Select mechanical or thermal processing from the module construction, contamination, required outputs, amserlen gweithredu, cyfleustodau, compliance boundary and downstream acceptance. Return and payback require customer-supplied commercial assumptions.

Why Mechanical Lines Usually Recover Investment Faster?

  • Choose the process route after feedstock review and define the commercial model separately from the technical configuration.

What Profitable Materials Can Be Sold After 500kg/h Solar Panel Recycling?

A 500kg/h rheoli ailgylchu paneli solar can recover several commercially valuable materials from waste solar panels.

Deunydd Why It Has Value
Aluminum Frames High resale value as clean scrap metal; easy to separate and sell
Tempered Glass Reusable as secondary raw material for glass wool or flat glass production
Copper Ribbon & Wire Strong and stable market demand; consistent revenue stream
Silicon Powder / Cell Residue Further refining potential for metallurgical silicon, industrial materials, and silicon carbide applications.
Mixed Metals Depending on panel composition (arian, tin, arwain); valuable for metal refiners

Get a Factory Quote for Your 500kg/h Solar Panel Recycling Project

We supply customized 500kg/h Solar Panel Recycling Plants with equipment design, factory testing, layout planning, installation guidance, and after-sales support. Whether you need a mechanical recycling line or a pyrolysis recovery system, our team can provide a tailored solution based on your budget and project goals. Contact us today for factory price, equipment list, and custom proposal.

YSX team and factory
SAIL PEIRIANNEG WEDI'I ALINIO CATALOGUE

Tunnel thermal or project-specific front end

A 500 kg/h planning class for modules that require a connected thermal-release and separation boundary.

01

Deunydd sy'n dod i mewn

Single-/double-glass share, laminate and encapsulant construction, coating/contamination and hourly feed plan.

02

Allbynnau disgwyliedig

Classified glass-, copper-, silicon- and polymer-bearing fractions after approved treatment.

03

Rhyngwynebau prosiect

Secondary combustion, quench/scrubbing/filtration as selected, cooling, utilities and emissions monitoring plan.

MODEL A CHWMPAS GOFRESTR

Defnyddiwch y rhes sy'n cyfateb i ffin y broses a ddewiswyd yn unig.

Cyfeirnod catalogGalluGrymAmlen gorfforolFfin wedi'i chynnwys
YSX-TK500Twnnel thermol500 kg/awr116.65 kW65 × 13 × 7.5 mLlinell thermol twnnel parhaus

Rheol cyfluniad: mae capasiti catalog yn gyfeirnod cynllunio. Trwybwn sefydlog, pŵer gosod / gweithredu, ôl troed, adferiad, purdeb, mae angen y rhestr offer cymeradwy ar allyriadau a galw am gyfleustodau, deunydd cynrychioliadol ac amodau derbyn ysgrifenedig.

Gwybodaeth sydd ei hangen cyn ffurfweddu a dyfynbris

  1. Lluniau deunydd cynrychioliadol, manylebau a sampl sydd ar gael.
  2. Capasiti gofynnol ynghyd ag oriau fesul sifft, shifftiau y dydd a diwrnodau gweithredu.
  3. Allbynnau targed, dull samplu a gofynion derbynnydd i lawr yr afon.
  4. Gwlad y safle, pŵer sydd ar gael, tanwydd, dwr, aer cywasgedig a therfynau adeiladu.
  5. Amgylchedd lleol, tân, gofynion storio a diogelwch galwedigaethol.
  6. Ffin dosbarthu y gofynnwyd amdani: offer, gosodiad, gosod, comisiynu a hyfforddi.