A higher-throughput PV line can add automated handling, staged size reduction, pemisahan, environmental controls and central monitoring. Confirm the final equipment list and commercial boundary in writing.

Continuous PV Recycling Equipment for Clean Energy Projects

Advantages:

  • Continuous production saves labor costs;
  • Intelligent monitoring system enables real-time tracking of recovery rates and energy consumption data;
  • Cooling circulation system and noise reduction devices are optional for adaptability to diverse operational environments.
Configuration-controlled performance.

Installed power, tapak, staffing and measured recovery are released only with the approved model, representative material test and site scope.

What Are Our Services and Cooperation Advantages?

Our services focus on the clean energy sector, offering clients sustainable PV recycling equipment for clean energy projects.

DASAR TEKNIK YANG DISELASKAN KATALOG

Complete route selection

Translate sustainability goals into a measurable mass balance, utility boundary and downstream route.

01

Materi masuk

Module mix, target throughput, site utilities, local environmental criteria and receiver requirements.

02

Output yang diharapkan

Documented material fractions and residues; environmental claims require a defined calculation boundary.

03

Antarmuka proyek

All line, building, utility, monitoring and downstream interfaces.

DAFTAR MODEL DAN RUANG LINGKUP

Gunakan hanya baris yang cocok dengan batas proses yang dipilih.

Referensi katalogKapasitasKekuatanAmplop fisikTermasuk batas
YSX-M1000Mekanik kaca tunggal1 th277.6 kW36 × 6 × 6 MJalur mekanis terintegrasi
YSX-TK500Tunnel thermal500 kg/jam116.65 kW65 × 13 × 7.5 MContinuous tunnel thermal line
YSX-TK1000Tunnel thermal1,000 kg/jam126.65 kW72 × 13 × 7.5 MContinuous tunnel thermal line
YSX-TK2000Tunnel thermal2,000 kg/jam136.65 kW80 × 13 × 7.5 MContinuous tunnel thermal line
YSX-PF5Batch thermal5 t/hari140.45 kW46 × 33 × 7.5 MMixed-module batch thermal line
YSX-PF16Batch thermal16 t/hari142.45 kW40 × 26 × 7.5 MMixed-module batch thermal line
YSX-8000Earlier integrated thermal8 t/hariConfiguration controlled50 × 30 × 8 MEarlier thermal project reference; reactor Φ2200 × 6000 × 20 mm
YSX-16000Earlier integrated thermal16 t/hariConfiguration controlled60 × 30 × 8 MEarlier thermal project reference; reactor Φ2800 × 6600 × 18 mm

Aturan konfigurasi: kapasitas katalog merupakan acuan perencanaan. Throughput yang stabil, daya terpasang/pengoperasian, tapak, pemulihan, kemurnian, emisi dan permintaan utilitas memerlukan daftar peralatan yang disetujui, syarat penerimaan materi dan tertulis yang representatif.

Informasi diperlukan sebelum konfigurasi dan kutipan

  1. Foto materi yang representatif, spesifikasi dan sampel yang tersedia.
  2. Kapasitas yang dibutuhkan ditambah jam kerja per shift, shift per hari dan hari operasional.
  3. Menargetkan keluaran, metode pengambilan sampel dan persyaratan penerima hilir.
  4. Negara situs, daya yang tersedia, bahan bakar, air, udara bertekanan dan batas bangunan.
  5. Lingkungan setempat, api, persyaratan penyimpanan dan keselamatan kerja.
  6. Batas pengiriman yang diminta: peralatan, tata letak, instalasi, komisioning dan pelatihan.