Select mechanical or thermal processing from the module construction, gurbacewa, required outputs, operating schedule, kayan aiki, compliance boundary and downstream acceptance. Return and payback require customer-supplied commercial assumptions.

Why Mechanical Lines Usually Recover Investment Faster?

  • Choose the process route after feedstock review and define the commercial model separately from the technical configuration.

What Profitable Materials Can Be Sold After 500kg/h Solar Panel Recycling?

A 500kg/h sarrafa sake amfani da hasken rana can recover several commercially valuable materials from waste solar panels.

Kayan abu Why It Has Value
Aluminum Frames High resale value as clean scrap metal; easy to separate and sell
Tempered Glass Reusable as secondary raw material for glass wool or flat glass production
Copper Ribbon & Wire Strong and stable market demand; consistent revenue stream
Silicon Powder / Cell Residue Further refining potential for metallurgical silicon, industrial materials, and silicon carbide applications.
Mixed Metals Depending on panel composition (azurfa, tin, jagora); valuable for metal refiners

Get a Factory Quote for Your 500kg/h Solar Panel Recycling Project

We supply customized 500kg/h Solar Panel Recycling Plants with equipment design, factory testing, layout planning, jagorar shigarwa, and after-sales support. Whether you need a mechanical recycling line or a pyrolysis recovery system, our team can provide a tailored solution based on your budget and project goals. Contact us today for factory price, equipment list, and custom proposal.

YSX team and factory
GASKIYAR INJININ KASANCEWAR KATLOGUE

Tunnel thermal or project-specific front end

A 500 kg/h planning class for modules that require a connected thermal-release and separation boundary.

01

Abu mai shigowa

Single-/double-glass share, laminate and encapsulant construction, coating/contamination and hourly feed plan.

02

Abubuwan da ake tsammani

Classified glass-, copper-, silicon- and polymer-bearing fractions after approved treatment.

03

Mu'amalar aikin

Secondary combustion, quench/scrubbing/filtration as selected, sanyaya, utilities and emissions monitoring plan.

MISALI DA RIGISTAR GINDI

Yi amfani da jeri kawai wanda ya dace da iyakar tsari da aka zaɓa.

Maganar kasidaIyawaƘarfiAmbulan jikiƘaddamar da iyaka
YSX-TK500Ramin zafi500 kg/h116.65 kW65 × 13 × 7.5 mCi gaba da layin thermal na rami

Tsarin tsari: Ƙarfin kasida shine bayanin tsare-tsare. Tsayayyen kayan aiki, shigar/ikon aiki, sawun sawun, farfadowa, tsarki, hayaki da buƙatun kayan aiki suna buƙatar ingantaccen jerin kayan aiki, kayan wakilci da rubutaccen sharuɗɗan karɓa.

Bayanin da ake buƙata kafin daidaitawa da zance

  1. Hotunan kayan wakilci, ƙayyadaddun bayanai da samfurin samuwa.
  2. Ƙarfin da ake buƙata tare da sa'o'i a kowane motsi, canje-canje a kowace rana da kwanakin aiki.
  3. Abubuwan da aka yi niyya, Hanyar samfur da buƙatun mai karɓa na ƙasa.
  4. Ƙasar site, samuwa iko, man fetur, ruwa, matsewar iska da iyakokin gini.
  5. muhallin gida, wuta, ajiya da buƙatun aminci na sana'a.
  6. Iyakar isar da aka nema: kayan aiki, shimfidawa, shigarwa, kwamishina da horo.