Solusi industri ijo lan pemulihan sumber daya terpadu dening YUSHUNXIN

YUSHUNXIN solusi industri ijo lengkap

CONTACT YUSHUNXIN · GREEN INDUSTRIAL PROJECT DESK

Contact the YUSHUNXIN Green Industrial Project Team

Discuss a material stream, equipment requirement or project plan directly, or complete the structured brief so the team can review the operating basis, site interfaces and current decision stage.

PREPARE BEFORE SUBMITTING

Five facts make the first response more useful.

01

kulawarga proyek

Battery, PV, pyrolysis, aluminum processing or another material stream.

02

Material condition

Sumber, komposisi, format input, ukuran, lembab, contamination and pre-treatment.

03

Operating and output basis

Available volume, expected schedule, target streams and the capacity basis you are evaluating.

04

Site and system interfaces

Location, utilitas, kontrol lingkungan, readiness, retrofit requirements and delivery interfaces.

05

Decision stage

Research, feasibility, configuration comparison, budget, sourcing or procurement.

    SURAT PROYEK

    Mulai karo kontak sampeyan. Gawe dalan proyek sing bener.

    Papat langkah singkat nyimpen fakta proyek nalika sampeyan lunga.

    01

    Contact and project route

    Who should receive the follow-up, and which material stream is involved?






    02

    Material and operating basis

    Describe the feedstock before discussing the equipment list.



    03

    Decision stage and next milestone

    This helps the business team provide an appropriate next step.




    Sadurunge ngirim

    Deleng fakta proyek.

    Kapasitas pungkasan, konfigurasi, tata letak, kualitas output, jadwal pangiriman lan istilah komersial dikonfirmasi mung sawise review materi lan situs.


    Menyang Ndhuwur