O la matou UBC (Apa Meainu Fa'aaogaina) faiga teuteu tuusao integrates ma ogaumu liusuavai alumini, fa'atupuina se fa'agasologa tapuni tapuni. E ala i le aveeseina o paluga ma mea leaga a'o le'i liusuavai, o le faiga fa'ateleina fua faatatau toe fa'aleleia u'amea ao fa'aitiitia le fa'aaogaina o le malosi e 15–30%. O le so'oga fa'afefete-fa'aliusuava'i e fa'ate'a fa'alua le taulimaina, faaitiitia oxidation gau, ma fa'amautinoa le maualuga o le alumini alumini mo fa'aoga i lalo.

Talosaga ROI Iloiloga

Tu'ufa'atasiga Lelei Fa'avela

UBC deacquering so'otaga ma ogaumu liusuavai fa'aitiitia le fa'aaogaina o kesi e 15-30%. O le faiga decoating e tu'ufa'atasia sa'o ma le ogaumu fa'afefete fa'afefete fa'afefeteina fa'aleleia, faia o se ta'amilosaga vevela tapuni. O kasa vevela vevela mai le ogaumu liusua'i mua'i fa'avevela le potu fa'apala, a o le mama, UBC teuteu e ulu i totonu o le ogaumu i le maualuga o le vevela - faʻaitiitia le malosi e manaʻomia mo le liusuavai.. O lenei feso'ota'iga fa'avevela e fa'ate'aina ai le mana'omia mo afi fa'aausilali i le tulaga fa'aletonu ma fa'aititia ai le aofa'i o le kesi fa'alenatura i luga o le filifili fa'agasolo..

Download Lipoti Faasaoina Malosiaga

YUSHUNXIN ALUMINUM RECOVERY

Build the decoating line around the incoming aluminum scrap.

A connected project can combine size reduction, ferrous and non-ferrous separation, controlled thermal decoating, off-gas management, melting and ingot handling. The final scope depends on the coating system, scrap density, contamination and downstream metal specification.

Reference layout for an aluminum can shredding and thermal decoating line
01 / PROCESS ROUTE

From incoming UBC bales to a controlled furnace feed

The line should be configured as a material-to-output system rather than a standalone furnace.

  1. 01Receiving and bale opening
  2. 02Shredding and size control
  3. 03Magnetic and eddy-current separation
  4. 04Controlled thermal decoating
  5. 05Gas treatment and heat integration
  6. 06Optional melting, casting and palletizing
02 / CONFIGURATION BASIS

What changes the equipment list

A reliable proposal starts with the actual scrap profile and the agreed delivery boundary.

Feedstock form

Loose cans, compacted bales, mixed packaging scrap, painted profiles and oily turnings require different opening, feeding and separation arrangements.

Coating and contamination

Paint, ink, lacquer, polymer film, suauu, susu, iron and non-metallic contamination influence residence time, gas handling and downstream metal cleaning.

Downstream route

Decoated scrap may be sold, remelted on site or integrated with refining, casting and automatic stacking. Each route changes utilities and layout.

Environmental boundary

The off-gas train must be selected against the coating chemistry, local permit basis, fuel system and required monitoring points.

03 / PROJECT CONTROLS

Design decisions that protect metal value and operating stability

Published figures are planning references and require project confirmation. Representative feedstock testing and a documented acceptance basis are required.

Atmosphere control

Limit uncontrolled air ingress and monitor the thermal environment to reduce oxidation risk and maintain repeatable coating removal.

Material balance

Record incoming scrap, separated contaminants, decoated aluminum, residues and optional molten-metal output.

Heat integration

Evaluate recovered process gas and hot exhaust as project energy streams only after their composition and stability are understood.

Acceptance plan

Agree sampling, test method, run duration, product cleanliness, emissions boundary and utility conditions before commercial acceptance.

REFERENCE CONFIGURATION

Translate project facts into an equipment list.

This reference matrix shows the decision logic. Final quantities, models and interfaces belong in the approved project proposal.

System blockTypical scopeConfiguration basis
Material preparationBale opening, shredding, sizing and controlled transferScrap form, density and required furnace feed
SeparationMagnetic, eddy-current and manual or sensor-based quality controlIron, non-ferrous attachments and non-metallic contamination
Thermal sectionControlled decoating reactor, seals, heating and dischargeCoating load, residence basis and oxidation control
Environmental sectionGas combustion or oxidation, particulate and polishing stagesCoating chemistry and local emissions boundary
Downstream metalCooling, teuina, optional melting, casting and palletizingTarget product and agreed delivery scope
STAGE-GATED DECISION PATH

Advance the project only when the required evidence is available.

Each gate turns customer information into a defined technical or commercial output for the next decision.

01

Scrap profile

Confirm scrap category, coating, oils, attachments and incoming form.

OutputRepresentative scrap and contamination record
02

Route definition

Define preparation, tete'a, decoating and downstream metal boundary.

OutputAgreed material-to-product flow
03

Environmental basis

Identify coating chemistry, off-gas, residue and local test requirements.

OutputControl and monitoring register
04

Acceptance plan

Agree tested feed, sampling, stable run and downstream quality checks.

OutputMeasurable project acceptance sheet
PROJECT FAQ

Questions to resolve before configuration.

Answers define the engineering boundary; they do not replace representative material testing or local compliance review.

What information is required to configure an aluminum decoating line?

Provide the scrap category, coating or oil condition, bale or particle dimensions, fa'aleagaina, available volume, downstream metal route, site utilities and local environmental basis.

Can one standard line process every type of aluminum scrap?

No. UBC bale, painted profiles, automotive scrap and oily turnings can require different opening, tete'a, feeding, thermal and gas-treatment arrangements.

Is melting and ingot casting always included?

No. The project can stop at cleaned scrap or include melting, refining, casting and palletizing when those interfaces are part of the agreed scope.

How should project acceptance be defined?

Acceptance should state the tested feedstock, sampling method, stable operating period, material balance, product-cleanliness basis, utility conditions and environmental measurement boundary.

PROJECT ENGINEERING REVIEW

Define the material before selecting the equipment.

Share a representative material description, available volume, site status and target outputs. YUSHUNXIN will use those facts to prepare the relevant process boundary and configuration discussion.