YUSHUNXIN UBC DECOATING & MELTING

Conecte la preparación de la UBC, eliminación de recubrimiento, melting, casting or molten-metal delivery, dust control and heat utilization as one engineered system. The project begins with scrap condition and the required aluminum product boundary.

YUSHUNXIN aluminum can de-coating line
Integrated UBC lineLine context from incoming cans through preparation, de-coating and downstream metal handling.

INPUT & OUTPUT BOUNDARY

Stable operation depends on the material around the aluminum.

01

Scrap form

Loose cans, bales, shredded UBC or a prepared furnace feed.

02

condición entrante

Humedad, dirt, ferrous contamination, plástico, coating load and storage history.

03

Base operativa

Volumen de suministro, horario de trabajo, fuel and power, labor and maintenance windows.

04

Product form

Cast ingot, molten aluminum supply or an agreed intermediate output.

INTEGRATED PROCESS

Decoating is part of the melting strategy—not an isolated furnace.

  1. 01

    Receive and prepare

    Inspect, debale or shred, remove incompatible contaminants and stabilize feed presentation.

  2. 02

    Thermally remove coatings

    Control temperature, residence, oxygen and material movement around the actual UBC condition.

  3. 03

    Manage process gas

    Integrate combustion, dust control and heat-use strategy within the agreed site boundary.

  4. 04

    Melt and condition

    Match furnace operation to prepared feed, alloy plan and the target metal output.

  5. 05

    Cast or transfer

    Configure ingot casting or molten-metal handling, including safety and downstream logistics.

MEDIOS DE PROCESO & CONTEXTO DEL EQUIPO

Follow the material from cans to prepared furnace feed.

The gallery connects feedstock, shredding and de-coating images to the process role each area supports.

APPROVED PROJECT ENVELOPE

Reference conditions for early engineering discussion.

System areaReferencia aprobadaProject-specific decision
Line architectureDecoating furnace linked with aluminum melting furnaceFeed preparation, transfer method, operating schedule and layout
Metal outputIngot casting at about 720°C or molten aluminum supply at about 760°C referenceAlloy, temperature window, muestreo, transfer distance and acceptance method
Core modulesTrituración, decoating, melting, ingot casting, dust control and heat utilizationActual inclusions, utilidades, redundancy and local environmental boundary

Temperatures are approved planning references, not universal operating setpoints. Metal yield, energy use, emissions result and product quality require a confirmed scrap and site basis.

PROJECT INTEGRATION

Define every handoff around the furnaces.

Material handoff

Scrap reception, almacenamiento, debaling, shredding and contaminant removal.

Thermal handoff

Prepared UBC transfer, manejo de gases, dust capture and heat-use boundary.

Metal handoff

Holding, muestreo, casting, molten transfer, cooling and storage.

Site handoff

Fuel, fuerza, foundations, ventilation, seguridad, escucha, local permit requirements and responsibility allocation.

Preguntas frecuentes sobre el proyecto

Questions that change furnace and line design.

Can the line accept baled cans directly?

Feed preparation depends on bale density, contaminación, moisture and the selected transfer method. Share representative bales and storage conditions for review.

Is metal yield guaranteed?

No se publica ningún rendimiento universal. It depends on incoming aluminum content, coatings, contaminación, preparación, oxidation, furnace operation and the agreed measurement boundary.

Should the project produce ingots or molten aluminum?

The choice depends on downstream distance, production synchronization, alloy control, seguridad, storage and commercial requirements.

Does heat reuse guarantee local emissions compliance?

No. Heat utilization can be part of the process design, but local limits, treatment modules, monitoring and permitting must be confirmed separately.

START THE UBC REVIEW

Share scrap condition, product form and site utilities.

YUSHUNXIN will identify the missing process and commercial boundaries.

Enviar resumen del proyecto

YUSHUNXIN ALUMINUM RECOVERY

Build the decoating line around the incoming aluminum scrap.

A connected project can combine size reduction, ferrous and non-ferrous separation, controlled thermal decoating, off-gas management, melting and ingot handling. The final scope depends on the coating system, scrap density, contamination and downstream metal specification.

Reference layout for an aluminum can shredding and thermal decoating line
01 / PROCESS ROUTE

From incoming UBC bales to a controlled furnace feed

The line should be configured as a material-to-output system rather than a standalone furnace.

  1. 01Receiving and bale opening
  2. 02Shredding and size control
  3. 03Magnetic and eddy-current separation
  4. 04Controlled thermal decoating
  5. 05Gas treatment and heat integration
  6. 06Optional melting, casting and palletizing
02 / CONFIGURATION BASIS

What changes the equipment list

A reliable proposal starts with the actual scrap profile and the agreed delivery boundary.

Forma de materia prima

Loose cans, compacted bales, mixed packaging scrap, painted profiles and oily turnings require different opening, feeding and separation arrangements.

Coating and contamination

Paint, ink, lacquer, polymer film, aceite, humedad, iron and non-metallic contamination influence residence time, gas handling and downstream metal cleaning.

Downstream route

Decoated scrap may be sold, remelted on site or integrated with refining, casting and automatic stacking. Each route changes utilities and layout.

Environmental boundary

The off-gas train must be selected against the coating chemistry, local permit basis, fuel system and required monitoring points.

03 / PROJECT CONTROLS

Design decisions that protect metal value and operating stability

Published figures are planning references and require project confirmation. Representative feedstock testing and a documented acceptance basis are required.

Atmosphere control

Limit uncontrolled air ingress and monitor the thermal environment to reduce oxidation risk and maintain repeatable coating removal.

balance de materia

Record incoming scrap, separated contaminants, decoated aluminum, residues and optional molten-metal output.

Heat integration

Evaluate recovered process gas and hot exhaust as project energy streams only after their composition and stability are understood.

Acceptance plan

Agree sampling, test method, duración de la ejecución, product cleanliness, emissions boundary and utility conditions before commercial acceptance.

CONFIGURACIÓN DE REFERENCIA

Traducir los datos del proyecto en una lista de equipos..

Esta matriz de referencia muestra la lógica de decisión.. Cantidades finales, Los modelos e interfaces pertenecen a la propuesta de proyecto aprobada..

Bloque del sistemaAlcance típicoBase de configuración
Material preparationBale opening, shredding, sizing and controlled transferScrap form, density and required furnace feed
SeparaciónMagnetic, eddy-current and manual or sensor-based quality controlIron, non-ferrous attachments and non-metallic contamination
Thermal sectionControlled decoating reactor, seals, heating and dischargeCoating load, residence basis and oxidation control
Environmental sectionGas combustion or oxidation, particulate and polishing stagesCoating chemistry and local emissions boundary
Downstream metalCooling, almacenamiento, optional melting, casting and palletizingTarget product and agreed delivery scope
RUTA DE DECISIÓN SEGÚN ETAPAS

Avanzar en el proyecto sólo cuando la evidencia requerida esté disponible..

Cada puerta convierte la información del cliente en un resultado técnico o comercial definido para la siguiente decisión..

01

Scrap profile

Confirm scrap category, coating, oils, attachments and incoming form.

ProducciónRepresentative scrap and contamination record
02

Route definition

Define preparation, separación, decoating and downstream metal boundary.

ProducciónAgreed material-to-product flow
03

Environmental basis

Identify coating chemistry, off-gas, residue and local test requirements.

ProducciónControl and monitoring register
04

Acceptance plan

Agree tested feed, muestreo, stable run and downstream quality checks.

ProducciónMeasurable project acceptance sheet
Preguntas frecuentes sobre el proyecto

Preguntas a resolver antes de la configuración.

Las respuestas definen los límites de la ingeniería; No reemplazan las pruebas de materiales representativas ni la revisión de cumplimiento local..

What information is required to configure an aluminum decoating line?

Provide the scrap category, coating or oil condition, bale or particle dimensions, contaminación, volumen disponible, downstream metal route, site utilities and local environmental basis.

Can one standard line process every type of aluminum scrap?

No. fardos UBC, painted profiles, automotive scrap and oily turnings can require different opening, separación, alimentación, thermal and gas-treatment arrangements.

Is melting and ingot casting always included?

No. The project can stop at cleaned scrap or include melting, refining, casting and palletizing when those interfaces are part of the agreed scope.

How should project acceptance be defined?

Acceptance should state the tested feedstock, sampling method, stable operating period, material balance, product-cleanliness basis, utility conditions and environmental measurement boundary.

REVISIÓN DE INGENIERÍA DE PROYECTO

Definir el material antes de seleccionar el equipo..

Compartir una descripción de material representativa, volumen disponible, estado del sitio y resultados objetivo. YUSHUNXIN utilizará esos hechos para preparar la discusión de configuración y límites del proceso relevante..

Iniciar revisión del proyecto
UBC INTEGRATED DECOATING & MELTING

Configure decoating, melting, circulation and casting as one thermal system.

The approved UBC catalogue presents a project capacity range of 1,000–25,000 kg/h. It is a configurable range, not one universal machine or guaranteed stable output.

CONNECTED THERMAL ROUTE

Start with coating burden and finish with an agreed metal specification.

  1. 01Scrap qualificationUBC, briquette or mixed aluminum; coating, aceite, moisture and alloy profile.
  2. 02Controlled decoatingResidence time and thermal duty follow the submitted coating burden.
  3. 03Gas and heat interfaceSecondary treatment, filtration and heat recovery form one boundary.
  4. 04Side-well meltingCharge, circulation and holding are configured to the alloy target.
  5. 05Casting acceptanceIngot chemistry, dross, energy and emissions are confirmed by project evidence.
A

Decoating basis

Document paint, aceite, plástico, dirt, humedad, attachments and bale condition.

B

Melting basis

Confirm side-well furnace, ALUSWIRLER® circulation, holding and casting interfaces.

do

Evidence basis

Metal yield, dross, energy, emissions and ingot quality require a representative trial.

Catalogue boundaryFinal temperature setpoints, rendimiento, environmental controls and product acceptance are issued on the signed process design and technical agreement.