Select mechanical or thermal processing from the module construction, kontaminasyon, required outputs, iskedyul sa operasyon, mga utilities, compliance boundary and downstream acceptance. Return and payback require customer-supplied commercial assumptions.

Why Mechanical Lines Usually Recover Investment Faster?

  • Choose the process route after feedstock review and define the commercial model separately from the technical configuration.

What Profitable Materials Can Be Sold After 500kg/h Solar Panel Recycling?

A 500kg/h pagdumala sa pag-recycle sa solar panel can recover several commercially valuable materials from waste solar panels.

Materyal Why It Has Value
Aluminum Frames High resale value as clean scrap metal; easy to separate and sell
Tempered Glass Reusable as secondary raw material for glass wool or flat glass production
Copper Ribbon & Wire Strong and stable market demand; consistent revenue stream
Silicon Powder / Cell Residue Further refining potential for metallurgical silicon, industrial materials, and silicon carbide applications.
Mixed Metals Depending on panel composition (pilak, tin, tingga); valuable for metal refiners

Get a Factory Quote for Your 500kg/h Solar Panel Recycling Project

We supply customized 500kg/h Solar Panel Recycling Plants with equipment design, factory testing, layout planning, installation guidance, and after-sales support. Whether you need a mechanical recycling line or a pyrolysis recovery system, our team can provide a tailored solution based on your budget and project goals. Contact us today for factory price, equipment list, and custom proposal.

YSX team and factory
CATALOGUE-ALIGNED ENGINEERING BASE

Tunnel thermal or project-specific front end

A 500 kg/h planning class for modules that require a connected thermal-release and separation boundary.

01

umaabot nga materyal

Single-/double-glass share, laminate and encapsulant construction, coating/contamination and hourly feed plan.

02

Gipaabot nga mga output

Classified glass-, copper-, silikon- and polymer-bearing fractions after approved treatment.

03

Mga interface sa proyekto

Secondary combustion, quench/scrubbing/filtration as selected, cooling, utilities and emissions monitoring plan.

MODELO UG SCOPE REGISTER

Gamita lamang ang laray nga motakdo sa pinili nga utlanan sa proseso.

Reperensya sa katalogoKapasidadGahumPisikal nga sobreApil nga utlanan
YSX-TK500Tunnel nga thermal500 kg/h116.65 kW65 × 13 × 7.5 mPadayon nga tunnel thermal line

Lagda sa pag-configure: Ang kapasidad sa katalogo usa ka pakisayran sa pagplano. Stable nga throughput, instalar/operating gahum, tunob, pagkaayo, kaputli, emissions ug panginahanglan sa utility nagkinahanglan sa giaprobahan listahan sa mga ekipo, representante nga materyal ug sinulat nga mga kondisyon sa pagdawat.

Impormasyon nga gikinahanglan sa wala pa ang pag-configure ug pagkutlo

  1. Representante nga materyal nga mga litrato, mga detalye ug magamit nga sample.
  2. Gikinahanglan nga kapasidad dugang mga oras matag pagbalhin, shift kada adlaw ug operating days.
  3. Target nga mga output, pamaagi sa sampling ug mga kinahanglanon sa tigdawat sa ubos.
  4. Site nga nasud, magamit nga gahum, sugnod, tubig, compressed hangin ug mga limitasyon sa building.
  5. Lokal nga kinaiyahan, kalayo, pagtipig ug mga kinahanglanon sa kaluwasan sa trabaho.
  6. Gihangyo nga utlanan sa pagpadala: kahimanan, layout, pag-instalar, komisyon ug pagbansay.