Do not treat a reactor name or daily capacity as a complete project specification.
Kakana, vakarautaki, operating continuity, vakamamacataki, gas safety, product handling, lewa ni veika bula wavoliti keda, utilities and local delivery scope must be configured together.
Approved small-scale reference
YSX-F1 to YSX-F5 denote 1, 2, 3, 4 kei 5 t/day skid or modular planning references for tire, plastic or oily-sludge trials.
Material balance
Waiwai, kasi, solids and metal-bearing outputs require representative feedstock, stable-run data and an agreed sampling boundary.
Commercial boundary
Prices, operating costs, product value and return require dated quotations and local market evidence.
Source control: approved YOTO group product register. Final parameters are issued on the project-specific technical agreement.
A continuous plastic-pyrolysis project adds controlled feeding, staged condensation, gas treatment and central controls. Uptime, energy demand, output routes and price require project confirmation.
Why Choose YUSHUNXIN?
We provide not only equipment but also turnkey solutions. These encompass raw material evaluation and process design, plant layout and equipment installation, operational training and maintenance guidance, as well as long-term technical optimization and after-sales service. Whether you are a plastic recycler, solid waste management company, or energy company in the circular economy, we can tailor the most cost-effective plastic-to-fuel project solution for you.
Ikuri ni, we can provide you with numerous other waste recycling systems, vaka eco-friendly ways to turn tires into fuel, planta de pirolisis de residuos de lodo, iwali ni cakacaka ni pyrolysis ni matanisiga, and etc. If you have any other requirements, feel free to contact us immediately!
PE-, PP- and selected PS-rich streams can follow different thermal and condensation behavior. PVC, PET, brominated plastics, medical plastics and e-waste plastics require separate assessment.

Follow the material, vapor, liquid, gas and solid paths
The reactor is one part of the line. Commercial operability depends on how each stream is prepared, transferred, controlled and discharged.
- 01Material characterization
- 02Feed preparation and sealed transfer
- 03Controlled thermal conversion
- 04Vapor separation and staged condensation
- 05Non-condensable gas safety and reuse
- 06Solid cooling, discharge and product handling
Configuration questions that change the proposal
The following points should be resolved before selecting a capacity or preparing a commercial quotation.
Polymer composition
Confirm PE, PP, PS, PVC and PET proportions instead of describing the feed simply as mixed plastic.
Halogen control
PVC and brominated additives can change corrosion, gas-cleaning and recovered-liquid requirements.
Na kena cicivaki na wax
Plastic-derived vapors and liquids may require temperature-controlled lines, insulation and condensation staging.
Product route
Define whether recovered liquid is intended for permitted fuel use, refinery feed evaluation or another locally accepted outlet.
Make utilities and product outlets visible before investment
A useful feasibility review connects the mass balance, energy balance, operating schedule and local product route.
Operating schedule
Define planned hours per day, shutdown windows, cleaning strategy, labor model and feedstock storage capacity.
Energy integration
Evaluate non-condensable gas reuse, startup fuel, electrical loads, cooling demand and optional downstream energy use as one balance.
Quality control
Set sampling points for incoming material, condensate fractions, recovered solids, wastewater and exhaust gas.
Commercial boundary
Budgetary results remain conditional until the feedstock, vanua, product route and local compliance requirements are confirmed.
See the connected equipment boundary.
Reference visuals support early layout discussion. Final equipment, arrangement and interfaces are confirmed from the project material and site.
Vakadewataka na dina ni cakacaka ki na dua na lisi ni iyaya.
Na matrix ni veidusimaki oqo e vakaraitaka na vakasama ni vakatulewa .. iOtioti ni levu, ivakaraitaki kei na veitaratara e tiko ena vakatutu ni cakacaka sa vakadonui.
| Buloko ni ivakarau | Vakatautauvatataki ni rabailevu | Yavu ni veivakarautaki |
|---|---|---|
| Polymer preparation | Veisoliyaki, vakacacani, drying and removal of incompatible fractions | PE, PP, PS, PVC, PET and additive profile |
| Feed and conversion | Density control, sealed transfer, reactor and heating system | Bulk density, melt behavior and operating duty |
| Wax and liquid handling | Temperature-controlled vapor lines, staged condensation and storage | Wax tendency and target recovered-liquid route |
| Halogen and gas control | Material exclusion, corrosion review and gas-treatment provisions | PVC, brominated additives and local limits |
| Residue and utilities | Solid discharge, vakacegu, water and electrical interfaces | Residue classification and site conditions |
Toso ki liu na cakacaka ena gauna ga e tiko kina na ivakadinadina e gadrevi ..
Na matamata yadua e vukica na itukutuku ni kasitama ki na dua na output vakatekinoloji se vakabisinisi vakamacalataki me baleta na vakatulewa e tarava ..
Polymer screen
Quantify target polymers, PVC, PET, additives, moisture and contamination.
LakoAccepted and excluded feed specificationThermal route
Validate feeding, wax behavior, condensation and corrosion controls.
LakoMaterial-specific process routeProduct and permit
Confirm recovered-product status, outlets and local environmental boundary.
LakoCommercial and compliance evidence packConfiguration review
Freeze preparation, reactor, vakalesui mai, utilities and acceptance interfaces.
LakoProject configuration basisNa taro me wali ni bera na kena vakarautaki ..
Na isau e vakamacalataka na iyalayala ni idinia .; era sega ni sosomitaka na mata ni iyaya ni veivakatovolei se na railesuva na kena muri na lawa ni vanua ..
What determines the continuous pyrolysis equipment list?
Feedstock form, kena tuvani, draki, vakadukadukalitaki, planned operating schedule, recovered-product route, site utilities and permit requirements determine the configuration.
Can tires, plastics and oily sludge use exactly the same line?
Sega. They may share thermal-conversion principles, but their preparation, vakani, corrosion, vakamamacataki, solid handling and environmental controls differ materially.
Can recovered oil performance be guaranteed from a general material description?
Sega. Representative analysis and an agreed sampling method are required before recovered-liquid quantity, quality or downstream use can be evaluated.
What should be included in acceptance testing?
Define feedstock, run duration, mass balance, operating stability, sampled outputs, veiqaravi, safety interlocks and the applicable emissions or residue tests.
Vakamacalataka na iyaya ni bera ni o digitaka na iyaya ..
Wasea e dua na ivakamacala ni iyaya mata, Voliumu e tiko, ituvaki ni vanua kei na takete ni outputs. YUSHUNXIN ena vakayagataka na veika dina oqori me vakarautaka na iyalayala ni iwalewale veiganiti kei na veivosaki ni veivakatorocaketaki ..