Select mechanical or thermal processing from the module construction, تلوث, required outputs, operating schedule, المرافق, compliance boundary and downstream acceptance. Return and payback require customer-supplied commercial assumptions.

Why Mechanical Lines Usually Recover Investment Faster?

  • Choose the process route after feedstock review and define the commercial model separately from the technical configuration.

What Profitable Materials Can Be Sold After 500kg/h Solar Panel Recycling?

A 500kg/h إدارة إعادة تدوير الألواح الشمسية can recover several commercially valuable materials from waste solar panels.

مادة Why It Has Value
Aluminum Frames High resale value as clean scrap metal; easy to separate and sell
Tempered Glass Reusable as secondary raw material for glass wool or flat glass production
Copper Ribbon & Wire Strong and stable market demand; consistent revenue stream
Silicon Powder / Cell Residue Further refining potential for metallurgical silicon, industrial materials, and silicon carbide applications.
Mixed Metals Depending on panel composition (فضي, tin, lead); valuable for metal refiners

Get a Factory Quote for Your 500kg/h Solar Panel Recycling Project

We supply customized 500kg/h Solar Panel Recycling Plants with equipment design, factory testing, layout planning, إرشادات التثبيت, and after-sales support. Whether you need a mechanical recycling line or a pyrolysis recovery system, our team can provide a tailored solution based on your budget and project goals. Contact us today for factory price, equipment list, and custom proposal.

YSX team and factory
CATALOGUE-ALIGNED ENGINEERING BASIS

Tunnel thermal or project-specific front end

أ 500 kg/h planning class for modules that require a connected thermal-release and separation boundary.

01

Incoming material

Single-/double-glass share, laminate and encapsulant construction, coating/contamination and hourly feed plan.

02

Expected outputs

Classified glass-, copper-, السيليكون- and polymer-bearing fractions after approved treatment.

03

Project interfaces

Secondary combustion, quench/scrubbing/filtration as selected, cooling, utilities and emissions monitoring plan.

MODEL AND SCOPE REGISTER

Use only the row matching the selected process boundary.

Catalogue referenceسعةقوةPhysical envelopeIncluded boundary
YSX-TK500Tunnel thermal500 كجم/ساعة116.65 kW65 × 13 × 7.5 مContinuous tunnel thermal line

Configuration rule: catalogue capacity is a planning reference. Stable throughput, installed/operating power, footprint, recovery, purity, emissions and utility demand require the approved equipment list, representative material and written acceptance conditions.

Information required before configuration and quotation

  1. Representative material photos, specifications and available sample.
  2. Required capacity plus hours per shift, shifts per day and operating days.
  3. المخرجات المستهدفة, sampling method and downstream receiver requirements.
  4. Site country, available power, fuel, ماء, compressed air and building limits.
  5. Local environmental, fire, storage and occupational-safety requirements.
  6. Requested delivery boundary: معدات, تَخطِيط, installation, commissioning and training.