T2: Continuous Carbonization & Char-Gas Co-generation Solution
Our continuous carbonization system converts biomass and organic waste into high-quality biochar while simultaneously generating combustible syngas for power co-generation. The char-gas co-generation process achieves complete thermal energy circulation — the heat released during carbonization is captured and reused, dramatically improving overall energy efficiency.
Carbon accounting boundary: Potential storage and avoided-emission effects depend on feedstock traceability, biochar properties, end use, balance energético, the selected methodology and independent verification. No carbon-credit eligibility or emissions result is stated before project-specific review.
ESG & Carbon Asset Management
Carbon-credit eligibility and any quantified climate benefit require a dated methodology, feedstock and operating evidence, product testing, eligible end use, independent validation and local project confirmation. They must not be treated as automatic project revenue.
Char-Gas Co-generation — Thermal Circulation Logic
The char-gas co-generation system operates on a closed-loop thermal circulation model:
- Primary Carbonization: Biomass feedstock enters the continuous carbonization reactor, where controlled pyrolysis at 450-650°C produces biochar and releases volatile syngas.
- Syngas Combustion: The hot syngas is directly fed into a gas combustion chamber, generating high-temperature flue gas (800-1000°C) for power generation via a steam turbine or ORC unit.
- Waste Heat Recovery: Exhaust heat from power generation is captured through economizers and heat exchangers, preheating incoming feedstock and drying biomass — reducing moisture content below 15% before entering the reactor.
- Thermal Recirculation: A portion of the hot flue gas is redirected to the carbonization reactor jacket, maintaining optimal pyrolysis temperature without external fuel input after startup.
- Energy integration basis: Available gas and heat depend on feedstock moisture and composition, estabilidad operativa, gas cleaning, auxiliary loads and the selected generator or steam system. Self-sufficiency and export require a verified project energy balance and grid or receiving-load review.
Connect biochar production with usable heat, steam or power.
A continuous carbonization project can be evaluated as a carbon-product system and an energy system. The correct route depends on biomass consistency, target carbon specification, heat demand, operating scale and the customer's ability to use energy continuously.

Separate three commercial routes before selecting equipment
Metallurgical biochar, carbon-project biochar and hard-carbon precursor projects have different customers, testing methods and acceptance cycles.
Metallurgical biochar
Prioritize fixed carbon, ceniza, azufre, phosphorus, strength, sizing and delivered cost for the downstream furnace.
Carbon-project biochar
Prioritize feedstock traceability, stable carbon, emissions data, operating records and the applicable carbon methodology.
Activated-carbon feedstock
Prioritize precursor uniformity, volatile matter, ash and the subsequent activation route.
Hard-carbon precursor
Treat the project as a development program: precursor purification, controlled pre-carbonization and sample validation come before an industrial-line promise.
Use the recovered energy where it creates the clearest operating value
Direct steam supply can be more practical when a stable industrial steam user is nearby; power generation becomes a separate engineering package with stricter gas-cleaning and load-matching requirements.
- 01Dry and size the biomass
- 02Continuous oxygen-limited carbonization
- 03Separate dust and condensable fractions
- 04Clean and condition process gas
- 05Return heat to the carbonizer first
- 06Evaluate steam, power or combined heat-and-power use
What must be verified before an energy claim is used
Do not calculate an energy return from nameplate throughput alone.
Feedstock test
Humedad, ceniza, densidad aparente, particle size and seasonal variation determine drying and feeding requirements.
Carbon target
The carbon specification defines residence time, thermal profile, cooling and product handling.
Gas characterization
Gas quantity, heating value, tar, dust and moisture determine whether an engine, boiler or thermal oxidizer route is practical.
Demand match
Confirm the user's hourly steam or electrical load, pressure or voltage conditions, annual schedule and backup-energy requirement.
Ver el límite del equipo conectado.
Las imágenes de referencia apoyan la discusión inicial sobre el diseño.. Equipo final, La disposición y las interfaces se confirman a partir del material y el sitio del proyecto..
Traducir los datos del proyecto en una lista de equipos..
Esta matriz de referencia muestra la lógica de decisión.. Cantidades finales, Los modelos e interfaces pertenecen a la propuesta de proyecto aprobada..
| Bloque del sistema | Alcance típico | Base de configuración |
|---|---|---|
| Biomass preparation | El secado, size control, storage and metered feeding | Humedad, density and seasonal consistency |
| Carbonización | reactor continuo, atmosphere control and thermal profile | Target carbon specification |
| Product handling | Refrigeración sellada, sizing, storage and sample points | Oxidation, dust and product quality |
| Gas and condensables | Dust separation, condensation and gas conditioning | Tar, moisture and intended heat route |
| Integración energética | Internal heat return, optional boiler, generator or user interface | Verified energy balance and demand match |
Avanzar en el proyecto sólo cuando la evidencia requerida esté disponible..
Cada puerta convierte la información del cliente en un resultado técnico o comercial definido para la siguiente decisión..
Biomass and product
Confirm biomass consistency and the actual carbon buyer specification.
ProducciónQualified material-to-product basisThermal route
Define drying, sizing, carbonization, cooling and quality sampling.
ProducciónConnected carbon-production flowEnergy demand
Match process heat with a verified nearby steam, heat or power demand.
ProducciónPreliminary energy-use boundaryEvidence and acceptance
Agree operating records, tests, emissions and any methodology review.
ProducciónProject acceptance and evidence planPreguntas a resolver antes de la configuración.
Las respuestas definen los límites de la ingeniería; No reemplazan las pruebas de materiales representativas ni la revisión de cumplimiento local..
What changes the continuous carbonization configuration?
Biomass type, humedad, particle size, ceniza, target carbon specification, operating hours, heat-use route and environmental requirements change the equipment boundary.
Should steam or power generation be selected first?
The receiving energy load should be studied first. A stable nearby steam demand can favor direct steam use, while power generation requires a separate gas-cleaning, generator and electrical-integration package.
Can carbon-credit revenue be treated as guaranteed project income?
No. Eligibility depends on feedstock traceability, operating evidence, methodology, verification and local project conditions.
How is a hard-carbon precursor project different?
It requires precursor purification, controlled thermal development, powder processing and independent material or electrochemical validation beyond ordinary biochar production.
Definir el material antes de seleccionar el equipo..
Compartir una descripción de material representativa, volumen disponible, estado del sitio y resultados objetivo. YUSHUNXIN utilizará esos hechos para preparar la discusión de configuración y límites del proceso relevante..
Continuous carbonization and energy integration
Select the carbonization class from prepared volumetric feed, densidad aparente, humedad, target carbon and energy-use boundary.
material entrante
Sawdust, rice husk, straw, shell or other biomass; particle size, full/air-dry moisture, ash and bulk density.
Resultados esperados
Biochar and project-specific gas/heat streams; carbon properties require representative laboratory and stable-run data.
Interfaces de proyecto
Drying/preparation, alimentación sellada, carbonization, gas treatment/combustion, enfriamiento, almacenamiento, fire control and optional heat recovery.
Utilice sólo la fila que coincida con el límite del proceso seleccionado.
| Referencia del catálogo | Capacidad | Fuerza | Sobre físico | Límite incluido |
|---|---|---|---|---|
| SXTD820Carbonización continua | 1–2m³/h | 95 kilovatios | 600 m² catálogo suelo referencia | Línea de carbonización continua de biomasa preparada |
| SXTD1200Carbonización continua | 3–5m³/h | 110 kilovatios | 650 m² catálogo suelo referencia | Línea de carbonización continua de biomasa preparada |
| SXTD1500Carbonización continua | 5–8 m³/h | 153 kilovatios | 800 m² catálogo suelo referencia | Línea de carbonización continua de biomasa preparada |
| SXTD1800Carbonización continua | 8–10 m³/h | 178 kilovatios | 800 m² catálogo suelo referencia | Línea de carbonización continua de biomasa preparada |
| SXTD2000 - 10–14 claseCarbonización continua | 10–14 m³/h | 190 kilovatios | 850 m² catálogo suelo referencia | Impresiones del catálogo SXTD2000 para esta clase. |
| SXTD2000 - 14–17 claseCarbonización continua | 14–17 m³/h | 220 kilovatios | 850 m² catálogo suelo referencia | Catálogo repite SXTD2000; El código del modelo final requiere confirmación por escrito. |
Regla de configuración: La capacidad del catálogo es una referencia de planificación.. Rendimiento estable, potencia instalada/operativa, huella, recuperación, pureza, Las emisiones y la demanda de servicios públicos requieren la lista de equipos aprobados., material representativo y condiciones de aceptación por escrito.
Información requerida antes de la configuración y cotización.
- Fotos de material representativo., especificaciones y muestra disponible.
- Capacidad requerida más horas por turno, turnos por día y días de funcionamiento.
- Productos objetivo, Método de muestreo y requisitos del receptor aguas abajo..
- País del sitio, potencia disponible, combustible, agua, Aire comprimido y límites de construcción..
- Ambiental local, fuego, Requisitos de almacenamiento y seguridad laboral..
- Límite de entrega solicitado: equipo, disposición, instalación, puesta en marcha y formación.