01 Documented material supply Estimate monthly or annual supply, seasonal variation and the proportion of packs, modules, cells or production scrap. A target label is meaningful only when the feed basis is clear.
02 Defined pre-treatment State whether incoming material is discharged, dismantled or otherwise prepared. The upstream boundary changes labor, equipment scope and safe-handling requirements.
03 Operating schedule Single-shift, multi-shift and maintenance assumptions affect material buffers, collection capacity and project layout. Record the intended operating basis early.
04 Output destination Specify whether the project delivers powder-bearing material, metal fractions or material for further downstream treatment. The destination shapes acceptance criteria.
01 System balance Integrated line layout The proposal should align receiving, preparation, feeding, separation, collection and maintenance access. Individual machine ratings do not by themselves define system throughput.
02 Input-dependent Feed and size reduction Feeding and shredding are selected for the reviewed format and condition. Access, containment and inspection points should be included in the scope.
03 Output boundary Powder collection Collection points and containers are designed around the selected process and downstream handover. Sampling and housekeeping responsibilities should be documented.
04 Optional module Airflow or density separation Separation is configured after particle condition and target fractions are understood. It should not be specified from capacity alone.
05 Ferrous control Magnetic separation A magnetic stage may be included to remove ferrous-bearing material at the appropriate point in the process flow.
06 Fraction consistency Final classification Vibrating or other screening may classify material before collection. Screen selection belongs in the engineering specification.
01 Same feedstock Compare proposals against the same chemistry, format, condition and pre-treatment assumptions.
02 Same operating basis Align planned hours, shifts, availability assumptions and maintenance allowance.
03 Same equipment boundary Separate included modules, optional auxiliaries, customer-supplied items and services.
01 Powder-bearing fraction Document the sampling point, container, moisture and downstream acceptance conditions.
02 Copper-bearing fraction Clarify whether the target is a separated foil-rich fraction or material for further treatment.
03 Aluminum-bearing fraction Set the required handover boundary and contamination limits in the project specification.
എ Confirmed facts Approved material data and project requirements are shown as the basis of the proposal.
B Project-dependent items Configuration choices remain conditional until the feedstock and സൈറ്റ് have been reviewed.
C Human approval gates Commercial terms, final performance and compliance statements require authorized review.
D Version control The proposal should identify the approved configuration version, assumptions and open questions.
01Incoming materialChemistry, cell format, module/pack dismantling status, state of charge, moisture and contamination.
02Expected outputsSeparated electrode-bearing and metal-bearing fractions under an agreed test and sampling method.
03Project interfacesSafety preparation, conditioning, വേർപിരിയൽ, gas/dust control, packing and local utility scope.