GREEN INDUSTRIAL SOLUTIONS · ENGINEERED BY YUSHUNXIN
Build the Right Recycling System Around Your Material
Choose a material stream to see the connected process—from feedstock preparation to recovered outputs.
- Material-to-output architecture
- Integrated process and environmental systems
- Defined site and delivery boundaries
ONE REVIEWABLE PROJECT BASIS
Move from material stream to process, integrated system and the next decision.
Every material family follows the same review logic: input conditions, process route, equipment roles, environmental and utility interfaces, output basis, economics and delivery planning. Published values remain planning references until the relevant project facts are reviewed.
COMPLETE SOLUTION BOUNDARY
See the whole industrial system—not an isolated machine.
Each layer is connected to the next. The final scope depends on the material, chaw, output objective and responsibilities agreed for the project.
- 01
Material assessment
Source, composition, format, condition, moisture, contamination and supply basis.
- 02
Pre-treatment & safety
Feeding, discharge, dismantling, drying, size control and material protection.
- 03
Core process
Mechanical liberation, separation, thermal treatment or metal preparation.
- 04
Environmental systems
Dust, air, gas, water, residue and workplace-control interfaces.
- 05
Outputs & automation
Material streams, monitoring, handling, storage and downstream requirements.
- 06
Delivery planning
Layout, Cov cuab yeej siv, documentation, logistics, installation and commissioning responsibility boundary.
GREEN INDUSTRIAL SOLUTION CLUSTERS
Choose the material family, then review the complete system boundary.
Battery Recycling
Lithium Battery Recycling Systems
Tsim txheej txheem raws li qhov chaw roj teeb, chemistry, input format, discharge status thiab target output.
Review qhov kev daws teeb meem no →
PV Recycling
Solar Panel Recycling Systems
Match disassembly, Size reduction and separation modules rau panel construction thiab project throughput.
Review qhov kev daws teeb meem no →
Plastic Resource Recovery
Waste Plastic Pyrolysis Systems
Connect feedstock qualification, pre-treatment, thermal conversion, kev ua dej thiab kev tswj roj hauv ib qho chaw ua haujlwm.
Review qhov kev daws teeb meem no →
Kev rov qab tau cov khoom siv log tsheb
Cov txheej txheem pyrolysis ntawm cov log pov tseg
Kev sib xyaw kev npaj log tsheb, qauv reactor, kev tswj roj thiab roj av, kev tawm carbon thiab kev sib txuas ntawm qhov chaw.
Review qhov kev daws teeb meem no →
Kev kho sludge
Cov txheej txheem pyrolysis sludge
Kev txhais cov kev xav tau ntawm noo thiab qhuav, kev kho kub, kev tswj pa thiab cov ciam teb ntawm cov khoom ruaj khov ua ntej teeb tsa.
Review qhov kev daws teeb meem no →
Kev rov qab tau cov khoom hlau
Cov txheej txheem tshem txheej hauv lub thawv aluminium
Kev npaj txuas UBC, tshem txheej txheej, tswj pa tawm, melting interfaces thiab cov ciam teb hlau uas yuav tsum tau tso tawm.
Review qhov kev daws teeb meem no →DECISION WORKFLOW
Move from feasibility to a reviewable integrated solution.
- 01
Describe the feedstock
Share source, composition, format, condition and available volume.
- 02
Review the process path
Identify pre-treatment needs, core modules and output boundaries.
- 03
Integrate the complete system
Connect equipment, Kev tswj ib puag ncig, Cov cuab yeej siv, automation and output handling.
- 04
Define delivery and economics
Clarify site interfaces, responsibilities, investment assumptions and the next approval milestone.
YUSHUNXIN PROJECT ASSURANCE
Build every proposal from a visible, reviewable project basis.
A professional industrial proposal should show what is known, what is customer-provided, what remains project-dependent and what requires written approval. YUSHUNXIN keeps those states visible from early planning through the approved equipment scope.
- Material and operating basis documented before equipment selection
- Txheej txheem, cuab yeej, environmental and site interfaces connected
- Published references separated from project-specific confirmation
- Acceptance points and responsibilities stated before commitment
FACTORY & PROCESS EVIDENCE
Review the equipment context behind an integrated project discussion.
Factory images and process media help customers connect equipment roles, interfaces and execution questions. They provide review context only; project-specific configuration, performance and delivery scope remain subject to the approved project basis.
PV EQUIPMENT PROCESS VIDEO
See one photovoltaic-equipment process stage in operation.
Qhov chaw xov xwm uas tau txheeb xyuas no yog qhia tshwj xeeb ua yeeb yaj kiab txheej txheem PV khoom. Nws tsis yog yeeb yaj kiab qhia txog tuam txhab, ib daim ntawv lees txais tag nrho lossis ib qho kev thov ua haujlwm ntawm project.
- Txheej txheem txheej txheem
- Cov ntaub ntawv ntawm theem cuab yeej
- Kev tshuaj xyuas project tseem yuav tsum tau
PROJECT CONTEXT & POV THAWJ
Cov ntaub ntawv luam tawm, cov lus nug engineering thiab kev npaj.
NPAJ RAU KEV TSHUAJ XYUAS PAB TAU?
Qhia peb tias cov khoom yog dab tsi, nws tuaj txog li cas thiab project nyob qhov twg.
YUSHUNXIN yuav tshuaj xyuas cov ntaub ntawv xa tuaj ua ntej tham txog kev teeb tsa lossis kev qhia lag luam.



