S2: Continuous Carbonization & Char-Gas Co-generation Solution
Our continuous carbonization system converts biomass and organic waste into high-quality biochar while simultaneously generating combustible syngas for power co-generation. The char-gas co-generation process achieves complete thermal energy circulation — the heat released during carbonization is captured and reused, dramatically improving overall energy efficiency.
Carbon accounting boundary: Potential storage and avoided-emission effects depend on feedstock traceability, biochar properties, end use, bilancio energetico, the selected methodology and independent verification. No carbon-credit eligibility or emissions result is stated before project-specific review.
ESG & Carbon Asset Management
Carbon-credit eligibility and any quantified climate benefit require a dated methodology, feedstock and operating evidence, product testing, eligible end use, independent validation and local project confirmation. They must not be treated as automatic project revenue.
Char-Gas Co-generation — Thermal Circulation Logic
The char-gas co-generation system operates on a closed-loop thermal circulation model:
- Primary Carbonization: Biomass feedstock enters the continuous carbonization reactor, where controlled pyrolysis at 450-650°C produces biochar and releases volatile syngas.
- Syngas Combustion: The hot syngas is directly fed into a gas combustion chamber, generating high-temperature flue gas (800-1000°C) for power generation via a steam turbine or ORC unit.
- Waste Heat Recovery: Exhaust heat from power generation is captured through economizers and heat exchangers, preheating incoming feedstock and drying biomass — reducing moisture content below 15% before entering the reactor.
- Thermal Recirculation: A portion of the hot flue gas is redirected to the carbonization reactor jacket, maintaining optimal pyrolysis temperature without external fuel input after startup.
- Energy integration basis: Available gas and heat depend on feedstock moisture and composition, stabilità operativa, pulizia del gas, auxiliary loads and the selected generator or steam system. Self-sufficiency and export require a verified project energy balance and grid or receiving-load review.
Connect biochar production with usable heat, steam or power.
A continuous carbonization project can be evaluated as a carbon-product system and an energy system. The correct route depends on biomass consistency, target carbon specification, heat demand, operating scale and the customer's ability to use energy continuously.

Separate three commercial routes before selecting equipment
Biochar metallurgico, carbon-project biochar and hard-carbon precursor projects have different customers, testing methods and acceptance cycles.
Biochar metallurgico
Prioritize fixed carbon, cenere, zolfo, fosforo, forza, sizing and delivered cost for the downstream furnace.
Biochar del progetto Carbon
Prioritize feedstock traceability, carbonio stabile, emissions data, operating records and the applicable carbon methodology.
Activated-carbon feedstock
Prioritize precursor uniformity, volatile matter, ash and the subsequent activation route.
Precursore del carbonio duro
Treat the project as a development program: precursor purification, controlled pre-carbonization and sample validation come before an industrial-line promise.
Use the recovered energy where it creates the clearest operating value
Direct steam supply can be more practical when a stable industrial steam user is nearby; power generation becomes a separate engineering package with stricter gas-cleaning and load-matching requirements.
- 01Dry and size the biomass
- 02Continuous oxygen-limited carbonization
- 03Separate dust and condensable fractions
- 04Clean and condition process gas
- 05Return heat to the carbonizer first
- 06Evaluate steam, power or combined heat-and-power use
What must be verified before an energy claim is used
Do not calculate an energy return from nameplate throughput alone.
Feedstock test
Umidità, cenere, bulk density, particle size and seasonal variation determine drying and feeding requirements.
Carbon target
The carbon specification defines residence time, thermal profile, cooling and product handling.
Gas characterization
Gas quantity, heating value, tar, dust and moisture determine whether an engine, boiler or thermal oxidizer route is practical.
Demand match
Confirm the user's hourly steam or electrical load, pressure or voltage conditions, annual schedule and backup-energy requirement.
Vedere il limite dell'apparecchiatura collegata.
Gli elementi visivi di riferimento supportano la discussione iniziale sul layout. Attrezzatura finale, la disposizione e le interfacce sono confermate dal materiale e dal sito del progetto.
Traduci i dati del progetto in un elenco di attrezzature.
Questa matrice di riferimento mostra la logica della decisione. Quantità finali, modelli e interfacce fanno parte della proposta progettuale approvata.
| Blocco del sistema | Ambito tipico | Base di configurazione |
|---|---|---|
| Biomass preparation | Essiccazione, size control, storage and metered feeding | Umidità, density and seasonal consistency |
| Carbonizzazione | Reattore continuo, atmosphere control and thermal profile | Target carbon specification |
| Product handling | Sealed cooling, sizing, storage and sample points | Oxidation, dust and product quality |
| Gas and condensables | Dust separation, condensation and gas conditioning | Tar, moisture and intended heat route |
| Integrazione energetica | Internal heat return, optional boiler, generator or user interface | Verified energy balance and demand match |
Far avanzare il progetto solo quando sono disponibili le prove richieste.
Ogni gate trasforma le informazioni sul cliente in un output tecnico o commerciale definito per la decisione successiva.
Biomass and product
Confirm biomass consistency and the actual carbon buyer specification.
ProduzioneQualified material-to-product basisPercorso termale
Define drying, sizing, carbonization, cooling and quality sampling.
ProduzioneConnected carbon-production flowEnergy demand
Match process heat with a verified nearby steam, heat or power demand.
ProduzionePreliminary energy-use boundaryEvidence and acceptance
Agree operating records, tests, emissions and any methodology review.
ProduzioneProject acceptance and evidence planDomande da risolvere prima della configurazione.
Le risposte definiscono il confine ingegneristico; non sostituiscono i test rappresentativi dei materiali o la revisione della conformità locale.
What changes the continuous carbonization configuration?
Biomass type, umidità, particle size, cenere, target carbon specification, orari di funzionamento, heat-use route and environmental requirements change the equipment boundary.
Should steam or power generation be selected first?
The receiving energy load should be studied first. A stable nearby steam demand can favor direct steam use, while power generation requires a separate gas-cleaning, generator and electrical-integration package.
Can carbon-credit revenue be treated as guaranteed project income?
NO. Eligibility depends on feedstock traceability, operating evidence, methodology, verification and local project conditions.
How is a hard-carbon precursor project different?
It requires precursor purification, controlled thermal development, powder processing and independent material or electrochemical validation beyond ordinary biochar production.
Definire il materiale prima di selezionare l'attrezzatura.
Condividi una descrizione rappresentativa del materiale, volume disponibile, stato del sito e risultati target. YUSHUNXIN utilizzerà questi fatti per preparare il relativo confine del processo e la discussione sulla configurazione.
Continuous carbonization and energy integration
Select the carbonization class from prepared volumetric feed, bulk density, umidità, target carbon and energy-use boundary.
Materiale in arrivo
Sawdust, rice husk, straw, shell or other biomass; particle size, full/air-dry moisture, ash and bulk density.
Risultati attesi
Biochar and project-specific gas/heat streams; carbon properties require representative laboratory and stable-run data.
Interfacce di progetto
Drying/preparation, sealed feeding, carbonization, gas treatment/combustion, raffreddamento, magazzinaggio, fire control and optional heat recovery.
Utilizza solo la riga corrispondente al limite del processo selezionato.
| Riferimento al catalogo | Capacità | Energia | Involucro fisico | Confine incluso |
|---|---|---|---|---|
| SXTD820Continuous carbonization | 1–2 m³/h | 95 kW | 600 m² catalogue land reference | Prepared biomass continuous carbonization line |
| SXTD1200Continuous carbonization | 3–5 m³/h | 110 kW | 650 m² catalogue land reference | Prepared biomass continuous carbonization line |
| SXTD1500Continuous carbonization | 5–8 m³/h | 153 kW | 800 m² catalogue land reference | Prepared biomass continuous carbonization line |
| SXTD1800Continuous carbonization | 8–10 m³/h | 178 kW | 800 m² catalogue land reference | Prepared biomass continuous carbonization line |
| SXTD2000 - 10–14 classContinuous carbonization | 10–14 m³/h | 190 kW | 850 m² catalogue land reference | Catalogue prints SXTD2000 for this class |
| SXTD2000 - 14–17 classContinuous carbonization | 14–17 m³/h | 220 kW | 850 m² catalogue land reference | Catalogue repeats SXTD2000; final model code requires written confirmation |
Regola di configurazione: la capacità del catalogo è un riferimento di pianificazione. Produttività stabile, potenza installata/operativa, orma, recupero, purezza, le emissioni e la domanda dei servizi pubblici richiedono l'elenco delle apparecchiature approvate, materiale rappresentativo e condizioni di accettazione scritte.
Informazioni richieste prima della configurazione e del preventivo
- Foto materiali rappresentative, specifiche e campione disponibile.
- Capacità richiesta più ore per turno, turni giornalieri e giorni lavorativi.
- Obiettivi di output, metodo di campionamento e requisiti del ricevitore a valle.
- Paese del sito, potenza disponibile, carburante, acqua, aria compressa e limiti dell'edificio.
- Ambientale locale, fuoco, requisiti di conservazione e sicurezza sul lavoro.
- Limite di consegna richiesto: attrezzatura, disposizione, installazione, messa in servizio e formazione.