GREEN INDUSTRIAL SOLUTIONS · YUSHUNXIN SYSTEM HUB

Complete Green Industrial Solutions Organized by Material and System Boundary

Explore project pathways that connect material assessment, rekayasa proses, peralatan terintegrasi, sistem lingkungan, output handling and delivery planning. Published capacities and module descriptions remain planning references until the complete project boundary is reviewed.

HOW TO USE THE SOLUTION HUB

Start with the material, then define the complete operating system.

  1. 01

    Choose the material stream

    Baterai, photovoltaic panel, plastic, tire, sludge or aluminum packaging feedstock.

  2. 02

    Connect the system layers

    Review pre-treatment, core processing, pemisahan, pengendalian lingkungan, utilities and outputs.

  3. 03

    Define the project boundary

    Confirm operating basis, antarmuka situs, ruang lingkup pengiriman, economics and the next decision stage.

COMPLETE SOLUTION FAMILIES

Choose by material stream, process route and project objective.

Each solution family connects suitable inputs, process sequence, integrated modules, environmental and site interfaces, output boundaries, planning tools and next actions.

THERMAL TREATMENT

Sistem Pirolisis Limbah Plastik

Review plastic suitability, pra-perawatan, konversi termal, condensation, gas handling and outputs as one project boundary.

  • Bahan baku, chlorine, moisture and contamination review
  • Reactor, condensation and tail-gas interfaces
  • Oil, gas, residue and site-handling boundary

Open solution →

TIRE TREATMENT

Sistem Pirolisis Ban Limbah

Map tire preparation, reactor configuration and output handling to the operating plan and site.

  • Tire size reduction and feeding requirements
  • Thermal process, gas and condensation interfaces
  • Oil, carbon and steel output handling

Open solution →

SLUDGE TREATMENT

Sistem Pirolisis Lumpur

Define moisture, drying and conditioning requirements before integrating thermal treatment and downstream handling.

  • Sumber, moisture and contaminant boundary
  • Drying, feeding and thermal-process interfaces
  • Gas, condensate and solid-output handling

Open solution →

METAL PACKAGING

Garis De-coating Kaleng Aluminium

Review incoming scrap condition, persiapan, penghapusan lapisan, off-gas control and downstream metal-processing interfaces.

  • UBC preparation and contamination boundary
  • De-coating furnace and environmental controls
  • Melting, casting and recovered-metal interface

Open solution →

EXPLORE THE FULL KNOWLEDGE CLUSTER

Follow every active solution, proses, configuration and planning page by material family.

This index connects the complete solution overview, process notes, line configurations and commercial-planning pages while preserving every established URL.

Daur ulang baterai litium

Move from project scope to line class, EV feedstock questions, technology context and cost boundaries.

Daur ulang panel surya

Compare panel construction, mechanical and thermal routes, line classes, disassembly and cost planning.

Pirolisis plastik

Connect feedstock evaluation, plastic-to-fuel process context and commercial-planning questions.

Pirolisis ban

Review the system route, conversion context and the variables that shape a project budget.

Sludge and aluminum recovery

Open the active sludge-treatment and aluminum-preparation pathways.

COMPLETE SCOPE & APPROVAL BOUNDARY

What the solution can connect now—and what still needs project confirmation.

Useful planning inputs

Material source, komposisi, kondisi, format masukan, volume yang tersedia, site status, operating plan and decision stage.

Confirmed later

Final configuration, capacity, power, tata letak, output specification, schedule, certification scope and commercial terms.

NEXT STEP

Send the project facts before selecting the final equipment list.

YUSHUNXIN reviews the submitted boundary before providing configuration or commercial guidance.

Mulai Tinjauan Proyek