Do not treat a reactor name or daily capacity as a complete project specification.
Kakana, vakarautaki, operating continuity, vakamamacataki, gas safety, product handling, lewa ni veika bula wavoliti keda, utilities and local delivery scope must be configured together.
Approved small-scale reference
YSX-F1 to YSX-F5 denote 1, 2, 3, 4 kei 5 t/day skid or modular planning references for tire, plastic or oily-sludge trials.
Material balance
Waiwai, kasi, solids and metal-bearing outputs require representative feedstock, stable-run data and an agreed sampling boundary.
Commercial boundary
Prices, operating costs, product value and return require dated quotations and local market evidence.
Source control: approved YOTO group product register. Final parameters are issued on the project-specific technical agreement.
PIROLISIS PLASITIKI NI YUSHUNXIN
Na vanua ni Pyrolysis ni palasitika benu e vakarautaki mai na kemisitiri ni kakana
Tuvatuva ni bera na veiqaravi, cakacaka ni katakata, vakasavasavataki, vakamamacataki, tail-kasi qaravi kei na maroroi ni ka e buli me vaka e dua na iyalayala ni cakacaka. Mataqali palasitika, ririko ni klorini, na wai kei na kakana tudei e vakadeitaka kevaka e dua na sala vakaturi e vakaibalebale vakatekinoloji.

VAKATAWA MATAI
Na iwasewase palasitika duadua ga e sega ni rauta me digitaki kina na kau.
Veiwaki ni polimeri
PP, PE kei na PS e rawa ni veiganiti ena loma ni dua na veiwaki vakaraitaki .; Na PVC kei na so tale na iyaya e tiko kina na chlorine e gadrevi kina na kauwai vakatabakidua ..
Na ituvaki ni yago
Iyaloyalo, palasitika kaukauwa, vuluvulu, iyaya ramusu, draki, duka kei na vakadukadukalitaki ni kaukamea.
Vakarautaka na tudei
Na kena rawati ena veisiga, veisau ni itukutuku, maroroi kei na tudei ni bera na veiqaravi.
Na inaki ni ka e buli
Vakamacalataka na iwasewase ni waiwai e nanumi ., vakayagataki ni kasi, na kena qaravi na vo kei na volivolitaki ena vanua se vakayagataki ni iyalayala.
IYALAYALA NI CAKACAKA
Lewa na iyaya ni bera ., ena gauna kei na oti na veiqaravi ni katakata.
- 01
Vakarautaka ka vakatakilakilataka
Vakadeitaka na veiwaki ni polimeri, draki, ririko ni klorini, additives kei na iyaya sega ni veiganiti.
- 02
Vakarautaka na kakana .
Veisaqasaqa, vakasavasavataki se vakamamacataki e digitaki mai na ituvaki ni curu mai kei na iwalewale ni vakani ..
- 03
Vakani kei na ivakarau ni katakata
Batch se tomani tikoga na droini e veiganiti me vakarautaka na tudei, ituvatuva ni cakacaka kei na rawaka ni vanua.
- 04
Lewa na wax kei na vakawaicalataka
Na veivakabulabulataki ni wax ena gadrevi kina e dua na ituvatuva ni dewaxing vakarautaki ni cakacaka ni bera se ena loma ni vakawaicalataka.
- 05
Taura na kasi, waiwai kei na kena vo
Vakamacalataka na vakayagataki ni kasi sega ni vakawaicalataki, maroroi ni waiwai, vakacegu ni vo kei na veiqaravi ni kasi ni iqaqalo.
VEIKA E VAKARAUTAKI & IVAKAVUVULI NI IYAYA
Semati na vanua ni iyaya yadua ki na yavu ni cakacaka ..
Na iyaloyalo oqo e vakaraitaka na lovo ., ituvatuva raraba, ituvatuva ni cakacaka kei na vanua ni output-veiqaravi vata kei na nodra itavi ni iwalewale.
VEIVAKADONUI NI VEIVAKADONUI
Vakayagataka na ivola ni veidusimaki me itekitekivu ni veivosaki ..
Sega na vua ni waiwai raraba, isau tudei, e tukuni na vua ni vakacaca se rawa-ka ni cakacaka. Oqo e vakatau ena veivakadeitaki ni kakana ., kaukauwa ni vanua kei na bula vakailavo, ituvaki ni cakacaka kei na veika e gadrevi ena lawa.
MATATA NI CAKACAKA
E dodonu me vakacavari e va na railesuva ni bera na volivolitaki ..
Matamata ni kakana
Kena tuvani, draki, kolorini, dravusa, kaukamea kei na veiqaravi tudei.
Matamata ni cakacaka
Ni bera na veiqaravi, vakani, droini katakata, vakasavasavataki, vakawaicalataki kei na kena qaravi na veika e vo.
Matamata ni vanua
Na veiqaravi, maroroi, veitaqomaki mai na bukawaqa, lewai ni vakacaca, cakacaka kei na veivakabulabulataki.
Matamata ni bisinisi
Na veika e oka kina, itavi ni vanua, vanua ni volivolitaki, iwalewale ni ciqomi kei na iyalayala ni veisoliyaki.
FAQ NI CAKACAKA
Me kua ni vakatautauvatataki na veivunikau ni bera ni vakatautauvatataki na feedstock ..
E rawa ni vakayagataki na palasitika veiwaki?
E rawa, ia na polymer namaki kei na veivakacacani ni veivakacacani e dodonu me vakamacalataki .. Chlorine-kauta kei na iyaya sega ni veiganiti e rawa ni veisautaka na iwalewale, corrosion kei na kasi-veiqaravi e gadrevi.
E vica na waiwai ena rawata na kau .?
E sega ni tabaki e dua na vuata raraba .. Na vuata e vakatau ena mata ni feedstock ibulibuli, draki, vakadukadukalitaki, ituvaki ni cakacaka, iyalayala ni vakasaqa kei na iwalewale ni veivakarautaki.
Meu digitaka na batch se tomani tikoga na cakacaka?
Na digidigi e vakatau ena vakavakarau ni feedstock kei na tudei ., ivakarau ni kau, ivakaraitaki ni cakacaka, ituvatuva ni veiqaravi, rawa ni vanua kei na ivakatagedegede ni vakatubuilavo.
E vakaceguya vakataki koya na iyaya na lawa ni vakacaca ni vanua?
Sega. Na veivakadonui ni vanua e lakovi, iyalayala ni vakacaca, na kena dikevi kei na itavi ni vanua e dodonu me vakadeitaki me tiki ni iyalayala ni cakacaka ..
TEKIVU NA VEIVAKADEITAKI NI PALASITIKA
Wasea na itukutuku, vakadukadukalitaki kei na ituvatuva ni cakacaka.
Na teveli ni cakacaka ena raica lesu na veika e yali ni bera ni veivosakitaki na ituvatuva se na isau ..
Waste-plastic pyrolysis starts with polymer identification and sorting
PE-, PP- and selected PS-rich streams can follow different thermal and condensation behavior. PVC, PET, brominated plastics, medical plastics and e-waste plastics require separate assessment.

Follow the material, vapor, liquid, gas and solid paths
The reactor is one part of the line. Commercial operability depends on how each stream is prepared, transferred, controlled and discharged.
- 01Material characterization
- 02Feed preparation and sealed transfer
- 03Controlled thermal conversion
- 04Vapor separation and staged condensation
- 05Non-condensable gas safety and reuse
- 06Solid cooling, discharge and product handling
Configuration questions that change the proposal
The following points should be resolved before selecting a capacity or preparing a commercial quotation.
Polymer composition
Confirm PE, PP, PS, PVC and PET proportions instead of describing the feed simply as mixed plastic.
Halogen control
PVC and brominated additives can change corrosion, gas-cleaning and recovered-liquid requirements.
Na kena cicivaki na wax
Plastic-derived vapors and liquids may require temperature-controlled lines, insulation and condensation staging.
Product route
Define whether recovered liquid is intended for permitted fuel use, refinery feed evaluation or another locally accepted outlet.
Make utilities and product outlets visible before investment
A useful feasibility review connects the mass balance, energy balance, operating schedule and local product route.
Operating schedule
Define planned hours per day, shutdown windows, cleaning strategy, labor model and feedstock storage capacity.
Energy integration
Evaluate non-condensable gas reuse, startup fuel, electrical loads, cooling demand and optional downstream energy use as one balance.
Quality control
Set sampling points for incoming material, condensate fractions, recovered solids, wastewater and exhaust gas.
Commercial boundary
Budgetary results remain conditional until the feedstock, vanua, product route and local compliance requirements are confirmed.
See the connected equipment boundary.
Reference visuals support early layout discussion. Final equipment, arrangement and interfaces are confirmed from the project material and site.
Vakadewataka na dina ni cakacaka ki na dua na lisi ni iyaya.
Na matrix ni veidusimaki oqo e vakaraitaka na vakasama ni vakatulewa .. iOtioti ni levu, ivakaraitaki kei na veitaratara e tiko ena vakatutu ni cakacaka sa vakadonui.
| Buloko ni ivakarau | Vakatautauvatataki ni rabailevu | Yavu ni veivakarautaki |
|---|---|---|
| Polymer preparation | Veisoliyaki, vakacacani, drying and removal of incompatible fractions | PE, PP, PS, PVC, PET and additive profile |
| Feed and conversion | Density control, sealed transfer, reactor and heating system | Bulk density, melt behavior and operating duty |
| Wax and liquid handling | Temperature-controlled vapor lines, staged condensation and storage | Wax tendency and target recovered-liquid route |
| Halogen and gas control | Material exclusion, corrosion review and gas-treatment provisions | PVC, brominated additives and local limits |
| Residue and utilities | Solid discharge, vakacegu, water and electrical interfaces | Residue classification and site conditions |
Toso ki liu na cakacaka ena gauna ga e tiko kina na ivakadinadina e gadrevi ..
Na matamata yadua e vukica na itukutuku ni kasitama ki na dua na output vakatekinoloji se vakabisinisi vakamacalataki me baleta na vakatulewa e tarava ..
Polymer screen
Quantify target polymers, PVC, PET, additives, moisture and contamination.
LakoAccepted and excluded feed specificationThermal route
Validate feeding, wax behavior, condensation and corrosion controls.
LakoMaterial-specific process routeProduct and permit
Confirm recovered-product status, outlets and local environmental boundary.
LakoCommercial and compliance evidence packConfiguration review
Freeze preparation, reactor, vakalesui mai, utilities and acceptance interfaces.
LakoProject configuration basisNa taro me wali ni bera na kena vakarautaki ..
Na isau e vakamacalataka na iyalayala ni idinia .; era sega ni sosomitaka na mata ni iyaya ni veivakatovolei se na railesuva na kena muri na lawa ni vanua ..
What determines the continuous pyrolysis equipment list?
Feedstock form, kena tuvani, draki, vakadukadukalitaki, planned operating schedule, recovered-product route, site utilities and permit requirements determine the configuration.
Can tires, plastics and oily sludge use exactly the same line?
Sega. They may share thermal-conversion principles, but their preparation, vakani, corrosion, vakamamacataki, solid handling and environmental controls differ materially.
Can recovered oil performance be guaranteed from a general material description?
Sega. Representative analysis and an agreed sampling method are required before recovered-liquid quantity, quality or downstream use can be evaluated.
What should be included in acceptance testing?
Define feedstock, run duration, mass balance, operating stability, sampled outputs, veiqaravi, safety interlocks and the applicable emissions or residue tests.
Vakamacalataka na iyaya ni bera ni o digitaka na iyaya ..
Wasea e dua na ivakamacala ni iyaya mata, Voliumu e tiko, ituvaki ni vanua kei na takete ni outputs. YUSHUNXIN ena vakayagataka na veika dina oqori me vakarautaka na iyalayala ni iwalewale veiganiti kei na veivosaki ni veivakatorocaketaki ..