S2: Continuous Carbonization & Char-Gas Co-generation Solution
Our continuous carbonization system converts biomass and organic waste into high-quality biochar while simultaneously generating combustible syngas for power co-generation. The char-gas co-generation process achieves complete thermal energy circulation — the heat released during carbonization is captured and reused, dramatically improving overall energy efficiency.
Carbon accounting boundary: Potential storage and avoided-emission effects depend on feedstock traceability, biochar properties, end use, energijsko bilanco, the selected methodology and independent verification. No carbon-credit eligibility or emissions result is stated before project-specific review.
ESG & Carbon Asset Management
Carbon-credit eligibility and any quantified climate benefit require a dated methodology, feedstock and operating evidence, product testing, eligible end use, independent validation and local project confirmation. They must not be treated as automatic project revenue.
Char-Gas Co-generation — Thermal Circulation Logic
The char-gas co-generation system operates on a closed-loop thermal circulation model:
- Primary Carbonization: Biomass feedstock enters the continuous carbonization reactor, where controlled pyrolysis at 450-650°C produces biochar and releases volatile syngas.
- Syngas Combustion: The hot syngas is directly fed into a gas combustion chamber, generating high-temperature flue gas (800-1000°C) for power generation via a steam turbine or ORC unit.
- Waste Heat Recovery: Exhaust heat from power generation is captured through economizers and heat exchangers, preheating incoming feedstock and drying biomass — reducing moisture content below 15% before entering the reactor.
- Thermal Recirculation: A portion of the hot flue gas is redirected to the carbonization reactor jacket, maintaining optimal pyrolysis temperature without external fuel input after startup.
- Energy integration basis: Available gas and heat depend on feedstock moisture and composition, stabilnost delovanja, gas cleaning, auxiliary loads and the selected generator or steam system. Self-sufficiency and export require a verified project energy balance and grid or receiving-load review.
Connect biochar production with usable heat, steam or power.
A continuous carbonization project can be evaluated as a carbon-product system and an energy system. The correct route depends on biomass consistency, target carbon specification, heat demand, operating scale and the customer's ability to use energy continuously.

Separate three commercial routes before selecting equipment
Metallurgical biochar, carbon-project biochar and hard-carbon precursor projects have different customers, testing methods and acceptance cycles.
Metallurgical biochar
Prioritize fixed carbon, ash, žveplo, phosphorus, strength, sizing and delivered cost for the downstream furnace.
Carbon-project biochar
Prioritize feedstock traceability, stable carbon, emissions data, operating records and the applicable carbon methodology.
Activated-carbon feedstock
Prioritize precursor uniformity, volatile matter, ash and the subsequent activation route.
Hard-carbon precursor
Treat the project as a development program: precursor purification, controlled pre-carbonization and sample validation come before an industrial-line promise.
Use the recovered energy where it creates the clearest operating value
Direct steam supply can be more practical when a stable industrial steam user is nearby; power generation becomes a separate engineering package with stricter gas-cleaning and load-matching requirements.
- 01Dry and size the biomass
- 02Continuous oxygen-limited carbonization
- 03Separate dust and condensable fractions
- 04Clean and condition process gas
- 05Return heat to the carbonizer first
- 06Evaluate steam, power or combined heat-and-power use
What must be verified before an energy claim is used
Do not calculate an energy return from nameplate throughput alone.
Feedstock test
Vlaga, ash, bulk density, particle size and seasonal variation determine drying and feeding requirements.
Carbon target
The carbon specification defines residence time, thermal profile, cooling and product handling.
Gas characterization
Gas quantity, heating value, tar, dust and moisture determine whether an engine, boiler or thermal oxidizer route is practical.
Demand match
Confirm the user's hourly steam or electrical load, pressure or voltage conditions, annual schedule and backup-energy requirement.
Oglejte si mejo povezane opreme.
Referenčni vizualni elementi podpirajo zgodnjo razpravo o postavitvi. Končna oprema, ureditev in vmesniki so potrjeni iz projektnega gradiva in lokacije.
Prenesite projektna dejstva v seznam opreme.
Ta referenčna matrika prikazuje logiko odločanja. Končne količine, modeli in vmesniki sodijo v odobren projektni predlog.
| Sistemski blok | Tipičen obseg | Osnova konfiguracije |
|---|---|---|
| Biomass preparation | Drying, size control, storage and metered feeding | Vlaga, density and seasonal consistency |
| Karbonizacija | Continuous reactor, atmosphere control and thermal profile | Target carbon specification |
| Product handling | Zaprto hlajenje, sizing, storage and sample points | Oxidation, dust and product quality |
| Gas and condensables | Dust separation, condensation and gas conditioning | Tar, moisture and intended heat route |
| Energetska integracija | Internal heat return, optional boiler, generator or user interface | Verified energy balance and demand match |
Napredujte s projektom le, ko so na voljo zahtevana dokazila.
Vsaka vrata spremenijo informacije o strankah v določen tehnični ali komercialni rezultat za naslednjo odločitev.
Biomass and product
Confirm biomass consistency and the actual carbon buyer specification.
IzhodQualified material-to-product basisThermal route
Define drying, sizing, carbonization, cooling and quality sampling.
IzhodConnected carbon-production flowEnergy demand
Match process heat with a verified nearby steam, heat or power demand.
IzhodPreliminary energy-use boundaryEvidence and acceptance
Agree operating records, tests, emissions and any methodology review.
IzhodProject acceptance and evidence planVprašanja, ki jih je treba rešiti pred konfiguracijo.
Odgovori določajo inženirsko mejo; ne nadomeščajo reprezentativnega testiranja materiala ali lokalnega pregleda skladnosti.
What changes the continuous carbonization configuration?
Biomass type, vlage, particle size, ash, target carbon specification, operating hours, heat-use route and environmental requirements change the equipment boundary.
Should steam or power generation be selected first?
The receiving energy load should be studied first. A stable nearby steam demand can favor direct steam use, while power generation requires a separate gas-cleaning, generator and electrical-integration package.
Can carbon-credit revenue be treated as guaranteed project income?
št. Eligibility depends on feedstock traceability, operating evidence, methodology, verification and local project conditions.
How is a hard-carbon precursor project different?
It requires precursor purification, controlled thermal development, powder processing and independent material or electrochemical validation beyond ordinary biochar production.
Pred izbiro opreme določite material.
Delite reprezentativen opis gradiva, razpoložljiva prostornina, status mesta in ciljne rezultate. YUSHUNXIN bo ta dejstva uporabil za pripravo ustrezne meje procesa in razprave o konfiguraciji.
Continuous carbonization and energy integration
Select the carbonization class from prepared volumetric feed, bulk density, vlage, target carbon and energy-use boundary.
Vhodni material
Sawdust, rice husk, straw, shell or other biomass; particle size, full/air-dry moisture, ash and bulk density.
Pričakovani rezultati
Biochar and project-specific gas/heat streams; carbon properties require representative laboratory and stable-run data.
Projektni vmesniki
Drying/preparation, zaprto hranjenje, carbonization, gas treatment/combustion, cooling, shranjevanje, fire control and optional heat recovery.
Uporabite samo tisto vrstico, ki ustreza izbrani meji procesa.
| Referenca kataloga | Zmogljivost | Moč | Fizična ovojnica | Vključena meja |
|---|---|---|---|---|
| SXTD820Kontinuirana karbonizacija | 1–2 m³/h | 95 kW | 600 m² kataloška referenca zemljišča | Pripravljena linija za kontinuirano karbonizacijo biomase |
| SXTD1200Kontinuirana karbonizacija | 3–5 m³/h | 110 kW | 650 m² kataloška referenca zemljišča | Pripravljena linija za kontinuirano karbonizacijo biomase |
| SXTD1500Kontinuirana karbonizacija | 5–8 m³/h | 153 kW | 800 m² kataloška referenca zemljišča | Pripravljena linija za kontinuirano karbonizacijo biomase |
| SXTD1800Kontinuirana karbonizacija | 8–10 m³/h | 178 kW | 800 m² kataloška referenca zemljišča | Pripravljena linija za kontinuirano karbonizacijo biomase |
| SXTD2000 - 10–14 razredKontinuirana karbonizacija | 10–14 m³/h | 190 kW | 850 m² kataloška referenca zemljišča | Katalog natisne SXTD2000 za ta razred |
| SXTD2000 - 14–17 razredKontinuirana karbonizacija | 14–17 m³/h | 220 kW | 850 m² kataloška referenca zemljišča | Katalog ponavlja SXTD2000; koda končnega modela zahteva pisno potrditev |
Konfiguracijsko pravilo: kataloška zmogljivost je referenca za načrtovanje. Stabilen pretok, instalirana/obratovalna moč, odtis, okrevanje, čistost, emisije in komunalno povpraševanje zahtevajo odobren seznam opreme, reprezentativno gradivo in pisni sprejemni pogoji.
Potrebne informacije pred konfiguracijo in ponudbo
- Reprezentativne materialne fotografije, specifikacije in razpoložljiv vzorec.
- Zahtevana zmogljivost plus ure na izmeno, izmene na dan in delovne dni.
- Ciljni rezultati, metoda vzorčenja in zahteve za spodnji sprejemnik.
- Država spletnega mesta, razpoložljiva moč, goriva, vodo, stisnjen zrak in gradbene omejitve.
- Lokalno okolje, ogenj, zahteve glede shranjevanja in varnosti pri delu.
- Zahtevana meja dostave: opremo, postavitev, namestitev, zagon in usposabljanje.