries, customer-supplied items and services.
Same acceptance method
Define sampling, output categories and how performance will be confirmed.
500kg/h project checklist
This table separates the current planning basis from items that require material tests, site information or written human approval.
| Project item | Current basis | Status |
|---|---|---|
| Configuration class | 500kg/h target | Controlled |
| Guaranteed throughput | Not stated on website | Locked |
| Battery chemistry | From material profile | To confirm |
| Input format | パック / モジュール / cell / scrap | To confirm |
| Process route | Based on engineering review | Project-dependent |
| Output fractions | Based on project goals | To confirm |
| 公共事業 | Based on site information | To confirm |
| レイアウト | Based on site information | To confirm |
Outputs are evaluated with the feedstock, not from the page label
The line may separate powder-bearing, copper-bearing, aluminum-bearing, ferrous and residual fractions. The exact result depends on the approved material and configuration.
01Powder-bearing fraction
Document the sampling point, container, moisture and downstream acceptance conditions.
02Copper-bearing fraction
Clarify whether the target is a separated foil-rich fraction or material for further treatment.
03Aluminum-bearing fraction
Set the required handover boundary and contamination limits in the project specification.
Acceptance discipline: Yield, 純度, capacity and recovery values are not assumed from a website description. They must be tied to the approved feedstock, test basis and written project specification.
Get the right response for your current decision stage
Tell YUSHUNXIN whether you are researching, testing feasibility, comparing suppliers or preparing procurement. The project brief routes the next conversation around the information you have now.
Why work with YUSHUNXIN
YUSHUNXIN prepares the proposed module list and layout basis around the supplied material profile and site information, clearly separating confirmed items from open technical questions.
Confirmed facts
Approved material data and project requirements are shown as the basis of the proposal.
Project-dependent items
Configuration choices remain conditional until the feedstock and site have been reviewed.
Human approval gates
Commercial terms, final performance and compliance statements require authorized review.
Version control
The proposal should identify the approved configuration version, assumptions and open questions.
Questions project teams ask before a proposal
Does 500kg/h describe guaranteed operating throughput?+
いいえ. It identifies the target configuration and existing page intent. Actual throughput requires written technical confirmation.
Can complete EV packs be fed directly?+
Do not assume direct feeding. Pack condition, state of charge, dismantling and discharge require review.
Which separation modules are included?+
The proposal may combine screening, airflow, density-based and magnetic separation after material review.
How is the project price determined?+
Price depends on the reviewed process, 装備範囲, controls, サイト, 公共事業, services and delivery boundary.
What in形式ion is needed for a proposal?+
Provide chemistry, format, 状態, photos or analysis, material supply, target input, スケジュール, country, site and outputs.
Related project planning pages
500 kg/h scope comparison
Compare standard equipment, LR complete-line and earlier integrated-layout boundaries before assigning power or footprint.
入荷素材
Chemistry, cell format, module/pack dismantling status, state of charge, moisture and contamination.
期待される出力
Separated electrode-bearing and metal-bearing fractions under an agreed test and sampling method.
プロジェクトインターフェース
Safety preparation, コンディショニング, 分離, gas/dust control, packing and local utility scope.
Use only the row matching the selected process boundary.
| カタログ参照 | 容量 | 力 | 物理的エンベロープ | 含まれる境界 |
|---|---|---|---|---|
| YSX public familyPublic equipment family | 500–1,000 kg/h | 102–238 kW | 20–35 m line; 7.5–19.5 t | Standard equipment-family envelope; no per-model allocation |
| YSX-LR500LR complete line | 500 kg/h | 320 kW | 40 × 15 × 7.5 メートル | Conditioning, separation and gas-treatment line |
| Project reference - 500Earlier integrated layout | 500 kg/h | 300 kW | 60 × 7 × 7 メートル | Earlier layout without a published model label |
設定ルール: カタログ容量は計画の参考値です. 安定したスループット, 設置/動作電力, フットプリント, 回復, 純度, 排出量と公共需要には承認された機器リストが必要です, representative material and written acceptance conditions.
設定やお見積りの前に必要な情報
- 代表的な資料写真, specifications and available sample.
- 必要なキャパシティにシフトごとの時間数を加えたもの, shifts per day and operating days.
- 目標出力, sampling method and downstream receiver requirements.
- 拠点の国, 利用可能な電力, 燃料, 水, compressed air and building limits.
- 地域環境, 火, storage and occupational-safety requirements.
- 要求された配送境界: 装置, レイアウト, インストール, commissioning and training.