S1: Te faaneheneheraa i te mau fare hamaniraa tauihaa & Te faaherehereraa i te ito

Ta tatou UBC (Inu faaohipahia) E amui oioihia te faanahoraa no te faaneheneheraa i te mau oumu aluminium, Te hamaniraa i te hoê ohipa taa ê. Na roto i te iritiraa i te mau tapo'i e te mau mea ino hou a rewa ai, E faarahi te faanahoraa i te faito o te faaho'i-faahou-raa mai i te metala ma te faaiti i te faaohiparaa i te ito na roto i te 15–30%. Eita te taairaa no te faanehenehe e te faanehenehe e faaore i te faaohiparaa piti, e faaiti te reira i te mau ereraa, e te haapapûraa i te hoê faahopearaa aluminium maitai a'e no te mau faaohiparaa i raro.

A ani i te hi'opo'araa ROI

Te aravihi no te Thermal

Te faaiti nei te UBC i te faaohiparaa i te mǎhu i nia i te oumu re'are'a 15-30%. E amui oioihia te faanahoraa no te faaneheneheraa i te faanahoraa no te faaho'i-faahou-raa mai i te veavea, Te hamaniraa i te hoê huriraa thermal. E faahanahana te mau mǎhu veavea no roto mai i te oumu i te piha o te delacquering, i te taime a mâ ai te, I te anuvera teitei, e tomo te UBC i roto i te oumu, ma te faaiti i te ito e titauhia no te re'are'a. E faaore teie taairaa veavea i te hinaaro i te mau mauhaa tahu tauturu i roto i te tuhaa o te delacquering e e faatitiaifaro i te rahiraa o te mǎhu natura i roto i te mekameka o te ohipa.

Tikiake i te parau faaite no te faaoraraa i te ito

YUSHUNXIN ALUMINUM RECOVERY

Build the decoating line around the incoming aluminum scrap.

A connected project can combine size reduction, ferrous and non-ferrous separation, controlled thermal decoating, off-gas management, melting and ingot handling. The final scope depends on the coating system, scrap density, contamination and downstream metal specification.

Reference layout for an aluminum can shredding and thermal decoating line
01 / PROCESS ROUTE

From incoming UBC bales to a controlled furnace feed

The line should be configured as a material-to-output system rather than a standalone furnace.

  1. 01Receiving and bale opening
  2. 02Shredding and size control
  3. 03Magnetic and eddy-current separation
  4. 04Controlled thermal decoating
  5. 05Gas treatment and heat integration
  6. 06Optional melting, casting and palletizing
02 / CONFIGURATION BASIS

What changes the equipment list

A reliable proposal starts with the actual scrap profile and the agreed delivery boundary.

Feedstock form

Loose cans, compacted bales, mixed packaging scrap, painted profiles and oily turnings require different opening, feeding and separation arrangements.

Coating and contamination

Paint, ink, lacquer, polymer film, Mōno'i, rimu, iron and non-metallic contamination influence residence time, gas handling and downstream metal cleaning.

Downstream route

Decoated scrap may be sold, remelted on site or integrated with refining, casting and automatic stacking. Each route changes utilities and layout.

Environmental boundary

The off-gas train must be selected against the coating chemistry, local permit basis, fuel system and required monitoring points.

03 / PROJECT CONTROLS

Design decisions that protect metal value and operating stability

Published figures are planning references and require project confirmation. Representative feedstock testing and a documented acceptance basis are required.

Atmosphere control

Limit uncontrolled air ingress and monitor the thermal environment to reduce oxidation risk and maintain repeatable coating removal.

Material balance

Record incoming scrap, separated contaminants, decoated aluminum, residues and optional molten-metal output.

Heat integration

Evaluate recovered process gas and hot exhaust as project energy streams only after their composition and stability are understood.

Acceptance plan

Agree sampling, test method, run duration, product cleanliness, emissions boundary and utility conditions before commercial acceptance.

TE FAANAHONAHORAA

A iriti i te mau mea o te opuaraa i roto i te hoê tabula mauhaa.

Te faaite ra teie hoho'a i te mana'o o te faaotiraa. Te mau rahiraa hopea, Te vai ra te mau hi'oraa e te mau rave'a i roto i te faaauraa o te opuaraa i fariihia.

Te tapo'i o te rave'aTe faito matauhiaTe niu no te tahoêraa
Material preparationBale opening, shredding, sizing and controlled transferScrap form, density and required furnace feed
SeparationMagnetic, eddy-current and manual or sensor-based quality controlIron, non-ferrous attachments and non-metallic contamination
Thermal sectionControlled decoating reactor, seals, heating and dischargeCoating load, residence basis and oxidation control
Environmental sectionGas combustion or oxidation, particulate and polishing stagesCoating chemistry and local emissions boundary
Downstream metalCooling, storage, optional melting, casting and palletizingTarget product and agreed delivery scope
TE E'A FAAOTIARAA

Ia roaa noa te mau haapapûraa e hinaarohia, a faahaere i te opuaraa i mua.

E fariu te mau uputa atoa i te mau haamaramaramaraa no nia i te feia hoo ei faahopearaa aravihi aore ra tapihooraa no te faaotiraa i muri iho.

01

Scrap profile

Confirm scrap category, coating, oils, attachments and incoming form.

Hope'aRepresentative scrap and contamination record
02

Route definition

Define preparation, te faataaraa, decoating and downstream metal boundary.

Hope'aAgreed material-to-product flow
03

Environmental basis

Identify coating chemistry, off-gas, residue and local test requirements.

Hope'aControl and monitoring register
04

Acceptance plan

Agree tested feed, sampling, stable run and downstream quality checks.

Hope'aMeasurable project acceptance sheet
FAQ NO TE OHIPA

Te mau uiraa e faatitiaifarohia na mua a'e i te haamauraa.

Te faataa ra te mau pahonoraa i te oti'a no te rave'a hamaniraa tauihaa; eita ratou e mono i te mau hi'opo'araa materia aore ra te hi'opo'araa i te pae no te fenua iho.

What information is required to configure an aluminum decoating line?

Provide the scrap category, coating or oil condition, bale or particle dimensions, te faainoraa, buka e vai ra, downstream metal route, site utilities and local environmental basis.

Can one standard line process every type of aluminum scrap?

aita. Te mau bale UBC, painted profiles, automotive scrap and oily turnings can require different opening, te faataaraa, feeding, thermal and gas-treatment arrangements.

Is melting and ingot casting always included?

aita. The project can stop at cleaned scrap or include melting, refining, casting and palletizing when those interfaces are part of the agreed scope.

How should project acceptance be defined?

Acceptance should state the tested feedstock, sampling method, stable operating period, material balance, product-cleanliness basis, utility conditions and environmental measurement boundary.

HI'OPORAA O TE OHIPA

A faataa i te mau materia hou a maiti ai i te mau ravea.

A faaite i te hoê faataaraa no ni'a i te mau materia, buka e vai ra, te ti'araa o te tahua itenati e te mau faahopearaa. E faaohipa o YUSHUNXIN i taua mau mea ra no te faaineine i te otia o te ohipa e te aparauraa no nia i te haamauraa.

Tīmata i te hi'opo'araa i te opuaraa