រួមបញ្ចូលគ្នានូវដំណោះស្រាយឧស្សាហកម្ម និងធនធានបៃតងដោយ YUSHUNXIN

YUSHUNXIN ដំណោះស្រាយឧស្សាហកម្មបៃតងពេញលេញ

CONTACT YUSHUNXIN · GREEN INDUSTRIAL PROJECT DESK

Contact the YUSHUNXIN Green Industrial Project Team

Discuss a material stream, equipment requirement or project plan directly, or complete the structured brief so the team can review the operating basis, site interfaces and current decision stage.

PREPARE BEFORE SUBMITTING

Five facts make the first response more useful.

01

គ្រួសារគម្រោង

ថ្ម, PV, pyrolysis, aluminum processing or another material stream.

02

Material condition

ប្រភព, សមាសភាព, ទម្រង់បញ្ចូល, ទំហំ, សំណើម, contamination and pre-treatment.

03

Operating and output basis

Available volume, expected schedule, target streams and the capacity basis you are evaluating.

04

Site and system interfaces

Location, ឧបករណ៍ប្រើប្រាស់, ការត្រួតពិនិត្យបរិស្ថាន, readiness, retrofit requirements and delivery interfaces.

05

Decision stage

Research, feasibility, configuration comparison, ថវិកា, sourcing or procurement.

    លិខិតគម្រោង

    ចាប់ផ្តើមជាមួយទំនាក់ទំនងរបស់អ្នក។. កសាងផ្លូវគម្រោងត្រឹមត្រូវ។.

    ជំហានខ្លីៗចំនួនបួនរក្សាទុកការពិតនៃគម្រោងរបស់អ្នកនៅពេលអ្នកទៅ.

    01

    ទំនាក់ទំនង និងផ្លូវគម្រោង

    អ្នកណាគួរទទួលការតាមដាន, និងស្ទ្រីមសម្ភារៈណាដែលពាក់ព័ន្ធ?






    02

    សម្ភារៈនិងមូលដ្ឋានប្រតិបត្តិការ

    ពិពណ៌នាអំពីចំណីមុនពេលពិភាក្សាអំពីបញ្ជីឧបករណ៍.



    03

    ដំណាក់កាលនៃការសម្រេចចិត្ត និងដំណាក់កាលបន្ទាប់

    នេះជួយក្រុមអាជីវកម្មផ្តល់នូវជំហានបន្ទាប់សមស្រប.




    មុនពេលដាក់ស្នើ

    ពិនិត្យមើលការពិតនៃគម្រោង.

    សមត្ថភាពចុងក្រោយ, ការកំណត់រចនាសម្ព័ន្ធ, ប្លង់, គុណភាពទិន្នផល, កាលវិភាគនៃការដឹកជញ្ជូន និងលក្ខខណ្ឌពាណិជ្ជកម្មត្រូវបានបញ្ជាក់តែបន្ទាប់ពីការត្រួតពិនិត្យសម្ភារៈ និងគេហទំព័រ.


    ទៅកាន់កំពូល