Do not treat a reactor name or daily capacity as a complete project specification.
Råstoff, preparat, operating continuity, kondensasjon, gas safety, product handling, miljøkontroller, utilities and local delivery scope must be configured together.
Approved small-scale reference
YSX-F1 to YSX-F5 denote 1, 2, 3, 4 og 5 t/day skid or modular planning references for tire, plastic or oily-sludge trials.
Material balance
Oil, gass, solids and metal-bearing outputs require representative feedstock, stable-run data and an agreed sampling boundary.
Kommersiell grense
Prices, driftskostnader, product value and return require dated quotations and local market evidence.
Source control: approved YOTO group product register. Final parameters are issued on the project-specific technical agreement.
YUSHUNXIN PLASTIC PYROLYSIS
Waste Plastic Pyrolysis Plant Configured From Feedstock Chemistry
Plan pre-treatment, thermal processing, dewaxing, kondensasjon, tail-gas handling and product storage as one project boundary. Plastic type, chlorine risk, moisture and feed consistency determine whether a proposed route is technically meaningful.

FEEDSTOCK FIRST
Plastic category alone is not enough for plant selection.
Polymer mix
PP, PE and PS may be suitable within a reviewed mix; PVC and other chlorine-bearing materials require special attention.
Physical condition
Film, rigid plastic, fluff, shredded material, fuktighet, dirt and metal contamination.
Supply stability
Daily availability, composition variation, storage and pre-treatment consistency.
Product objective
Define the intended oil fraction, gas use, residue handling and local sales or use boundary.
PROCESS BOUNDARY
Control the material before, during and after thermal treatment.
- 01
Sort and characterize
Confirm polymer mix, fuktighet, chlorine risk, additives and incompatible materials.
- 02
Prepare the feed
Makulering, cleaning or drying is selected from the incoming condition and feeding method.
- 03
Feed and thermally process
Batch or continuous architecture is matched to supply stability, operating plan and site capability.
- 04
Manage wax and condensation
Wax-forming feedstocks may require a project-configured dewaxing stage before or within condensation.
- 05
Handle gas, oil and residue
Define non-condensable gas use, oil storage, residue cooling and tail-gas treatment.
PROSESS MEDIA & UTSTYRS KONTEKS
Connect each equipment area to the operating basis.
These images show the furnace, overall layout, workshop context and output-handling area together with their process roles.
APPROVED CONFIGURATION BASIS
Use the reference envelope as a discussion starting point.
No universal oil yield, fixed price, emissions result or project profitability is stated. These depend on verified feedstock, local energy and product economics, operating conditions and regulatory requirements.
PROJECT GATES
Four reviews should be complete before procurement.
Feedstock gate
Composition, fuktighet, chlorine, ash, metal and supply consistency.
Process gate
Forbehandling, fôring, thermal architecture, dewaxing, condensation and residue handling.
Site gate
Utilities, lagring, fire safety, emissions controls, labor and maintenance access.
Commercial gate
Scope inclusions, local obligations, product outlet, acceptance method and delivery boundary.
PROSJEKT FAQ
Avoid comparing plants before the feedstock is comparable.
Can mixed plastic be processed?
Potentially, but the expected polymer and contamination range must be defined. Chlorine-bearing and incompatible materials can change process, corrosion and gas-treatment requirements.
How much oil will the plant produce?
Ingen universell avkastning er publisert. Yield depends on representative feedstock composition, fuktighet, contaminants, operating conditions, condensation boundary and measurement method.
Should I choose batch or continuous operation?
The choice depends on feedstock preparation and stability, plant scale, labor model, maintenance plan, site capability and investment stage.
Does the equipment automatically satisfy local emissions rules?
Ingen. Destination-country permits, emission limits, monitoring and site obligations must be confirmed as part of the project boundary.
START THE PLASTIC REVIEW
Share composition, contamination and operating plan.
The project desk will review missing facts before discussing configuration or price.
Waste-plastic pyrolysis starts with polymer identification and sorting
PE-, PP- and selected PS-rich streams can follow different thermal and condensation behavior. PVC, PET, brominated plastics, medical plastics and e-waste plastics require separate assessment.

Følg materialet, damp, flytende, gass og faste veier
Reaktoren er en del av linjen. Kommersiell drift avhenger av hvordan hver strøm er forberedt, overført, kontrollert og utladet.
- 01Materialkarakterisering
- 02Fôrklargjøring og forseglet overføring
- 03Kontrollert termisk konvertering
- 04Dampseparasjon og trinnvis kondensering
- 05Ikke-kondenserbar gasssikkerhet og gjenbruk
- 06Solid kjøling, utslipp og produkthåndtering
Konfigurasjonsspørsmål som endrer forslaget
Følgende punkter bør løses før du velger en kapasitet eller utarbeider et kommersielt tilbud.
Polymer composition
Confirm PE, PP, PS, PVC and PET proportions instead of describing the feed simply as mixed plastic.
Halogen control
PVC and brominated additives can change corrosion, gas-cleaning and recovered-liquid requirements.
Wax management
Plastic-derived vapors and liquids may require temperature-controlled lines, insulation and condensation staging.
Product route
Define whether recovered liquid is intended for permitted fuel use, refinery feed evaluation or another locally accepted outlet.
Gjør verktøy og produktutsalg synlige før investering
En nyttig mulighetsgjennomgang kobler sammen massebalansen, energibalanse, driftsplan og lokal produktrute.
Driftsplan
Definer planlagte timer per dag, stenge vinduer, rensestrategi, arbeidsmodell og råstofflagringskapasitet.
Energiintegrasjon
Vurder gjenbruk av ikke-kondenserbar gass, oppstartsdrivstoff, elektriske belastninger, kjølebehov og valgfri nedstrøms energibruk som én balanse.
Kvalitetskontroll
Sett prøvetakingspunkter for innkommende materiale, kondensatfraksjoner, gjenvunnet faststoff, avløpsvann og avgass.
Kommersiell grense
Budsjettresultater forblir betingede inntil råstoffet, nettstedet, produktrute og lokale samsvarskrav er bekreftet.
Se grensen for tilkoblet utstyr.
Visuelle referanser støtter tidlig layoutdiskusjon. Endelig utstyr, arrangement og grensesnitt bekreftes fra prosjektmaterialet og nettstedet.
Oversett prosjektfakta til en utstyrsliste.
Denne referansematrisen viser beslutningslogikken. Endelige mengder, modeller og grensesnitt hører hjemme i det godkjente prosjektforslaget.
| Systemblokk | Typisk omfang | Konfigurasjonsgrunnlag |
|---|---|---|
| Polymer preparation | Sortering, shredding, drying and removal of incompatible fractions | PE, PP, PS, PVC, PET and additive profile |
| Feed and conversion | Density control, sealed transfer, reactor and heating system | Bulk density, melt behavior and operating duty |
| Wax and liquid handling | Temperature-controlled vapor lines, trinnvis kondensering og lagring | Wax tendency and target recovered-liquid route |
| Halogen and gas control | Material exclusion, corrosion review and gas-treatment provisions | PVC, brominated additives and local limits |
| Residue and utilities | Solid discharge, cooling, water and electrical interfaces | Residue classification and site conditions |
Fremme prosjektet bare når nødvendig bevis er tilgjengelig.
Hver gate gjør kundeinformasjon til en definert teknisk eller kommersiell produksjon for neste beslutning.
Polymer screen
Quantify target polymers, PVC, PET, additives, fuktighet og forurensning.
ProduksjonAccepted and excluded feed specificationThermal route
Validate feeding, wax behavior, condensation and corrosion controls.
ProduksjonMaterial-specific process routeProduct and permit
Confirm recovered-product status, outlets and local environmental boundary.
ProduksjonCommercial and compliance evidence packConfiguration review
Freeze preparation, reactor, bedring, utilities and acceptance interfaces.
ProduksjonProject configuration basisSpørsmål å løse før konfigurasjon.
Svar definerer den tekniske grensen; de erstatter ikke representativ materialtesting eller lokal samsvarsgjennomgang.
Hva bestemmer listen over kontinuerlig pyrolyseutstyr?
Råstoffform, komposisjon, fuktighet, forurensning, planlagt driftsplan, rute for gjenvunnet produkt, nettstedsverktøy og tillatelseskrav bestemmer konfigurasjonen.
Kan dekk, plast og oljeholdig slam bruker nøyaktig samme linje?
Ingen. De kan dele prinsipper for termisk konvertering, men deres forberedelse, fôring, korrosjon, kondensasjon, solid håndtering og miljøkontroller er vesentlig forskjellige.
Kan gjenvunnet oljes ytelse garanteres fra en generell materialbeskrivelse?
Ingen. Representativ analyse og en avtalt prøvetakingsmetode kreves før gjenvunnet væskemengde, kvalitet eller nedstrøms bruk kan evalueres.
Hva bør inkluderes i akseptansetesting?
Definer råstoff, løps varighet, massebalanse, driftsstabilitet, samplede utganger, verktøy, sikkerhetsforriglinger og gjeldende utslippstester eller rester.
Definer materialet før du velger utstyr.
Del en representativ materialbeskrivelse, tilgjengelig volum, nettstedstatus og målutganger. YUSHUNXIN vil bruke disse faktaene til å forberede den relevante prosessgrensen og konfigurasjonsdiskusjonen.