YUSHUNXIN UBC DECOATING & MELTING

接続UBCの準備, コーティング除去, melting, casting or molten-metal delivery, dust control and heat utilization as one engineered system. The project begins with scrap condition and the required aluminum product boundary.

YUSHUNXIN aluminum can de-coating line
Integrated UBC lineLine context from incoming cans through preparation, de-coating and downstream metal handling.

INPUT & OUTPUT BOUNDARY

Stable operation depends on the material around the aluminum.

01

Scrap form

Loose cans, bales, shredded UBC or a prepared furnace feed.

02

受信状態

水分, dirt, ferrous contamination, プラスチック, coating load and storage history.

03

事業基盤

Supply volume, working schedule, 燃料と動力, labor and maintenance windows.

04

Product form

Cast ingot, molten aluminum supply or an agreed intermediate output.

INTEGRATED PROCESS

Decoating is part of the melting strategy—not an isolated furnace.

  1. 01

    Receive and prepare

    Inspect, debale or shred, remove incompatible contaminants and stabilize feed presentation.

  2. 02

    Thermally remove coatings

    Control temperature, residence, oxygen and material movement around the actual UBC condition.

  3. 03

    Manage process gas

    Integrate combustion, dust control and heat-use strategy within the agreed site boundary.

  4. 04

    Melt and condition

    Match furnace operation to prepared feed, alloy plan and the target metal output.

  5. 05

    Cast or transfer

    Configure ingot casting or molten-metal handling, including safety and downstream logistics.

プロセスメディア & 機器のコンテキスト

Follow the material from cans to prepared furnace feed.

The gallery connects feedstock, shredding and de-coating images to the process role each area supports.

APPROVED PROJECT ENVELOPE

Reference conditions for early engineering discussion.

System area承認された参考文献Project-specific decision
Line architectureDecoating furnace linked with aluminum melting furnace飼料の準備, transfer method, operating schedule and layout
Metal outputIngot casting at about 720°C or molten aluminum supply at about 760°C referenceAlloy, temperature window, sampling, transfer distance and acceptance method
Core modulesシュレッディング, decoating, melting, ingot casting, dust control and heat utilizationActual inclusions, 公共事業, redundancy and local environmental boundary

Temperatures are approved planning references, not universal operating setpoints. Metal yield, energy use, emissions result and product quality require a confirmed scrap and site basis.

PROJECT INTEGRATION

Define every handoff around the furnaces.

Material handoff

Scrap reception, ストレージ, debaling, shredding and contaminant removal.

Thermal handoff

Prepared UBC transfer, gas handling, dust capture and heat-use boundary.

Metal handoff

Holding, sampling, casting, molten transfer, cooling and storage.

Site handoff

Fuel, 力, foundations, ventilation, 安全性, 監視, local permit requirements and responsibility allocation.

プロジェクトに関するよくある質問

Questions that change furnace and line design.

Can the line accept baled cans directly?

Feed preparation depends on bale density, 汚染, moisture and the selected transfer method. Share representative bales and storage conditions for review.

Is metal yield guaranteed?

普遍的な利回りは公表されていない. It depends on incoming aluminum content, coatings, 汚染, 準備, oxidation, furnace operation and the agreed measurement boundary.

Should the project produce ingots or molten aluminum?

The choice depends on downstream distance, production synchronization, alloy control, 安全性, storage and commercial requirements.

Does heat reuse guarantee local emissions compliance?

いいえ. Heat utilization can be part of the process design, but local limits, treatment modules, monitoring and permitting must be confirmed separately.

START THE UBC REVIEW

Share scrap condition, product form and site utilities.

YUSHUNXIN will identify the missing process and commercial boundaries.

プロジェクト概要を送信する

YUSHUNXIN ALUMINUM RECOVERY

Build the decoating line around the incoming aluminum scrap.

A connected project can combine size reduction, ferrous and non-ferrous separation, controlled thermal decoating, off-gas management, melting and ingot handling. The final scope depends on the coating system, scrap density, contamination and downstream metal specification.

Reference layout for an aluminum can shredding and thermal decoating line
01 / PROCESS ROUTE

From incoming UBC bales to a controlled furnace feed

The line should be configured as a material-to-output system rather than a standalone furnace.

  1. 01Receiving and bale opening
  2. 02Shredding and size control
  3. 03Magnetic and eddy-current separation
  4. 04Controlled thermal decoating
  5. 05Gas treatment and heat integration
  6. 06Optional melting, casting and palletizing
02 / CONFIGURATION BASIS

What changes the equipment list

A reliable proposal starts with the actual scrap profile and the agreed delivery boundary.

原料の形態

Loose cans, compacted bales, mixed packaging scrap, painted profiles and oily turnings require different opening, feeding and separation arrangements.

Coating and contamination

Paint, インク, lacquer, polymer film, 油, 水分, iron and non-metallic contamination influence residence time, gas handling and downstream metal cleaning.

Downstream route

Decoated scrap may be sold, remelted on site or integrated with refining, casting and automatic stacking. Each route changes utilities and layout.

Environmental boundary

The off-gas train must be selected against the coating chemistry, local permit basis, fuel system and required monitoring points.

03 / PROJECT CONTROLS

Design decisions that protect metal value and operating stability

Published figures are planning references and require project confirmation. Representative feedstock testing and a documented acceptance basis are required.

Atmosphere control

Limit uncontrolled air ingress and monitor the thermal environment to reduce oxidation risk and maintain repeatable coating removal.

マテリアルバランス

Record incoming scrap, separated contaminants, decoated aluminum, residues and optional molten-metal output.

Heat integration

Evaluate recovered process gas and hot exhaust as project energy streams only after their composition and stability are understood.

Acceptance plan

Agree sampling, test method, 実行時間, product cleanliness, emissions boundary and utility conditions before commercial acceptance.

参考構成

プロジェクトの事実を機器リストに変換する.

この参照マトリックスは決定ロジックを示しています. 最終数量, モデルとインターフェースは承認されたプロジェクト提案に含まれます.

システムブロック一般的な範囲構成ベース
Material preparationBale opening, 細断, sizing and controlled transferScrap form, density and required furnace feed
分離Magnetic, eddy-current and manual or sensor-based quality controlIron, non-ferrous attachments and non-metallic contamination
Thermal sectionControlled decoating reactor, seals, heating and dischargeCoating load, residence basis and oxidation control
Environmental sectionGas combustion or oxidation, particulate and polishing stagesCoating chemistry and local emissions boundary
Downstream metal冷却, ストレージ, optional melting, casting and palletizingTarget product and agreed delivery scope
ステージゲート型の意思決定パス

必要な証拠が入手可能な場合にのみプロジェクトを進める.

各ゲートは、顧客情報を次の意思決定のために定義された技術的または商業的な成果物に変換します。.

01

Scrap profile

Confirm scrap category, コーティング, oils, attachments and incoming form.

出力Representative scrap and contamination record
02

Route definition

Define preparation, 分離, decoating and downstream metal boundary.

出力Agreed material-to-product flow
03

Environmental basis

Identify coating chemistry, off-gas, residue and local test requirements.

出力Control and monitoring register
04

Acceptance plan

Agree tested feed, sampling, stable run and downstream quality checks.

出力Measurable project acceptance sheet
プロジェクトに関するよくある質問

構成前に解決すべき質問.

答えはエンジニアリングの境界を定義します; これらは、代表的な材料試験や現地のコンプライアンスレビューに代わるものではありません。.

What information is required to configure an aluminum decoating line?

Provide the scrap category, coating or oil condition, bale or particle dimensions, 汚染, 利用可能なボリューム, downstream metal route, site utilities and local environmental basis.

Can one standard line process every type of aluminum scrap?

いいえ. UBCベール, painted profiles, automotive scrap and oily turnings can require different opening, 分離, 餌やり, thermal and gas-treatment arrangements.

Is melting and ingot casting always included?

いいえ. The project can stop at cleaned scrap or include melting, refining, casting and palletizing when those interfaces are part of the agreed scope.

How should project acceptance be defined?

Acceptance should state the tested feedstock, sampling method, stable operating period, material balance, product-cleanliness basis, utility conditions and environmental measurement boundary.

プロジェクトエンジニアリングのレビュー

機器を選択する前に材料を定義してください.

代表的な材料の説明を共有する, 利用可能なボリューム, サイトのステータスと目標の出力. YUSHUNXIN はこれらの事実を使用して、関連するプロセス境界と構成に関する議論を準備します。.

プロジェクトのレビューを開始する
UBC INTEGRATED DECOATING & MELTING

Configure decoating, melting, circulation and casting as one thermal system.

The approved UBC catalogue presents a project capacity range of 1,000–25,000 kg/h. It is a configurable range, not one universal machine or guaranteed stable output.

CONNECTED THERMAL ROUTE

Start with coating burden and finish with an agreed metal specification.

  1. 01Scrap qualificationUBC, briquette or mixed aluminum; コーティング, 油, moisture and alloy profile.
  2. 02Controlled decoatingResidence time and thermal duty follow the submitted coating burden.
  3. 03Gas and heat interfaceSecondary treatment, filtration and heat recovery form one boundary.
  4. 04Side-well meltingCharge, circulation and holding are configured to the alloy target.
  5. 05Casting acceptanceIngot chemistry, dross, energy and emissions are confirmed by project evidence.
あ

Decoating basis

Document paint, 油, プラスチック, dirt, 水分, attachments and bale condition.

B

Melting basis

Confirm side-well furnace, ALUSWIRLER® circulation, holding and casting interfaces.

C

Evidence basis

Metal yield, dross, エネルギー, emissions and ingot quality require a representative trial.

Catalogue boundaryFinal temperature setpoints, スループット, environmental controls and product acceptance are issued on the signed process design and technical agreement.