Integrerte grønne industri- og ressursutvinningsløsninger av YUSHUNXIN

YUSHUNXIN komplette grønne industrielle løsninger

CONTACT YUSHUNXIN · GREEN INDUSTRIAL PROJECT DESK

Contact the YUSHUNXIN Green Industrial Project Team

Discuss a material stream, equipment requirement or project plan directly, or complete the structured brief so the team can review the operating basis, site interfaces and current decision stage.

PREPARE BEFORE SUBMITTING

Five facts make the first response more useful.

01

Prosjektfamilie

Batteri, PV, pyrolyse, aluminum processing or another material stream.

02

Material condition

Kilde, komposisjon, inndataformat, størrelse, fuktighet, contamination and pre-treatment.

03

Operating and output basis

Tilgjengelig volum, expected schedule, target streams and the capacity basis you are evaluating.

04

Site and system interfaces

Location, verktøy, miljøkontroller, readiness, retrofit requirements and delivery interfaces.

05

Decision stage

Research, gjennomførbarhet, configuration comparison, budsjett, sourcing or procurement.

    PROSJEKTBREV

    Start med kontakten din. Bygg den rette prosjektveien.

    Fire korte trinn lagrer prosjektfakta mens du går.

    01

    Kontakt og prosjektvei

    Hvem skal få oppfølgingen, og hvilken materialstrøm det er snakk om?






    02

    Materiale og driftsgrunnlag

    Beskriv råstoffet før du diskuterer utstyrslisten.



    03

    Beslutningsstadiet og neste milepæl

    Dette hjelper forretningsteamet med å gi et passende neste trinn.




    FØR SENDING

    Se gjennom prosjektfakta.

    Endelig kapasitet, konfigurasjon, layout, utskriftskvalitet, leveringsplan og kommersielle vilkår bekreftes kun etter gjennomgang av materiale og nettsted.


    Gå til toppen