GREEN INDUSTRIAL SOLUTIONS · YUSHUNXIN SYSTEM HUB
Complete Green Industrial Solutions Organized by Material and System Boundary
Explore project pathways that connect material assessment, rekayasa proses, peralatan terpadu, environmental systems, output handling and delivery planning. Published capacities and module descriptions remain planning references until the complete project boundary is reviewed.
HOW TO USE THE SOLUTION HUB
Start with the material, then define the complete operating system.
- 01
Choose the material stream
Battery, photovoltaic panel, plastik, tire, sludge or aluminum packaging feedstock.
- 02
Connect the system layers
Review pre-treatment, core processing, pisah, kontrol lingkungan, utilities and outputs.
- 03
Define the project boundary
Confirm operating basis, site interfaces, delivery scope, economics and the next decision stage.
COMPLETE SOLUTION FAMILIES
Choose by material stream, process route and project objective.
Each solution family connects suitable inputs, process sequence, integrated modules, environmental and site interfaces, output boundaries, planning tools and next actions.
BATTERY RECYCLING
Solusi Daur Ulang Baterei Lithium
Plan the line around battery source, kimia, discharge status, input format and required material streams.
- Pack, module, cell and production-scrap questions
- Pre-treatment and safety boundary
- Modular equipment and project scope
PHOTOVOLTAIC RECYCLING
Manajemen Daur Ulang Panel Surya
Disassembly cocog, size reduction and separation modules to panel construction, condition and project volume.
- Single-glass and double-glass project routes
- Frame, junction-box and laminate handling
- Disassembly and downstream process options
THERMAL TREATMENT
Sistem Pirolisis Sampah Plastik
Review plastic suitability, pra-perawatan, konversi termal, condensation, gas handling and outputs as one project boundary.
- Bahan baku, chlorine, moisture and contamination review
- Reactor, condensation and tail-gas interfaces
- Oil, gas, residue and site-handling boundary
TIRE TREATMENT
Sistem Pirolisis Ban Limbah
Map tire preparation, reactor configuration and output handling to the operating plan and site.
- Tire size reduction and feeding requirements
- Thermal process, gas and condensation interfaces
- Oil, carbon and steel output handling
SLUDGE TREATMENT
Sistem Pirolisis Lumpur
Define moisture, drying and conditioning requirements before integrating thermal treatment and downstream handling.
- Sumber, moisture and contaminant boundary
- Drying, feeding and thermal-process interfaces
- Gas, condensate and solid-output handling
METAL PACKAGING
Aluminum Can De-coating Line
Review incoming scrap condition, preparation, mbusak lapisan, off-gas control and downstream metal-processing interfaces.
- UBC preparation and contamination boundary
- De-coating furnace and environmental controls
- Melting, casting and recovered-metal interface
LINE CONFIGURATIONS & CORE MODULES
Compare equipment roles inside the complete process boundary.
Capacity labels describe the intended configuration class. Final operating basis depends on the submitted material, rute proses, utilities and acceptance boundary.
Battery line1000kg / h Lithium Baterei pembuangan LineTarget configuration page →
Project solutionSolusi Proyek Daur Ulang Baterei EVProject route →
Commercial planningLithium Battery Recycling Machine Price FactorsCost boundary →
PV equipmentPeralatan Disassembly Panel SuryaEquipment role →
Commercial planningSolar Panel Recycling Machine Cost FactorsCost boundary →
EXPLORE THE FULL KNOWLEDGE CLUSTER
Follow every active solution, process, configuration and planning page by material family.
This index connects the complete solution overview, process notes, line configurations and commercial-planning pages while preserving every established URL.
Lithium battery recycling
Move from project scope to line class, EV feedstock questions, technology context and cost boundaries.
daur ulang panel surya
Compare panel construction, mechanical and thermal routes, line classes, disassembly and cost planning.
- Solar panel recycling solution overview
- Single-glass PV project route
- Double-glass PV project route
- 500kg/h solar panel plant
- 1000kg/h solar panel plant
- Solar panel disassembly equipment
- PV recycling equipment planning guide
- PV mechanical recycling technology
- Teknologi PV pirolisis
- Solar panel pyrolysis project solution
- Solar panel machine cost factors
Pirolisis plastik
Connect feedstock evaluation, plastic-to-fuel process context and commercial-planning questions.
Pirolisis ban
Review the system route, conversion context and the variables that shape a project budget.
Sludge and aluminum recovery
Open the active sludge-treatment and aluminum-preparation pathways.
COMPLETE SCOPE & APPROVAL BOUNDARY
What the solution can connect now—and what still needs project confirmation.
Useful planning inputs
Material source, komposisi, kahanan, format input, volume kasedhiya, site status, operating plan and decision stage.
Confirmed later
Final configuration, capacity, power, tata letak, output specification, schedule, certification scope and commercial terms.
NEXT STEP
Send the project facts before selecting the final equipment list.
YUSHUNXIN reviews the submitted boundary before providing configuration or commercial guidance.