GREEN INDUSTRIAL CONFIGURATION & FEASIBILITY TOOL
Configure the Process Before You Model the Return
Turn material facts, operating targets and delivery scope into an editable YUSHUNXIN reference configuration, then test the customer’s own revenue, cost and investment assumptions.
INTERACTIVE PROJECT MODEL
Connect customer demand, equipment scope and operating logic.
The reference configuration explains process roles and interfaces. It does not select a final model, promise performance or generate an automatic quotation.
- Define the incoming material
- Review the process responsibility
- Add the customer operating basis
TRANSPARENT METHOD
Configuration first, economics second.
The tool connects customer facts to process modules and operating cost categories. It does not fill unapproved performance or price data.
Reference configuration
Material form + isimo + target output + ububanzi bokulethwa
Monthly planned input
Input kg/h × hours/day × days/month × utilization
Output revenue
Σ (monthly input × customer-entered output share × value/kg)
Treatment-fee revenue
Monthly input × customer-entered gate or treatment fee/kg
Monthly contribution
Output and fee revenue − all entered monthly operating costs
Payback and annual ROI
Investment ÷ positive monthly contribution; annual contribution ÷ investment
CONNECT THE CONFIGURATION TO ENGINEERING
Review the relevant YUSHUNXIN solution boundary.
CONFIGURATION & ROI FAQ
Know what the tool has—and has not—confirmed.
Use the output as a structured project brief, then validate the assumptions with YUSHUNXIN engineering, operations and your finance team.
Is the generated module list a final equipment selection?
Cha. It explains a reference process route from the selected customer facts. Exact models, quantities, redundancy, utilities and layout require engineering review.
Does this tool provide a YUSHUNXIN quotation?
Cha. It does not insert equipment prices. The entered investment and all monetary values remain customer or reviewed project assumptions.
Why are there several output streams?
Green industrial projects may create more than one recovered or treated stream. Separate entries make the customer’s value basis visible without turning it into a YUSHUNXIN recovery claim.
Can the customer change the process scope?
Yebo. Each module can be marked as YUSHUNXIN review scope, customer or third-party scope, or an item that still needs discussion. The choice is included in the enquiry summary.
Why can payback remain unavailable?
Payback is not displayed when output assumptions, investment or investment scope are incomplete, total output shares exceed 100%, or the entered monthly contribution is not positive.