Why 1000kg/h Solar Panel Recycling Plants Will Dominate the Market by 2030?
Payback and return require a documented customer model using current quotations, feedstock contracts, accepted outputs, operating costs and financing assumptions. YUSHUNXIN does not state a fixed payback before project review.
Case Study: 1000kg/h Pyrolysis Line for Double-Glass Solar Panel Recycling
One of our clients invested in a 1000kg/h Solar Panel Recycling Plant in Japan. The objective of this project was to efficiently process both single-glass and double-glass solar panels, while simultaneously enhancing the purity of the recovered materials.
Its process flow incorporates advanced Teknologi pirolisis PV to separate the EVA layer prior to the subsequent crushing and sorting stages. Final investment and operating capacity require a written scope-specific quotation based on representative modules, operating schedule, site utilities, environmental controls and the agreed acceptance method.
Recovered fractions and their usable quality must be confirmed through a documented stable-run test, representative sampling and the downstream receiver specification. No fixed recovery, purity or resale-value result is stated for a different feedstock.
| Parameter | Specification |
|---|---|
| Processing Capacity | 1 th (1,000 kg/jam) |
| Glass Recovery Rate | Confirm by project test |
| Silver Enrichment | Concentrated in fine powder fraction — premium feedstock for silver refiners |
| Copper Recovery | Copper-bearing fraction; confirm purity and downstream acceptance |
| Silicon Enrichment | High-purity silicon cell concentrate — ideal for downstream wafer/ingot refiners |
Mechanical or tunnel thermal - not interchangeable
The same 1,000 kg/h label can describe two different routes; select by module construction and required release mechanism.
Materi masuk
Representative module list, single-/double-glass ratio, desired operating hours and receiver specifications.
Output yang diharapkan
Route-specific classified fractions; no fixed recovery or purity is assigned before stable-run testing.
Antarmuka proyek
Mechanical route: dust and material handling. Thermal route: gas, cooling and environmental controls in addition.
Gunakan hanya baris yang cocok dengan batas proses yang dipilih.
| Referensi katalog | Kapasitas | Kekuatan | Amplop fisik | Termasuk batas |
|---|---|---|---|---|
| YSX-M1000Single-glass mechanical | 1 th | 277.6 kW | 36 × 6 × 6 M | Integrated mechanical line |
| YSX-TK1000Tunnel thermal | 1,000 kg/jam | 126.65 kW | 72 × 13 × 7.5 M | Continuous tunnel thermal line |
Aturan konfigurasi: kapasitas katalog merupakan acuan perencanaan. Throughput yang stabil, daya terpasang/pengoperasian, tapak, pemulihan, kemurnian, emisi dan permintaan utilitas memerlukan daftar peralatan yang disetujui, syarat penerimaan materi dan tertulis yang representatif.
Informasi diperlukan sebelum konfigurasi dan kutipan
- Foto materi yang representatif, spesifikasi dan sampel yang tersedia.
- Kapasitas yang dibutuhkan ditambah jam kerja per shift, shift per hari dan hari operasional.
- Menargetkan keluaran, metode pengambilan sampel dan persyaratan penerima hilir.
- Negara situs, daya yang tersedia, bahan bakar, air, udara bertekanan dan batas bangunan.
- Lingkungan setempat, api, persyaratan penyimpanan dan keselamatan kerja.
- Batas pengiriman yang diminta: peralatan, tata letak, instalasi, komisioning dan pelatihan.