YUSHUNXIN · Target configuration

500kg/j Loji Kitar Semula Bateri Litium

Evaluate a medium-scale target configuration around battery chemistry, physical format, pre-treatment status, operating plan and required output fractions.

The 500kg/h label preserves the existing page identity and planning intent. It is not a guaranteed result for every feedstock.

Configuration class500kg/h target
Best used forDefined medium-scale feedstock
Performance statusConfirmed after review
500kgh lithium battery recycling production lineProject view
lithium battery black mass final productbahan / output
01 · Feedstock and project fit

When a 500kg/h target configuration is worth evaluating

This page preserves the original 500kg/h planning intent while replacing unsupported performance claims with the information required to evaluate a medium-scale line responsibly.

500 kg per hour lithium battery recycling production line01

Documented material supply

Estimate monthly or annual supply, seasonal variation and the proportion of packs, modules, cells or production scrap. A target label is meaningful only when the feed basis is clear.

EV Battery02

Defined pre-treatment

State whether incoming material is discharged, dismantled or otherwise prepared. The upstream boundary changes labor, equipment scope and safe-handling requirements.

lithium battery recycling equipment factory03

Operating schedule

Single-shift, multi-shift and maintenance assumptions affect material buffers, collection capacity and project layout. Record the intended operating basis early.

lithium battery black mass final product04

Output destination

Specify whether the project delivers powder-bearing material, metal fractions or material for further downstream treatment. The destination shapes acceptance criteria.

02 · Process framework

Proposed process framework

The page describes a target class, while the actual sequence follows the approved feedstock. Expand each stage to see the engineering questions that should be resolved before approval.

01Feedstock preparation+
500kgh lithium battery recycling production line

Confirm kimia, format and pre-treatment status.

  • Input to confirm: format, kimia, condition and variation at this step.
  • Scope decision: included equipment, optional controls and customer-supplied items.
  • Acceptance point: define the handover, sampling or operating check in the approved specification.
02Size reduction+
electronic waste shredding machine

Select equipment and controls for the approved input.

  • Input to confirm: format, kimia, condition and variation at this step.
  • Scope decision: included equipment, optional controls and customer-supplied items.
  • Acceptance point: define the handover, sampling or operating check in the approved specification.
03Screening and separation+
rotary drum depowdering machine

Configure suitable powder and material separation stages.

  • Input to confirm: format, kimia, condition and variation at this step.
  • Scope decision: included equipment, optional controls and customer-supplied items.
  • Acceptance point: define the handover, sampling or operating check in the approved specification.
04Collection and controls+
industrial gravity separation system

Select conveying, collection and control modules for the proposed route.

  • Input to confirm: format, chemistry, condition and variation at this step.
  • Scope decision: included equipment, optional controls and customer-supplied items.
  • Acceptance point: define the handover, sampling or operating check in the approved specification.
03 · Equipment and system boundary

A medium-scale configuration is a balanced system

The original page highlighted core equipment. The deeper view below connects each module to its project decision instead of presenting isolated machines.

500kgh lithium battery recycling production line01
System balance

Integrated line layout

The proposal should align receiving, preparation, feeding, separation, collection and maintenance access. Individual machine ratings do not by themselves define system throughput.

electronic waste shredding machine02
Input-dependent

Feed and size reduction

Feeding and shredding are selected for the reviewed format and condition. Access, containment and inspection points should be included in the scope.

rotary drum depowdering machine03
Output boundary

Powder collection

Collection points and containers are designed around the selected process and downstream handover. Sampling and housekeeping responsibilities should be documented.

industrial gravity separation system04
Optional module

Airflow or density separation

Separation is configured after particle condition and target fractions are understood. It should not be specified from capacity alone.

high efficiency magnetic separator machine05
Ferrous control

Magnetic separation

A magnetic stage may be included to remove ferrous-bearing material at the appropriate point in the process flow.

industrial vibrating screen separation equipment06
Fraction consistency

Final classification

Vibrating or other screening may classify material before collection. Screen selection belongs in the engineering specification.

04 · Decision detail

Four checks before comparing a 500kg/h proposal

Use the same project boundary when comparing suppliers.

01

Same feedstock

Compare proposals against the same chemistry, format, condition and pre-treatment assumptions.

02

Same operating basis

Align planned hours, shifts, availability assumptions and maintenance allowance.

03

Same equipment boundary

Separate included modules, optional auxiliaries, customer-supplied items and services.

04

Same acceptance method

Define sampling, output categories and how performance will be confirmed.

05 · Technical clarification table

500kg/h project checklist

This table separates the current planning basis from items that require material tests, site information or written human approval.

Project item Current basis Status
Configuration class 500kg/h target Controlled
Guaranteed throughput Not stated on website Locked
Battery chemistry From material profile To confirm
Input format Pek / module / cell / scrap To confirm
Process route Based on engineering review Project-dependent
Output fractions Based on project goals To confirm
Utilities Based on site information To confirm
Susun atur Based on site information To confirm
06 · Output and acceptance

Outputs are evaluated with the feedstock, not from the page label

The line may separate powder-bearing, copper-bearing, aluminum-bearing, ferrous and residual fractions. The exact result depends on the approved material and configuration.

lithium battery black mass final product01

Powder-bearing fraction

Document the sampling point, container, moisture and downstream acceptance conditions.

Copper foil from battery recycling02

Copper-bearing fraction

Clarify whether the target is a separated foil-rich fraction or material for further treatment.

Aluminum foil from battery recycling03

Aluminum-bearing fraction

Set the required handover boundary and contamination limits in the project specification.

Acceptance discipline: Yield, purity, capacity and recovery values are not assumed from a website description. They must be tied to the approved feedstock, test basis and written project specification.

07 · Decision-stage support

Get the right response for your current decision stage

Tell YUSHUNXIN whether you are researching, testing feasibility, comparing suppliers or preparing procurement. The project brief routes the next conversation around the information you have now.

ResearchClarify material and process options.
FeasibilityReview tests, site and project boundary.
Supplier comparisonAlign scope and acceptance method.
PerolehanResolve open items for an approved proposal.
08 · Engineering communication

Why work with YUSHUNXIN

YUSHUNXIN prepares the proposed module list and layout basis around the supplied material profile and tapak information, clearly separating confirmed items from open technical questions.

A

Confirmed facts

Approved material data and project requirements are shown as the basis of the proposal.

B

Project-dependent items

Configuration choices remain conditional until the feedstock and site have been reviewed.

C

Human approval gates

Commercial terms, final performance and compliance statements require authorized review.

D

Version control

The proposal should identify the approved configuration version, assumptions and open questions.

09 · Frequently asked questions

Questions project teams ask before a proposal

Does 500kg/h describe guaranteed operating throughput?+

No. It identifies the target configuration and existing page intent. Actual throughput requires written technical confirmation.

Can complete EV packs be fed directly?+

Do not assume direct feeding. Pack condition, state of charge, dismantling and discharge require review.

Which separation modules are included?+

The proposal may combine screening, airflow, density-based and magnetic separation after material review.

How is the project price determined?+

Price depends on the reviewed process, equipment scope, controls, site, utiliti, services and delivery boundary.

What information is needed for a proposal?+

Provide chemistry, format, syarat, photos or analysis, material supply, target input, schedule, country, site and outputs.

CATALOGUE-ALIGNED ENGINEERING BASIS

500 kg/h scope comparison

Compare standard equipment, LR complete-line and earlier integrated-layout boundaries before assigning power or footprint.

01

Incoming material

Chemistry, cell format, module/pack dismantling status, state of charge, moisture and contamination.

02

Expected outputs

Separated electrode-bearing and metal-bearing fractions under an agreed test and sampling method.

03

Project interfaces

Safety preparation, conditioning, perpisahan, gas/dust control, packing and local utility scope.

MODEL AND SCOPE REGISTER

Use only the row matching the selected process boundary.

Catalogue referenceKapasitiPowerPhysical envelopeIncluded boundary
YSX public familyPublic equipment family500–1,000 kg/j102–238 kW20–35 m line; 7.5–19.5 tStandard equipment-family envelope; no per-model allocation
YSX-LR500LR complete line500 kg/h320 kW40 × 15 × 7.5 mConditioning, separation and gas-treatment line
Project reference - 500Earlier integrated layout500 kg/j300 kW60 × 7 × 7 mEarlier layout without a published model label

Configuration rule: catalogue capacity is a planning reference. Stable throughput, installed/operating power, footprint, recovery, purity, emissions and utility demand require the approved equipment list, representative material and written acceptance conditions.

Information required before configuration and quotation

  1. Representative material photos, specifications and available sample.
  2. Required capacity plus hours per shift, shifts per day and operating days.
  3. Output sasaran, sampling method and downstream receiver requirements.
  4. Site country, available power, fuel, air, compressed air and building limits.
  5. Local environmental, fire, storage and occupational-safety requirements.
  6. Requested delivery boundary: peralatan, susun atur, installation, commissioning and training.