GREEN INDUSTRIAL SOLUTIONS · ENGINEERED BY YUSHUNXIN
Build the Right Recycling System Around Your Material
Choose a material stream to see the connected process—from feedstock preparation to recovered outputs.
- Material-to-output architecture
- Integrated process and environmental systems
- Defined site and delivery boundaries
ONE REVIEWABLE PROJECT BASIS
Move from material stream to process, integrated system and the next decision.
Every material family follows the same review logic: input conditions, prosessvei, equipment roles, environmental and utility interfaces, output basis, economics and delivery planning. Published values remain planning references until the relevant project facts are reviewed.
COMPLETE SOLUTION BOUNDARY
See the whole industrial system—not an isolated machine.
Each layer is connected to the next. The final scope depends on the material, nettstedet, output objective and responsibilities agreed for the project.
- 01
Material assessment
Kilde, komposisjon, format, betingelse, fuktighet, contamination and supply basis.
- 02
Pre-treatment & sikkerhet
Feeding, discharge, dismantling, drying, size control and material protection.
- 03
Core process
Mechanical liberation, atskillelse, thermal treatment or metal preparation.
- 04
Environmental systems
Støv, air, gas, vann, residue and workplace-control interfaces.
- 05
Outputs & automasjon
Material streams, overvåking, handling, storage and downstream requirements.
- 06
Delivery planning
Layout, verktøy, documentation, logistikk, installation and commissioning responsibility boundary.
GREEN INDUSTRIAL SOLUTION CLUSTERS
Choose the material family, then review the complete system boundary.
Battery Recycling
Lithium Battery Recycling Systems
Build the process around battery source, kjemi, inndataformat, discharge status and target output.
Review this solution →
PV Recycling
Solar Panel Recycling Systems
Match disassembly, size reduction and separation modules to panel construction and project throughput.
Review this solution →
Plastic Resource Recovery
Waste Plastic Pyrolysis Systems
Connect feedstock qualification, pre-treatment, thermal conversion, condensation and gas handling within one operating boundary.
Review this solution →
Tire Resource Recovery
Waste Tire Pyrolysis Systems
Integrate tire preparation, reactor architecture, oil and gas handling, carbon output and site interfaces.
Review this solution →
Sludge Treatment
Sludge Pyrolysis Systems
Define moisture and drying requirements, thermal treatment, gas handling and solid-output boundaries before configuration.
Review this solution →
Metal Resource Recovery
Aluminum Can De-coating Systems
Connect UBC preparation, coating removal, off-gas control, melting interfaces and the required metal-output boundary.
Review this solution →DECISION WORKFLOW
Move from feasibility to a reviewable integrated solution.
- 01
Describe the feedstock
Share source, komposisjon, format, condition and available volume.
- 02
Review the process path
Identify pre-treatment needs, core modules and output boundaries.
- 03
Integrate the complete system
Koble til utstyr, miljøkontroller, verktøy, automation and output handling.
- 04
Define delivery and economics
Clarify site interfaces, responsibilities, investment assumptions and the next approval milestone.
YUSHUNXIN PROJECT ASSURANCE
Build every proposal from a visible, reviewable project basis.
A professional industrial proposal should show what is known, what is customer-provided, what remains project-dependent and what requires written approval. YUSHUNXIN keeps those states visible from early planning through the approved equipment scope.
- Material and operating basis documented before equipment selection
- Behandle, utstyr, environmental and site interfaces connected
- Published references separated from project-specific confirmation
- Acceptance points and responsibilities stated before commitment
FACTORY & PROCESS EVIDENCE
Review the equipment context behind an integrated project discussion.
Factory images and process media help customers connect equipment roles, interfaces and execution questions. They provide review context only; project-specific configuration, performance and delivery scope remain subject to the approved project basis.
PV EQUIPMENT PROCESS VIDEO
See one photovoltaic-equipment process stage in operation.
This verified media source is presented specifically as a PV equipment process video. It is not a corporate-introduction film, a complete-line acceptance record or a project-performance claim.
- Process context
- Equipment-stage reference
- Project review still required
PROJECT CONTEXT & EVIDENCE
Published references, engineering questions and planning context.
READY FOR A USEFUL REVIEW?
Tell us what the material is, how it arrives and where the project stands.
YUSHUNXIN will review the submitted facts before discussing configuration or commercial guidance.



