GREEN INDUSTRIAL CONFIGURATION & FEASIBILITY TOOL

Configure the Process Before You Model the Return

Turn material facts, operating targets and delivery scope into an editable YUSHUNXIN reference configuration, then test the customer’s own revenue, cost and investment assumptions.

INTERACTIVE PROJECT MODEL

Connect customer demand, equipment scope and operating logic.

The reference configuration explains process roles and interfaces. It does not select a final model, promise performance or generate an automatic quotation.

Complete the project route, output assumptions and investment scope to calculate an indicative return.
Configuration completeness Start with the project facts
0%
  • Define the incoming material
  • Review the process responsibility
  • Add the customer operating basis
01

Customer demand and project route

Haec determinat processus generis non apparatum album.

Configuratione solum Reference. Facultatem finalem, exact equipment, quantities, utilitates, layout and commercial scope require material and site review.

REFERENCE PROCESS CONFIGURATION

Lithium battery recycling reference route

Choose the material form and process goal to explain why each module is included.

Configuration ID YSX-LIB-PENDING Discovery

EDITABLE EQUIPMENT CONFIGURATION

See the process role before discussing a model.

The list follows the selected route. Review responsibility and open each module to see why it is included and what still needs confirmation.

0Reference modules
0Core route
0Conditional
0Engineering review

MATERIAL-TO-OUTPUT ROUTE

Follow the material through the proposed process.

This is a route map, not a recovery-rate statement. Output names and shares remain the customer’s editable assumptions.

Customer input Incoming material facts Condition to confirm
Generate the reference configuration to view the process sequence.
Output 01Define an output assumptionNo share entered
Output 02Define an output assumptionNo share entered
Output 03Define an output assumptionNo share entered
Core route Conditional route Engineering review

CONFIGURATION VISUALIZER

Compare a 2D process layout with a 3D concept view.

These diagrams communicate sequence, interfaces and scope only. They are not engineering drawings and contain no confirmed dimensions.

Conceptual two-dimensional process layout A non-dimensional plan showing the customer feed zone, six configurable process zones, utility interfaces and three output areas. CONCEPTUAL PROCESS AREA — NOT TO SCALE CUSTOMER FEED ZONE Input facts PROCESS 01Praeparatio PROCESS 02Primary treatment PROCESS 03Separatio PROCESS 04Refining PROCESS 05Collection PROCESS 06Environmental control OUTPUT 01To define OUTPUT 02To define OUTPUT 03To define UTILITY INTERFACES
2D process layoutShows sequence and interface zones. Final arrangement depends on confirmed equipment, site access, utilities and local requirements.
Operating rhythm500 kg/h · 8 h/day · 26 days/month

The customer’s planning basis drives monthly input; module sizing remains subject to review.

Scope boundaryIntegrated line productio

Use each module selector to identify YUSHUNXIN, customer or discussion scope.

Cost categories activated

WHAT SALES AND ENGINEERING STILL NEED

Unresolved project facts

    02

    Operating basis

    Define the planned input rate, schedule and utilization used by this estimate.

    kg/h*
    50 kg/h*20,000 kg/h planning input
    h
    1 h24 h
    days
    1 day31 days
    %
    Customer planning assumption100%
    04A

    Recepi output reditus et principia

    Lorem suppositis separatis intrant usque ad tres outputs. Nulla recuperatio rate vel numerus clausus prefilled.

    Output streamShare of initusPrecium / kg

    Lorem-ingressus principia. Output partes sunt YUSHUNXIN recuperatio petit. Eorum summa esse non debet 100% definiti initus basis.

    04B

    Menstrua pretia

    Configuratione pretium genera agnoscit; Lorem copia pecuniarum copia.

    04C

    Tractatus et ratio basis

    Use one currency and state exactly what the investment amount includes.

    No exchange conversion or automatic price is used. The investment remains a customer or reviewed project input.

    DILUCIDENS RATIONE

    Configurationis prima, oeconomica secundo.

    Instrumentum mos facta nectit ad processum modulorum et genera operandi sumptus. Non implent reprobi perficientur vel pretium notitia.

    01

    Reference configuratione

    Forma materialis + conditio + target output + partus scope

    02

    Menstrua cogitavit initus

    Input kg / h horas / dies dies / mensis utendo

    03

    Output vectigal

    S (menstrua initus elit, ingressus output participes× valorem / kg)

    04

    Curatio-feudum vectigal

    Vestibulum initus × Lorem-ingressus porta vel curatio fee/kg

    05

    Monthly contribution

    Output et feudum reditus omnes ingressi menses pretia laboris

    06

    Payback et annua ROI

    Investment ÷ positive monthly contribution; annua conlationem investment

    configurationis & ROI FAQ

    Scitote quid instrumentum habeat et non confirmatum.

    Utere output ut exstructa project brevis, tunc convalidandum suppositis cum YUSHUNXIN engineering, res et bigas rebus oeconomicis.

    Modulus generatus est album apparatu finalem delectu?

    No. It explains a reference process route from the selected customer facts. Exact models, quantities, redundancy, utilities and layout require engineering review.

    Does this tool provide a YUSHUNXIN quotation?

    No. It does not insert equipment prices. The entered investment and all monetary values remain customer or reviewed project assumptions.

    Why are there several output streams?

    Green industrial projects may create more than one recovered or treated stream. Separate entries make the customer’s value basis visible without turning it into a YUSHUNXIN recovery claim.

    Can the customer change the process scope?

    Yes. Each module can be marked as YUSHUNXIN review scope, customer or third-party scope, or an item that still needs discussion. The choice is included in the enquiry summary.

    Why can payback remain unavailable?

    Payback is not displayed when output assumptions, investment or investment scope are incomplete, total output shares exceed 100%, or the entered monthly contribution is not positive.