S2: Doimiy karbonizatsiya & Char-gazni kogeneratsiya qilish yechimi
Bizning uzluksiz karbonizatsiya tizimimiz biomassa va organik chiqindilarni yuqori sifatli bioko'mirga aylantiradi va bir vaqtning o'zida energiya ishlab chiqarish uchun yonuvchi singaz hosil qiladi.. Ko'mir-gazni birgalikda ishlab chiqarish jarayoni issiqlik energiyasining to'liq aylanishiga erishadi - karbonizatsiya paytida chiqarilgan issiqlik ushlanadi va qayta ishlatiladi., umumiy energiya samaradorligini keskin oshirish.
Carbon accounting boundary: Potential storage and avoided-emission effects depend on feedstock traceability, biochar properties, end use, energy balance, the selected methodology and independent verification. No carbon-credit eligibility or emissions result is stated before project-specific review.
ESG & Uglerod aktivlarini boshqarish
Carbon-credit eligibility and any quantified climate benefit require a dated methodology, feedstock and operating evidence, product testing, eligible end use, independent validation and local project confirmation. They must not be treated as automatic project revenue.
Char-gaz kogeneratsiyasi - issiqlik aylanish mantiqi
Ko'mir-gazni kogeneratsiya qilish tizimi yopiq konturli issiqlik aylanish modelida ishlaydi:
- Birlamchi karbonizatsiya: Biomassa xom ashyosi doimiy karbonizatsiya reaktoriga kiradi, Bu erda 450-650 ° S haroratda boshqariladigan piroliz bioko'mir hosil qiladi va uchuvchi singazni chiqaradi..
- Singazning yonishi: Issiq singaz to'g'ridan-to'g'ri gaz yonish kamerasiga yuboriladi, yuqori haroratli tutun gazini ishlab chiqarish (800-1000°C) bug 'turbinasi yoki ORC qurilmasi orqali energiya ishlab chiqarish uchun.
- Chiqindilarni issiqlikni qayta tiklash: Energiya ishlab chiqarishdan chiqadigan issiqlik iqtisodchilar va issiqlik almashinuvchilari orqali olinadi, kiruvchi xom ashyoni oldindan qizdirish va biomassani quritish - quyida namlik miqdorini kamaytirish 15% reaktorga kirishdan oldin.
- Termal sirkulyatsiya: Issiq gazning bir qismi karbonizatsiya reaktorining ko'ylagiga yo'naltiriladi, ishga tushirilgandan keyin tashqi yoqilg'i kiritmasdan optimal piroliz haroratini saqlab turish.
- Energy integration basis: Available gas and heat depend on feedstock moisture and composition, operating stability, gas cleaning, auxiliary loads and the selected generator or steam system. Self-sufficiency and export require a verified project energy balance and grid or receiving-load review.
Connect biochar production with usable heat, steam or power.
A continuous carbonization project can be evaluated as a carbon-product system and an energy system. The correct route depends on biomass consistency, target carbon specification, heat demand, operating scale and the customer's ability to use energy continuously.

Separate three commercial routes before selecting equipment
Metallurgical biochar, carbon-project biochar and hard-carbon precursor projects have different customers, testing methods and acceptance cycles.
Metallurgical biochar
Prioritize fixed carbon, ash, sulfur, phosphorus, strength, sizing and delivered cost for the downstream furnace.
Carbon-project biochar
Prioritize feedstock traceability, stable carbon, emissions data, operating records and the applicable carbon methodology.
Activated-carbon feedstock
Prioritize precursor uniformity, volatile matter, ash and the subsequent activation route.
Hard-carbon precursor
Treat the project as a development program: precursor purification, controlled pre-carbonization and sample validation come before an industrial-line promise.
Use the recovered energy where it creates the clearest operating value
Direct steam supply can be more practical when a stable industrial steam user is nearby; power generation becomes a separate engineering package with stricter gas-cleaning and load-matching requirements.
- 01Dry and size the biomass
- 02Continuous oxygen-limited carbonization
- 03Separate dust and condensable fractions
- 04Clean and condition process gas
- 05Return heat to the carbonizer first
- 06Evaluate steam, power or combined heat-and-power use
What must be verified before an energy claim is used
Do not calculate an energy return from nameplate throughput alone.
Feedstock test
Namlik, ash, bulk density, particle size and seasonal variation determine drying and feeding requirements.
Carbon target
The carbon specification defines residence time, thermal profile, cooling and product handling.
Gas characterization
Gas quantity, heating value, tar, dust and moisture determine whether an engine, boiler or thermal oxidizer route is practical.
Demand match
Confirm the user's hourly steam or electrical load, pressure or voltage conditions, annual schedule and backup-energy requirement.
See the connected equipment boundary.
Reference visuals support early layout discussion. Final equipment, arrangement and interfaces are confirmed from the project material and site.
Translate project facts into an equipment list.
This reference matrix shows the decision logic. Final quantities, models and interfaces belong in the approved project proposal.
| System block | Typical scope | Configuration basis |
|---|---|---|
| Biomass preparation | Drying, size control, storage and metered feeding | Namlik, density and seasonal consistency |
| Karbonizatsiya | Continuous reactor, atmosphere control and thermal profile | Target carbon specification |
| Product handling | Sealed cooling, sizing, storage and sample points | Oxidation, dust and product quality |
| Gas and condensables | Dust separation, condensation and gas conditioning | Tar, moisture and intended heat route |
| Energy integration | Internal heat return, optional boiler, generator or user interface | Verified energy balance and demand match |
Advance the project only when the required evidence is available.
Each gate turns customer information into a defined technical or commercial output for the next decision.
Biomass and product
Confirm biomass consistency and the actual carbon buyer specification.
OutputQualified material-to-product basisTermal yo'l
Define drying, sizing, carbonization, cooling and quality sampling.
OutputConnected carbon-production flowEnergy demand
Match process heat with a verified nearby steam, heat or power demand.
OutputPreliminary energy-use boundaryEvidence and acceptance
Agree operating records, tests, emissions and any methodology review.
OutputProject acceptance and evidence planQuestions to resolve before configuration.
Answers define the engineering boundary; they do not replace representative material testing or local compliance review.
What changes the continuous carbonization configuration?
Biomass type, namlik, particle size, ash, target carbon specification, operating hours, heat-use route and environmental requirements change the equipment boundary.
Should steam or power generation be selected first?
The receiving energy load should be studied first. A stable nearby steam demand can favor direct steam use, while power generation requires a separate gas-cleaning, generator and electrical-integration package.
Can carbon-credit revenue be treated as guaranteed project income?
No. Eligibility depends on feedstock traceability, operating evidence, methodology, verification and local project conditions.
How is a hard-carbon precursor project different?
It requires precursor purification, controlled thermal development, powder processing and independent material or electrochemical validation beyond ordinary biochar production.
Define the material before selecting the equipment.
Share a representative material description, available volume, site status and target outputs. YUSHUNXIN will use those facts to prepare the relevant process boundary and configuration discussion.
Continuous carbonization and energy integration
Select the carbonization class from prepared volumetric feed, bulk density, namlik, target carbon and energy-use boundary.
Kiruvchi material
Sawdust, rice husk, straw, shell or other biomass; particle size, full/air-dry moisture, ash and bulk density.
Kutilayotgan natijalar
Biochar and project-specific gas/heat streams; carbon properties require representative laboratory and stable-run data.
Loyiha interfeyslari
Drying/preparation, sealed feeding, carbonization, gas treatment/combustion, cooling, storage, fire control and optional heat recovery.
Faqat tanlangan jarayon chegarasiga mos keladigan qatordan foydalaning.
| Katalog ma'lumotnomasi | Imkoniyat | Quvvat | Jismoniy konvert | Kiritilgan chegara |
|---|---|---|---|---|
| SXTD820Continuous carbonization | 1–2 m³/h | 95 kVt | 600 m² catalogue land reference | Prepared biomass continuous carbonization line |
| SXTD1200Continuous carbonization | 3–5 m³/h | 110 kVt | 650 m² catalogue land reference | Prepared biomass continuous carbonization line |
| SXTD1500Continuous carbonization | 5–8 m³/h | 153 kVt | 800 m² catalogue land reference | Prepared biomass continuous carbonization line |
| SXTD1800Continuous carbonization | 8–10 m³/h | 178 kVt | 800 m² catalogue land reference | Prepared biomass continuous carbonization line |
| SXTD2000 - 10–14 classContinuous carbonization | 10–14 m³/h | 190 kVt | 850 m² catalogue land reference | Catalogue prints SXTD2000 for this class |
| SXTD2000 - 14–17 classContinuous carbonization | 14–17 m³/h | 220 kVt | 850 m² catalogue land reference | Catalogue repeats SXTD2000; final model code requires written confirmation |
Konfiguratsiya qoidasi: katalog sig'imi rejalashtirish ma'lumotnomasidir. Barqaror o'tkazish qobiliyati, o'rnatilgan/ishlash quvvati, iz, tiklanish, poklik, emissiya va kommunal talablar tasdiqlangan uskunalar ro'yxatini talab qiladi, vakillik materiali va yozma qabul qilish shartlari.
Konfiguratsiya va kotirovkadan oldin talab qilinadigan ma'lumotlar
- Vakillik materiallari fotosuratlari, spetsifikatsiyalar va mavjud namuna.
- Kerakli quvvat va smenada soat, kunlik va ish kunlaridagi smenalar.
- Maqsadli natijalar, namuna olish usuli va quyi oqim qabul qiluvchiga talablar.
- Sayt mamlakati, mavjud quvvat, yoqilg'i, suv, siqilgan havo va qurilish chegaralari.
- Mahalliy atrof-muhit, olov, saqlash va mehnatni muhofaza qilish talablari.
- Talab qilingan yetkazib berish chegarasi: uskunalar, tartib, o'rnatish, ishga tushirish va o'qitish.