Solusi industri ramah lingkungan dan pemulihan sumber daya terintegrasi oleh YUSHUNXIN

YUSHUNXIN melengkapi solusi industri ramah lingkungan

CONTACT YUSHUNXIN · GREEN INDUSTRIAL PROJECT DESK

Contact the YUSHUNXIN Green Industrial Project Team

Discuss a material stream, equipment requirement or project plan directly, or complete the structured brief so the team can review the operating basis, site interfaces and current decision stage.

PREPARE BEFORE SUBMITTING

Five facts make the first response more useful.

01

Keluarga proyek

Baterai, PV, pirolisis, aluminum processing or another material stream.

02

Kondisi materi

Sumber, komposisi, format masukan, ukuran, kelembaban, contamination and pre-treatment.

03

Operating and output basis

Volume yang tersedia, expected schedule, target streams and the capacity basis you are evaluating.

04

Site and system interfaces

Location, utilitas, pengendalian lingkungan, readiness, retrofit requirements and delivery interfaces.

05

Decision stage

Research, kemungkinan, configuration comparison, anggaran, sourcing or procurement.

    SURAT PROYEK

    Mulailah dengan kontak Anda. Bangun jalur proyek yang tepat.

    Empat langkah singkat menyimpan fakta proyek Anda seiring berjalannya waktu.

    01

    Kontak dan rute proyek

    Siapa yang harus menerima tindak lanjut, dan aliran material mana yang terlibat?






    02

    Bahan dan dasar operasi

    Jelaskan bahan bakunya sebelum membahas daftar peralatan.



    03

    Tahap pengambilan keputusan dan pencapaian berikutnya

    Ini membantu tim bisnis memberikan langkah selanjutnya yang tepat.




    SEBELUM MENGIRIM

    Tinjau fakta proyek.

    Kapasitas akhir, konfigurasi, tata letak, kualitas keluaran, jadwal pengiriman dan persyaratan komersial dikonfirmasi hanya setelah peninjauan materi dan lokasi.


    Pergi ke Atas