Connect recovered-liquid characterization, conditioning, generator selection and electrical integration in one project scope.

YUSHUNXIN ENERGY INTEGRATION

Match pyrolysis-oil conditioning to the generator and operating duty.

Tire-derived and plastic-derived liquids differ in sulfur, solids, viscosity, light fractions and wax behavior. The generator package must be selected after fuel sampling and an agreed conditioning route.

Reference continuous pyrolysis line connected to downstream energy use
01 / FUEL PATH

Do not connect raw recovered liquid directly to a standard genset by assumption

The conditioning train should be based on representative fuel analysis and the engine supplier's written limits.

  1. 01Settling and bulk separation
  2. 02Filtration and solids control
  3. 03Water separation
  4. 04Temperature and viscosity conditioning
  5. 05Day-tank and fuel-supply control
  6. 06Compatible engine and exhaust system
02 / DESIGN QUESTIONS

Make the fuel and electrical boundaries explicit

A practical proposal connects fuel variability, generator duty and site infrastructure.

Fuel characterization

Analyze density, viscosity, 물, sediment, 황, flash point, distillation behavior and any wax or halogen concern.

Engine compatibility

Confirm whether the application requires a heavy-fuel, dual-fuel or other approved engine configuration.

Duty profile

Separate continuous base-load, variable-load, standby and islanded-power applications; they impose different controls and redundancy.

Electrical integration

Define voltage, frequency, synchronization, transformer, switchgear, protection and any grid-connection requirements.

03 / OPERATING SAFEGUARDS

Plan storage, fire protection and emissions with the generator package

Commercial evaluation remains conditional on the local fuel classification and permitting route.

Storage and transfer

Use compatible tanks, bunding, ventilation, temperature control, filtration bypass management and spill response.

Quality release

Set a fuel release test and reject route so off-spec batches do not reach the engine.

Maintenance model

Budget for injectors, filters, lubricant monitoring, deposits and exhaust after-treatment based on actual fuel quality.

Energy balance

Compare recoverable fuel, internal thermal demand, generator consumption, auxiliary loads and usable net electricity.

참조 구성

프로젝트 정보를 장비 목록으로 변환.

이 참조 매트릭스는 결정 논리를 보여줍니다.. 최종 수량, 모델과 인터페이스는 승인된 프로젝트 제안에 속합니다..

시스템 블록일반적인 범위구성기준
Bulk fuel handlingSettling, storage, bunding and controlled transferFuel classification and representative analysis
Conditioning skidFiltration, water separation and temperature or viscosity controlWritten engine fuel limits
Fuel supplyDay tank, circulation, metering, isolation and reject routeDuty cycle and off-spec management
Generator packageCompatible engine, controls, exhaust and safety systemsApproved fuel, load profile and maintenance basis
Electrical and heat recoverySwitchgear, protection, synchronization and optional heat interfaceSite electrical boundary and usable energy demand
단계별 결정 경로

필요한 증거가 있는 경우에만 프로젝트를 진행하세요..

각 게이트는 고객 정보를 다음 결정을 위해 정의된 기술 또는 상업적 출력으로 전환합니다..

01

Fuel evidence

Sample the recovered liquid and define batch variability.

산출Fuel-analysis and classification record
02

Compatibility review

Compare the analysis with written engine and conditioning limits.

산출Approved fuel-conditioning boundary
03

Site integration

Define duty, electrical protection, storage, fire and exhaust interfaces.

산출Single-line and interface basis
04

Commercial proposal

Quote only against the approved fuel, duty and delivery boundary.

산출Traceable configuration and exclusions
프로젝트 FAQ

구성 전에 해결해야 할 질문.

답변은 엔지니어링 경계를 정의합니다; 이는 대표적인 재료 테스트 또는 현지 규정 준수 검토를 대체하지 않습니다..

Can untreated pyrolysis oil be used in any diesel generator?

아니요. 연료 분석, conditioning and written engine compatibility limits are required. Standard high-speed diesel engines should not be assumed compatible.

What fuel tests should be prepared?

Typical evaluation includes density, viscosity, 물, sediment, 황, flash point, distillation behavior and any wax or halogen concern.

What is included beyond the generator?

The project may require settling, filtration, water separation, temperature control, storage, day tanks, 화재 예방, switchgear, synchronization and exhaust treatment.

How should net electrical output be evaluated?

Compare usable conditioned fuel, internal thermal demand, generator consumption, auxiliary loads, operating duty and electrical losses under the agreed project basis.

프로젝트 엔지니어링 검토

장비를 선택하기 전에 재료를 정의하십시오..

대표적인 자료 설명 공유, 사용 가능한 볼륨, 사이트 상태 및 대상 출력. YUSHUNXIN은 이러한 사실을 사용하여 관련 프로세스 경계 및 구성 논의를 준비합니다..

프로젝트 검토 시작