YUSHUNXIN UBC DECOATING & TOPLJENJE
Povežite pripremu za UBC, uklanjanje premaza, topljenje, livenje ili isporuka rastopljenog metala, kontrola prašine i korištenje topline kao jedan projektirani sistem. Projekt počinje stanjem otpada i potrebnim granicama aluminijskih proizvoda.

INPUT & IZLAZNA GRANICA
Stabilan rad zavisi od materijala oko aluminijuma.
Obrazac za otpad
Loose limenke, bale, usitnjeni UBC ili pripremljena hrana za peć.
Dolazno stanje
Vlaga, prljavština, kontaminacija željezom, plastika, opterećenje premaza i istorija skladištenja.
Operativna osnova
Obim ponude, radni raspored, goriva i snage, prozori za rad i održavanje.
Forma proizvoda
Liveni ingot, isporuka rastopljenog aluminijuma ili dogovoreni međuproizvod.
INTEGRISANI PROCES
Dekoizacija je dio strategije topljenja - ne izolirana peć.
- 01
Primite i pripremite
Inspect, debalirati ili usitniti, ukloniti nekompatibilne kontaminante i stabilizirati prezentaciju hrane.
- 02
Termički ukloniti premaze
Kontrolirajte temperaturu, prebivalište, kretanje kiseonika i materijala oko stvarnog stanja UBC.
- 03
Upravljajte procesnim gasom
Integrisati sagorevanje, strategija kontrole prašine i korištenja topline unutar dogovorenih granica lokacije.
- 04
Rastopite i kondicionirajte
Uskladite rad peći sa pripremljenom hranom, plan legure i ciljna proizvodnja metala.
- 05
Cast ili transfer
Konfigurirajte livenje ingota ili rukovanje rastopljenim metalom, uključujući sigurnost i nizvodnu logistiku.
PROCESNI MEDIJI & KONTEKST OPREME
Pratite materijal od limenki do pripremljene hrane za peć.
Galerija povezuje sirovinu, usitnjavanje i uklanjanje premaza slika na procesnu ulogu koju svako područje podržava.
ODOBRENA KOVERTA PROJEKTA
Referentni uslovi za ranu raspravu o inženjerstvu.
Temperature su odobrene reference za planiranje, not universal operating setpoints. Prinos metala, korišćenje energije, rezultat emisija i kvalitet proizvoda zahtijevaju potvrđenu osnovu za otpad i lokaciju.
INTEGRACIJA PROJEKTA
Definirajte svaki prijenos oko peći.
Primopredaja materijala
Prijem otpada, skladištenje, debaliranje, usitnjavanje i uklanjanje zagađivača.
Thermal handoff
Pripremljen UBC transfer, rukovanje gasom, hvatanje prašine i granica korištenja topline.
Metal handoff
Holding, uzorkovanje, livenje, rastopljeni transfer, hlađenje i skladištenje.
Site handoff
Gorivo, moć, fondacije, ventilaciju, sigurnost, praćenje, zahtjevi za lokalne dozvole i raspodjela odgovornosti.
PROJEKT FAQ
Pitanja koja mijenjaju dizajn peći i linije.
Može li linija direktno prihvatiti balirane limenke?
Priprema hrane zavisi od gustine bale, kontaminacije, vlage i odabranog načina prijenosa. Podijelite reprezentativne bale i uslove skladištenja za pregled.
Je li prinos metala zagarantovan?
Ne objavljuje se univerzalni prinos. Zavisi od ulaznog sadržaja aluminijuma, premazi, kontaminacije, priprema, oksidacija, rada peći i dogovorene granice mjerenja.
Treba li projekt proizvoditi ingote ili rastopljeni aluminij?
Izbor zavisi od udaljenosti nizvodno, sinhronizacija proizvodnje, kontrola legure, sigurnost, skladištenje i komercijalni zahtjevi.
Da li ponovna upotreba topline jamči usklađenost s lokalnim emisijama?
br. Korištenje topline može biti dio dizajna procesa, ali lokalne granice, moduli tretmana, praćenje i izdavanje dozvola moraju se posebno potvrditi.
ZAPOČNITE UBC PREGLED
Podijelite stanje otpada, obrazac proizvoda i uslužni programi stranice.
YUSHUNXIN će identificirati proces koji nedostaje i komercijalne granice.
Build the decoating line around the incoming aluminum scrap.
A connected project can combine size reduction, ferrous and non-ferrous separation, controlled thermal decoating, off-gas management, melting and ingot handling. The final scope depends on the coating system, scrap density, contamination and downstream metal specification.

From incoming UBC bales to a controlled furnace feed
The line should be configured as a material-to-output system rather than a standalone furnace.
- 01Receiving and bale opening
- 02Shredding and size control
- 03Magnetic and eddy-current separation
- 04Controlled thermal decoating
- 05Gas treatment and heat integration
- 06Optional melting, casting and palletizing
What changes the equipment list
A reliable proposal starts with the actual scrap profile and the agreed delivery boundary.
Feedstock form
Loose limenke, compacted bales, mixed packaging scrap, painted profiles and oily turnings require different opening, feeding and separation arrangements.
Coating and contamination
Paint, ink, lacquer, polymer film, ulje, vlage, iron and non-metallic contamination influence residence time, gas handling and downstream metal cleaning.
Downstream route
Decoated scrap may be sold, remelted on site or integrated with refining, casting and automatic stacking. Each route changes utilities and layout.
Environmental boundary
The off-gas train must be selected against the coating chemistry, local permit basis, fuel system and required monitoring points.
Design decisions that protect metal value and operating stability
Published figures are planning references and require project confirmation. Representative feedstock testing and a documented acceptance basis are required.
Atmosphere control
Limit uncontrolled air ingress and monitor the thermal environment to reduce oxidation risk and maintain repeatable coating removal.
Material balance
Record incoming scrap, separated contaminants, decoated aluminum, residues and optional molten-metal output.
Heat integration
Evaluate recovered process gas and hot exhaust as project energy streams only after their composition and stability are understood.
Acceptance plan
Agree sampling, test method, run duration, product cleanliness, emissions boundary and utility conditions before commercial acceptance.
See the connected equipment boundary.
Reference visuals support early layout discussion. Final equipment, arrangement and interfaces are confirmed from the project material and site.
Translate project facts into an equipment list.
This reference matrix shows the decision logic. Final quantities, models and interfaces belong in the approved project proposal.
| System block | Typical scope | Configuration basis |
|---|---|---|
| Material preparation | Bale opening, shredding, sizing and controlled transfer | Obrazac za otpad, density and required furnace feed |
| Separation | Magnetic, eddy-current and manual or sensor-based quality control | Iron, non-ferrous attachments and non-metallic contamination |
| Thermal section | Controlled decoating reactor, seals, heating and discharge | Coating load, residence basis and oxidation control |
| Environmental section | Gas combustion or oxidation, particulate and polishing stages | Coating chemistry and local emissions boundary |
| Downstream metal | Cooling, skladištenje, optional melting, casting and palletizing | Target product and agreed delivery scope |
Unaprijedite projekat samo kada su potrebni dokazi dostupni.
Svaka kapija pretvara informacije o klijentima u definirani tehnički ili komercijalni rezultat za sljedeću odluku.
Scrap profile
Confirm scrap category, premazivanje, oils, attachments and incoming form.
IzlazRepresentative scrap and contamination recordRoute definition
Define preparation, razdvajanje, decoating and downstream metal boundary.
IzlazAgreed material-to-product flowEnvironmental basis
Identify coating chemistry, off-gas, residue and local test requirements.
IzlazControl and monitoring registerAcceptance plan
Agree tested feed, uzorkovanje, stable run and downstream quality checks.
IzlazMeasurable project acceptance sheetPitanja koja treba riješiti prije konfiguracije.
Odgovori definiraju inženjersku granicu; oni ne zamjenjuju reprezentativno testiranje materijala ili lokalni pregled usklađenosti.
What information is required to configure an aluminum decoating line?
Provide the scrap category, coating or oil condition, bale or particle dimensions, kontaminacije, dostupan volumen, downstream metal route, site utilities and local environmental basis.
Can one standard line process every type of aluminum scrap?
br. UBC bale, painted profiles, automotive scrap and oily turnings can require different opening, razdvajanje, feeding, thermal and gas-treatment arrangements.
Is melting and ingot casting always included?
br. The project can stop at cleaned scrap or include melting, refining, casting and palletizing when those interfaces are part of the agreed scope.
How should project acceptance be defined?
Acceptance should state the tested feedstock, sampling method, stable operating period, material balance, product-cleanliness basis, utility conditions and environmental measurement boundary.
Definirajte materijal prije odabira opreme.
Podijelite reprezentativni opis materijala, dostupan volumen, status lokacije i ciljne rezultate. YUSHUNXIN će koristiti te činjenice da pripremi relevantnu diskusiju o granicama procesa i konfiguraciji.
Konfigurirajte decoating, topljenje, cirkulacija i livenje kao jedan termalni sistem.
Odobreni UBC katalog predstavlja raspon kapaciteta projekta od 1.000-25.000 kg/h. To je raspon koji se može konfigurirati, niti jedna univerzalna mašina ili zagarantovan stabilan učinak.
Počnite s opterećenjem premaza i završite s dogovorenom metalnom specifikacijom.
- 01Kvalifikacija za otpadUBC, briket ili miješani aluminij; premazivanje, ulje, profil vlage i legure.
- 02Kontrolirano nanošenje premazaVrijeme zadržavanja i termičko opterećenje prate podneseno opterećenje premaza.
- 03Interfejs plina i toplineSekundarni tretman, filtracija i povrat topline čine jednu granicu.
- 04Topljenje sa straneNapunite, cirkulacija i držanje su konfigurisani za cilj legure.
- 05Casting acceptanceIngotna hemija, šljam, energija i emisije su potvrđene projektnim dokazima.
Osnova za dekoraciju
Boja za dokumente, ulje, plastika, prljavština, vlage, priključci i stanje bala.
Osnova za topljenje
Potvrdite bočnu peć, ALUSWIRLER® cirkulacija, sučelja za držanje i livenje.
Dokazna osnova
Prinos metala, šljam, energije, emisije i kvalitet ingota zahtijevaju reprezentativno ispitivanje.