ປະສົມປະສານການແກ້ໄຂບັນຫາອຸດສາຫະກໍາແລະຊັບພະຍາກອນສີຂຽວໂດຍ YUSHUNXIN

YUSHUNXIN ສໍາເລັດການແກ້ໄຂອຸດສາຫະກໍາສີຂຽວ

CONTACT YUSHUNXIN · GREEN INDUSTRIAL PROJECT DESK

Contact the YUSHUNXIN Green Industrial Project Team

Discuss a material stream, equipment requirement or project plan directly, or complete the structured brief so the team can review the operating basis, site interfaces and current decision stage.

PREPARE BEFORE SUBMITTING

Five facts make the first response more useful.

01

ຄອບຄົວໂຄງການ

ແບັດເຕີຣີ, PV, pyrolysis, aluminum processing or another material stream.

02

ສະພາບວັດສະດຸ

ທີ່ມາ, ອົງປະກອບ, ຮູບແບບການປ້ອນຂໍ້ມູນ, ຂະໜາດ, ຄວາມຊຸ່ມຊື່ນ, contamination and pre-treatment.

03

Operating and output basis

Available volume, expected schedule, target streams and the capacity basis you are evaluating.

04

Site and system interfaces

Location, ອຸປະໂພກຕ່າງໆ, ການຄວບຄຸມສິ່ງແວດລ້ອມ, readiness, retrofit requirements and delivery interfaces.

05

Decision stage

Research, feasibility, configuration comparison, budget, sourcing or procurement.

    ຈົດໝາຍໂຄງການ

    ເລີ່ມຕົ້ນດ້ວຍການຕິດຕໍ່ຂອງທ່ານ. ສ້າງເສັ້ນທາງໂຄງການທີ່ຖືກຕ້ອງ.

    ສີ່ຂັ້ນຕອນສັ້ນໆບັນທຶກຂໍ້ເທັດຈິງຂອງໂຄງການຂອງເຈົ້າໃນຂະນະທີ່ເຈົ້າໄປ.

    01

    ເສັ້ນທາງຕິດຕໍ່ແລະໂຄງການ

    ໃຜຄວນຈະໄດ້ຮັບການຕິດຕາມ, ແລະກະແສວັດສະດຸໃດມີສ່ວນຮ່ວມ?






    02

    ວັດສະດຸແລະພື້ນຖານການດໍາເນີນງານ

    ອະທິບາຍການປ້ອນຂໍ້ມູນກ່ອນທີ່ຈະສົນທະນາລາຍການອຸປະກອນ.



    03

    ຂັ້ນຕອນການຕັດສິນໃຈ ແລະຈຸດສຳຄັນຕໍ່ໄປ

    ນີ້ຊ່ວຍໃຫ້ທີມງານທຸລະກິດສະຫນອງຂັ້ນຕອນຕໍ່ໄປທີ່ເຫມາະສົມ.




    ກ່ອນທີ່ຈະສົ່ງ

    ທົບທວນຂໍ້ເທັດຈິງຂອງໂຄງການ.

    ຄວາມອາດສາມາດສຸດທ້າຍ, ການຕັ້ງຄ່າ, ຮູບແບບ, ຄຸນນະພາບຜົນຜະລິດ, ກໍານົດເວລາການຈັດສົ່ງແລະເງື່ອນໄຂການຄ້າຖືກຢືນຢັນພຽງແຕ່ຫຼັງຈາກການທົບທວນຄືນວັດສະດຸແລະສະຖານທີ່.


    ໄປທີ່ທາງເທິງ