YUSHUNXIN द्वारे एकात्मिक हरित औद्योगिक आणि संसाधन-पुनर्प्राप्ती उपाय

YUSHUNXIN पूर्ण ग्रीन औद्योगिक उपाय

CONTACT YUSHUNXIN · GREEN INDUSTRIAL PROJECT DESK

Contact the YUSHUNXIN Green Industrial Project Team

Discuss a material stream, equipment requirement or project plan directly, or complete the structured brief so the team can review the operating basis, site interfaces and current decision stage.

PREPARE BEFORE SUBMITTING

Five facts make the first response more useful.

01

प्रकल्प कुटुंब

बॅटरी, पी.व्ही, पायरोलिसिस, aluminum processing or another material stream.

02

सामग्रीची स्थिती

स्त्रोत, रचना, इनपुट स्वरूप, आकार, ओलावा, contamination and pre-treatment.

03

Operating and output basis

उपलब्ध व्हॉल्यूम, expected schedule, target streams and the capacity basis you are evaluating.

04

Site and system interfaces

Location, उपयुक्तता, पर्यावरणीय नियंत्रणे, readiness, retrofit requirements and delivery interfaces.

05

Decision stage

Research, व्यवहार्यता, configuration comparison, बजेट, sourcing or procurement.

    प्रकल्प पत्र

    तुमच्या संपर्कापासून सुरुवात करा. योग्य प्रकल्प मार्ग तयार करा.

    चार लहान पायऱ्या तुम्ही जाताना तुमच्या प्रकल्पातील तथ्ये जतन करा.

    01

    संपर्क आणि प्रकल्प मार्ग

    पाठपुरावा कोणाला मिळावा, आणि कोणत्या सामग्रीचा प्रवाह गुंतलेला आहे?






    02

    साहित्य आणि ऑपरेटिंग आधार

    उपकरणांच्या यादीवर चर्चा करण्यापूर्वी फीडस्टॉकचे वर्णन करा.



    03

    निर्णयाचा टप्पा आणि पुढचा टप्पा

    हे व्यवसाय संघाला योग्य पुढील पायरी प्रदान करण्यात मदत करते.




    सबमिट करण्यापूर्वी

    प्रकल्पातील तथ्यांचे पुनरावलोकन करा.

    अंतिम क्षमता, कॉन्फिगरेशन, मांडणी, आउटपुट गुणवत्ता, वितरण वेळापत्रक आणि व्यावसायिक अटींची पुष्टी सामग्री आणि साइट पुनरावलोकनानंतरच केली जाते.


    वर जा