Suluhu zilizojumuishwa za viwandani na urejeshaji rasilimali na YUSHUNXIN

YSHUNXIN kamili ya ufumbuzi wa viwanda vya kijani

CONTACT YUSHUNXIN · GREEN INDUSTRIAL PROJECT DESK

Contact the YUSHUNXIN Green Industrial Project Team

Discuss a material stream, equipment requirement or project plan directly, or complete the structured brief so the team can review the operating basis, site interfaces and current decision stage.

PREPARE BEFORE SUBMITTING

Five facts make the first response more useful.

01

Familia ya mradi

Battery, PV, pyrolysis, aluminum processing or another material stream.

02

Material condition

Chanzo, utungaji, umbizo la kuingiza, ukubwa, unyevunyevu, contamination and pre-treatment.

03

Operating and output basis

Kiasi kinachopatikana, expected schedule, target streams and the capacity basis you are evaluating.

04

Site and system interfaces

Location, huduma, udhibiti wa mazingira, readiness, retrofit requirements and delivery interfaces.

05

Decision stage

Research, uwezekano, configuration comparison, bajeti, sourcing or procurement.

    BARUA YA MRADI

    Anza na mwasiliani wako. Tengeneza njia sahihi ya mradi.

    Hatua nne fupi zihifadhi ukweli wa mradi wako unapoendelea.

    01

    Mawasiliano na njia ya mradi

    Nani anapaswa kupokea ufuatiliaji, na ni mkondo gani wa nyenzo unahusika?






    02

    Nyenzo na msingi wa uendeshaji

    Eleza malisho kabla ya kujadili orodha ya vifaa.



    03

    Hatua ya uamuzi na hatua inayofuata

    Hii husaidia timu ya biashara kutoa hatua ifuatayo inayofaa.




    KABLA YA KUWASILISHA

    Kagua ukweli wa mradi.

    Uwezo wa mwisho, usanidi, mpangilio, ubora wa pato, ratiba ya uwasilishaji na masharti ya kibiashara yanathibitishwa tu baada ya ukaguzi wa nyenzo na tovuti.


    Nenda Juu