YUSHUNXIN پاران مربوط سبز صنعتي ۽ وسيلن جي بحالي واري حل

YUSHUNXIN مڪمل سبز صنعتي حل

CONTACT YUSHUNXIN · GREEN INDUSTRIAL PROJECT DESK

Contact the YUSHUNXIN Green Industrial Project Team

Discuss a material stream, equipment requirement or project plan directly, or complete the structured brief so the team can review the operating basis, site interfaces and current decision stage.

PREPARE BEFORE SUBMITTING

Five facts make the first response more useful.

01

پروجيڪٽ خاندان

بيٽري, پي وي, pyrolysis, aluminum processing or another material stream.

02

مادي حالت

ذريعو, مرکب, ان پٽ فارميٽ, ماپ, نمي, contamination and pre-treatment.

03

Operating and output basis

موجود حجم, expected schedule, target streams and the capacity basis you are evaluating.

04

Site and system interfaces

Location, افاديت, ماحولياتي ڪنٽرول, readiness, retrofit requirements and delivery interfaces.

05

Decision stage

Research, فزيبلٽي, configuration comparison, budget, sourcing or procurement.

    پروجيڪٽ ليٽر

    توهان جي رابطي سان شروع ڪريو. صحيح منصوبي جو رستو ٺاھيو.

    چار مختصر قدم توهان جي پروجيڪٽ جي حقيقتن کي بچايو جيئن توهان وڃو.

    01

    رابطو ۽ منصوبي جو رستو

    جنهن کي فالو اپ حاصل ڪرڻ گهرجي, ۽ ڪهڙو مواد جو وهڪرو شامل آهي?






    02

    مواد ۽ آپريٽنگ بنياد

    سامان جي فهرست تي بحث ڪرڻ کان اڳ فيڊ اسٽاڪ بيان ڪريو.



    03

    فيصلو اسٽيج ۽ ايندڙ سنگ ميل

    هي ڪاروباري ٽيم کي هڪ مناسب ايندڙ قدم مهيا ڪرڻ ۾ مدد ڪري ٿي.




    جمع ڪرڻ کان اڳ

    پروجيڪٽ جي حقيقتن جو جائزو وٺو.

    آخري گنجائش, تشڪيل, ترتيب, پيداوار جي معيار, ترسيل شيڊول ۽ تجارتي شرطن جي تصديق ڪئي وئي صرف مواد ۽ سائيٽ جي نظرثاني کان پوء.


    مٿي ڏانھن وڃو