YUSHUNXIN द्वारा एकीकृत हरियो औद्योगिक र संसाधन-रिकभरी समाधान

YUSHUNXIN पूर्ण हरियो औद्योगिक समाधान

CONTACT YUSHUNXIN · GREEN INDUSTRIAL PROJECT DESK

Contact the YUSHUNXIN Green Industrial Project Team

Discuss a material stream, equipment requirement or project plan directly, or complete the structured brief so the team can review the operating basis, site interfaces and current decision stage.

PREPARE BEFORE SUBMITTING

Five facts make the first response more useful.

01

परियोजना परिवार

Battery, PV, pyrolysis, aluminum processing or another material stream.

02

Material condition

स्रोत, रचना, इनपुट ढाँचा, आकार, आर्द्रता, contamination and pre-treatment.

03

Operating and output basis

Available volume, expected schedule, target streams and the capacity basis you are evaluating.

04

Site and system interfaces

Location, उपयोगिताहरू, वातावरणीय नियन्त्रणहरू, readiness, retrofit requirements and delivery interfaces.

05

Decision stage

Research, feasibility, configuration comparison, budget, sourcing or procurement.

    परियोजना पत्र

    तपाइँको सम्पर्क संग सुरु गर्नुहोस्. सही परियोजना मार्ग निर्माण गर्नुहोस्.

    चार छोटो चरणहरू तपाईं जाँदा तपाईंको परियोजना तथ्यहरू बचत गर्नुहोस्.

    01

    सम्पर्क र परियोजना मार्ग

    फलोअप कसले प्राप्त गर्नुपर्छ, र कुन सामग्री प्रवाह समावेश छ?






    02

    सामाग्री र सञ्चालन आधार

    उपकरण सूचीमा छलफल गर्नु अघि फिडस्टकको वर्णन गर्नुहोस्.



    03

    निर्णय चरण र अर्को माइलस्टोन

    यसले व्यापार टोलीलाई उपयुक्त अर्को चरण प्रदान गर्न मद्दत गर्दछ.




    पेश गर्नु अघि

    परियोजना तथ्यहरू समीक्षा गर्नुहोस्.

    अन्तिम क्षमता, कन्फिगरेसन, लेआउट, उत्पादन गुणस्तर, वितरण तालिका र व्यावसायिक सर्तहरू सामग्री र साइट समीक्षा पछि मात्र पुष्टि गरिन्छ.


    शीर्षमा जानुहोस्