Penyelesaian industri hijau dan pemulihan sumber bersepadu oleh YUSHUNXIN

YUSHUNXIN penyelesaian industri hijau yang lengkap

CONTACT YUSHUNXIN · GREEN INDUSTRIAL PROJECT DESK

Contact the YUSHUNXIN Green Industrial Project Team

Discuss a material stream, equipment requirement or project plan directly, or complete the structured brief so the team can review the operating basis, site interfaces and current decision stage.

PREPARE BEFORE SUBMITTING

Five facts make the first response more useful.

01

Keluarga projek

Battery, PV, pyrolysis, aluminum processing or another material stream.

02

Material condition

Sumber, gubahan, format input, saiz, lembapan, contamination and pre-treatment.

03

Operating and output basis

Jumlah yang tersedia, expected schedule, target streams and the capacity basis you are evaluating.

04

Site and system interfaces

Location, utiliti, kawalan alam sekitar, readiness, retrofit requirements and delivery interfaces.

05

Decision stage

Research, kebolehlaksanaan, configuration comparison, budget, sourcing or procurement.

    SURAT PROJEK

    Mulakan dengan kenalan anda. Bina laluan projek yang betul.

    Empat langkah pendek simpan fakta projek anda semasa anda pergi.

    01

    Kenalan dan laluan projek

    Siapa yang patut menerima susulan, dan aliran material mana yang terlibat?






    02

    Bahan dan asas operasi

    Terangkan bahan mentah sebelum membincangkan senarai peralatan.



    03

    Peringkat keputusan dan pencapaian seterusnya

    Ini membantu pasukan perniagaan menyediakan langkah seterusnya yang sesuai.




    SEBELUM MENGHANTAR

    Semak fakta projek.

    Kapasiti akhir, konfigurasi, susun atur, kualiti keluaran, jadual penghantaran dan terma komersial disahkan hanya selepas semakan bahan dan tapak.


    Pergi ke Atas